![](/html/b2/b2f6/b2f6cd3a4461f805248ce3a5a6a878d0f78742aa888c14c47a4f488df118f68e/bg1.png)
K35A
VAN AIR CONDITIONER ASSEMBLY
Installation Manual
HEYUAN REXKING INDUSTRIAL CO., LTD
![](/html/b2/b2f6/b2f6cd3a4461f805248ce3a5a6a878d0f78742aa888c14c47a4f488df118f68e/bg2.png)
Forward
The correct installation is most important to ensure optimum utilities, to
improve the reliability and economic and to reduce the downtime. The
principle of the manual is to provide technical instruction on top – installed air
conditioner assembly for the technicians before and after sales services. Read
and follow the instruction mentioned in the user manual carefully. Moreover, it
also provides the installation guideline on matching air conditioner
manufacturers.
![](/html/b2/b2f6/b2f6cd3a4461f805248ce3a5a6a878d0f78742aa888c14c47a4f488df118f68e/bg3.png)
Content
1. Safety Precaution ············································································ 3
2. Technical Preparation Before Installation ······································· 4
3. Air Conditioner Guarantee ······························································ 5
4. Assembly Selection ········································································ 5
5. Installation Assembly ······································································ 6
6. Font panel commands ···································································· 12
7. Maintenance ··················································································· 12
8. Troubleshooting ·············································································· 13
Table1 ·································································································· 14
Table 2 ································································································· 15
Appendix1···························································································· 16
![](/html/b2/b2f6/b2f6cd3a4461f805248ce3a5a6a878d0f78742aa888c14c47a4f488df118f68e/bg4.png)
1.Safety Precaution
1). Wear working suit, working shoes when making operation. Do not
wear slippers, short pants or waistcoat when installing the equipment.
2). Wear goggle or safety glasses preventing the dust or chips falling into
the eyes when looking up.
3). Do not damage van body and the appearance of the air conditioner.
Clean the carriage after installation.
4). Pay more attention to the position of oil tank when welding. Do not
working near oil tank.
![](/html/b2/b2f6/b2f6cd3a4461f805248ce3a5a6a878d0f78742aa888c14c47a4f488df118f68e/bg5.png)
5). Check the isolation of the cable connection when connecting to 220V
power supply.
6). The refrigerant will produce poisonous gases when there is bright fire.
The personnel will suffocate or die when taking breathe the poisonous
gases. The spray of the refrigerant will hurt the body. The protection is
the most important before installation. Take the following methods if
the refrigerant splashing into the eyes or on the skin: ① Wash eyes or
damaged skin with lots of water (do not rub the eyes or skin); ② Apply
the Vaseline on the skin; ③ Go to the hospital immediately for special
treatment;
7). Do not refrigerate when closing the exhaust valve of the compressor,
preventing the damages on personnel and machine due to high
pressure.
8). Shut off the power supply when making repair, preventing the fireworks
due to short circuit.
9). Be careful when drilling holes on the van. These holes might reduce
the construction strength and result electric shock and fireworks.
10). Keep your hands far away from rotating parts, such as fan when the
equipment is running.
2. Technical preparation before installation
1). Positioning the air conditioner
![](/html/b2/b2f6/b2f6cd3a4461f805248ce3a5a6a878d0f78742aa888c14c47a4f488df118f68e/bg6.png)
KR serial air conditioner assembly should be installed on the top of the
van. The air return will be absorbed from the bottom to the top and the
vented air will be discharged form the top to the interior of van.
2). Van body isolation
The top van, surrounding, air channel and ventilator must be isolated
correctly, comply with the testing requirement of JT/T216-95 issued by
transportation department. Check the following items: ① the isolation
thickness of the van body surrounding of top and engine should be
higher than ≥30mm; ② The joints between body, top van and air
channel should be isolated, avoiding the loss of refrigeration; ③ Ensure
the performance of door and windows of the van; ④ The installation of
all parts should be far from the heat source on considerations of repair
and maintenance.
3. Guarantee
We will provide maintenance and repair free of charge as well as
replacement for damaged parts within 12 months guarantee from the
date of sales. The guarantee will be ensured with our guideline and
instruction. KINGTEC will not take the responsibility on misuse incorrect
filter, normal delivery, adjusting and transportation damages. The
Certificate Guarantee is the only one. No other companies or individual
will be authorized to provide maintenance. The beneficial of guarantee is
the buyer, transferred person or others relating to the products.