KING DS-2B User Manual

LIMITED WARRANTY
The DS-2B is warranted against defects in workmanship and materials for two years from date of sale. This warranty does not apply to damage resulting from accident, misuse, or alteration nor where connected voltage is more than 5% above the configured operating voltage, nor to equipment improperly installed or wired or maintained in violation of this Owner’s Manual. No other written or oral warranty applies. No employee, agent, dealer or other person is authorized to give any warranties on behalf of ASE.
CAUTION: Read all instructions carefully before installation. Save this Installation Manual for future reference.
DS-2B
The customer shall be responsible for all costs incurred in the removal or reinstallation and shipping of the product for repairs. Within the limitations of this warranty, inoperative units should be returned, freight prepaid, to ASE, and we will repair or replace, at our option, at no charge to you with return freight paid by ASE. It is agreed that such repair or replacement is the exclusive remedy available from ASE and that ASE IS NOT RESPONSIBLE FOR DAMAGES OF ANY KIND, INCLUDING INCIDENTAL AND CONSEQUENTIAL DAMAGE. Some states do not allow the exclusion or limitation of incidental or consequential damages so the above exclusion may not apply to you. The warranty gives you specific legal rights, and you may also have other rights which vary from state to state.
AUTOMATED SYSTEMS ENGINEERING, INC. 2519 E SAINT VRAIN ST COLORADO SPRINGS, COLORADO 80909 PHONE: 719-599-7477 FAX: 719-599-7482
Visit us on the Internet at: www.goase.com
RAIN/SNOW SENSOR CONTROLLER
INSTALLATION MANUAL
R
T
E
E
T
K
N
AUTOMATED SYSTEMS ENGINEERING
ENCLOSURE TYPE 3R
RAIN/SNOW SENSOR CONTROLLER
CONFORMS TO UL STD 508
CERTIFIED TO CAN/CSA STD C22.2 NO. 14
INPUT 100−120V AC 0.15 A 50/60 Hz 200−240V AC 0.15 A 50/60 Hz
CONTROL 30 A 240V AC, 20 A 30V DC
THIS UNIT MAY BE SUPPLIED BY MORE THAN ONE BREAKER
DS−2B
DANGER
CAUTION
I
CM
US
C
L
I
D
S
E
T
3175102
CONTROL SWITCH
MANUAL ON AUTOMATIC STANDBY/RESET
Manufactured By
AUTOMATED SYSTEMS ENGINEERING
2519 East Saint Vrain St Colorado Springs, Colorado 80909
General Safety Instructions
1. THIS UNIT SHOULD BE INSTALLED, OPENED, AND REPAIRED BY QUALIFIED PERSONNEL
ONLY!
CETTE UNITÉ DEVRAIT ÊTRE INSTALLÉE, OUVERTE, ET RÉPARÉE PAR LE PERSONNEL
QUALIFIÉ SEULEMENT!
2. To avoid shock hazard do not open the front cover with power connected to the DS-2B or any controlled
equipment.
Pour éviter la décharge électrique déconnectez toute la puissance avant d'ouvrir la couverture du DS-
2B.
3. To avoid fire hazard replace fuse F1 with a 1/2 Amp 250 VAC 2AG fast acting fuse ONLY. Pour éviter le risque d'incendie remplacez le fusible F1 par un fusible de 1/2 l'ampère 250 VCA 2AG
SEULEMENT.
Selecting a Mounting Location for the DS-2B
The interleaved grid on the top of the DS-2B is the precipitation sensor or “moisture grid.” The rubber “boot” protruding from the bottom of the enclosure is the temperature sensor. For reliable rain and snow detection the unit must be mounted in a location that exposes the moisture grid to a clear view of the sky. The unit should not be mounted directly under eaves or overhangs. It should not be mounted so close to the ground that it may become buried in snow. For proper temperature detection the DS-2B must be mounted outdoors, away from furnace vents, dryer vents, and other sources of heat. Note that, when powered, the DS-2B moisture grid will always remain hot the grid to continuously melt snow and evaporate both rain and snow from the grid.
The DS-2B can be mounted by screwing the base conduit hub onto an appropriate size free-standing conduit or by using the mounting holes in each corner of the enclosure.
DO NOT DRILL HOLES THROUGH THE ENCLOSURE FOR MOUNTING!
NE FONT PAS LES TROUS DE FORET PAR LA BOÎTE POUR LE SUPPORT!
This can allow water into the enclosure causing a potential shock hazard. It is recommended that a weatherproof junction box be mounted below the DS-2B for termination of the power and load pigtails to the building wiring.
Always Use Care When Replacing the Front Cover
Be sure the front cover gasket is not pinched or rolled. Do not overtighten the front cover screws.
INPUT POWER
VOLTAGE SELECT
GRID JACK
PROBE JACK
TEMP ADJUST
DELAY ADJUST
LOAD
2
. This is normal. This allows
CONFIGURATION SWITCH CONTROL/MONITOR JACK
SWITCH JACK
External Control/Monitor Operation
Pin Color Function
1 Green Standby/Reset 2 Black Manual On 3 Orange Deice On Mon 4 Red Deice On Mon 5 White Return
An external control/monitor jack is provided on the DS-2B. Order the optional CS-1 control/monitor cable to access this feature. Connecting Black to White will activate the “Manual On” function. Connecting Green to White will activate the “Standby/Reset” function. The Red/Orange leads are connected to an internal low power monitor relay. This relay, rated at 24 VAC/VDC at 400 ma, will close with the load relay and can be used to externally monitor activation of the sensor.
Moisture Grid Maintenance & Replacement
It is recommended that the DS-2B be powered down and the grid wiped clean with clear water at least once every 4 months. Heavy deposits may be removed using Scotch-Brite. However, after a number of years, the corrosive elements left behind when water is evaporated out of the moisture grid will eventually damage the grid rings. The moisture grid can be easily replaced by ordering and installing an MG-1 “Moisture Grid Assembly” and following the procedure below:
THIS PROCEDURE SHOULD ONLY BE PERFORMED BY QUALIFIED PERSONNEL!
CE PROCÉDÉ DEVRAIT SEULEMENT ÊTRE EXÉCUTÉ PAR LE PERSONNEL QUALIFIÉ!
Open all power and load breakers connected to the DS-2B. Open the front cover and remove the cable from the Grid Jack. While holding the reducing bushing, unscrew and remove the old moisture grid. Install the supplied thread sealing tape, place the new grid into the top hole and screw the assembly into the reducing bushing. Tighten the grid hand tight plus ¼ turn. Reconnect the new cable to the Grid Jack. Confirm that the four connector pins are properly aligned with the jack. Close the front cover, confirming that the front cover gasket is properly sealed. Reapply power.
Always Use Care When Replacing the Front Cover
Be sure the front cover gasket is not pinched or rolled. Do not overtighten the front cover screws.
Preseason Snow Detection Testing
It is always a good idea to test the operation of the DS-2B prior to the winter seas on. Procure some clean water and, if the outdoor temperature is above the trigger point, a can of spray component cooler (Radio Shack Part #64-4321 or equivalent.) Clean the moisture grid following the procedure outlined above and allow it to dry. Apply power to the DS-2B and drip some of the water onto the moisture grid, and then spray the temperature sensor protruding from the base of the enclosure with the component cooler. Once the temperature sensor has reached the trigger point with water still present on the grid the DS-2B will activate. The user should hear the internal control relay close. Proper operation has been confirmed. Allow the grid to dry completely. To clear the Delay-Off timer place the override switch into “Standby/Reset”, and then back to the “Automatic” position.
7
Loading...
+ 2 hidden pages