Keystone YSTN1021 Installation & Assembly

INSTALLATION INSTRUCTIONS
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT- Save these
instructions for local inspector s use.
IMPORTANT- Observe all
governing codes and ordianaces.
Note to Installer- Be sure to leave these
instructions with the Consumer.
instructions for futrue reference.
Skill level- Installatio of this appliance
requires basic mechanical skills.
Completion time- Approximately 1 hour.
We recommend that two people install this product. Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the Warranty. You MUST use all supplied parts and use proper installation procedures as described in these instructions when installing this air conditioner.
CAUTION
Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.
Do not change the plug on the power cord of the air conditioner.
Aluminum house wiring may present special problems- consult a qualified electircian.
When handling unit, be careful to avoid cuts from sharp metal edges and aluminum fins on front and rear coils.
TOOLS YOU WILL NEED
Screwdriver
Level
TOOLS YOU MAY USE
WIN DOW REQUI REMENTS
Your air conditioner is designed to install in standard double hung windows with opening widths of 23 to 36 inches(584mm to 914mm) .
H
1000 0~12000Btu/h
H
Model
600 0 ~800 0Btu/ h
14 (356mm ) 15-1/2 (394 mm)
Table 1
Screwdriver
Pencil
Ruler or tape measure
Scissors or knife
NOTE:
Save Carton and these Installation Instructions for future reference. The carton is the best way to store unit during winter, or when not in use.
4
INSTALLATION INSTRUCTIONS
PREPARE TH E WINDOW
Low e r sas h mu st open sufficientl y to allow a cle ar vertical opening (H) of followi ng size (see Table 1). Side lo uv ers and the rear of the AC must have clear air spa ce to all o w e no ugh air flow th rough the condense r,for heat rem oval. T he re ar of t he unit must be outdoo rs, not inside a bui ldi ng or gara ge.
Mounting Hard ware
3/ 4 (or 1/ ) Scre ws
(7 )
A: Remo ve th e air co nditioner from th e carton and
place on a fl at surface.
B: Remo ve top rail from th e packaging material a s
shown in Fig. A.
2
Lock Frame
(2)
Sash Lock
(1)
Wind ow s as h
sea l fo a m
PREPARE AIR CONDITIONER
Top Rail Hardware
(1)
C: Align the h ole in the top rail with those in t he top
of the unit as shown in Fig.B
Fi g.B
D: Sec ure the t op rail to th e uni t with t he 3/8 Screws
as show n in Fig.C.
Fig .C
NOTE:
NOTE: The to p rai l hardware and the Fig.A, Fig.B an d Fig.C are not applicable t o the units more than 10 000Btu/ h.Before installing unit, the top rail must be asse mb led on the unit (For <100 00Btu/h models only).
For sa fe ty reasons, all fo ur (4) screws MUST be sec ur ely fastened.
3/8 S crews
(4)
Packaging
Top Rail
(1 )
Fig.A
Top Rai l
IN STALL THE ACCO RDION PANELS
NOTE: Top rai l and Sl iding Panels at each side are
offset to prov ide the proper pitch to the rear of (5/16 ). This is n ecessary for proper c on dense d water utilization and drainage . If you a re not usi ng the Side Panels for any re ason, this pitch to the r ea r must be maintained.
A.Place unit on f loo r, a b ench or
a table. Hold the Ac co rd ion Pan el in on e ha nd and gently pull back the cent er to fr ee the open end. See Fig.1
Fig.1
5
Loading...
+ 2 hidden pages