
Quick Start Guide
F02/EPI2 Base and OM1 Card
VCIOM-08536-US Rev. 0
F02/EPI2 Quarter-Turn
Electric Actuator
Base and OM1 Card
April 2018
Quick Start Guide
VCIOM-08536-US Rev. 0
Base Card
F02/EPI2 Quarter-Turn Electric Actuator
Rotary Switch Settings
Move switch SW4 to position
Configurations
CLOSE LIMIT by position
Drive the actuator to
the CLOSE position
using the handwheel
OPEN LIMIT by position
Drive the actuator to
the OPEN position
using the handwheel
CLOSE LIMIT by torque 2 0 (*)
OPEN LIMIT by torque 3 0 (*)
CLOSING speed 4
OPENING speed 5
% CLOSING torque 6
% OPENING torque 7
CW/CCW 8
BLINKER/local selector 4
Note:
(*) Factory
PRE-INSTALLATION: See VCIOM-2881 INSTALLATION AND MAINTENANCE INSTRUCTIONS. Not performing the following procedures will invalidate the product warranty.
INSTALLATION: To assemble the actuator onto the valve proceed as follows:
a. Verify proper mounting hardware.
b. Verify proper electrical service to the actuator
c. Lubricate the valve stem with oil or grease to make the assembly easier: pay attention not to contaminate with lubricant the ange surfaces which transmit the actuator torque.
d. Clean the valve ange and remove anything that might prevent a perfect adherence to the actuator ange and especially all traces of grease.
e. Install the actuator onto the valve so that the shaft out put drive enters the groove of the stem extension. This coupling must take place without forcing and only with the weight of the
actuator.
f. Ensure actuator and valve are in same orientation when bolting together.
g. With the handwheel, operate the actuator to verify it moves the valve smoothly.
indicated in each row
2 1 (*)
0 0
3 1 (*)
1 0
WARNING
The conguration must be done while the actuator is powered on. As a consequence, all conguration operations must be carried out by specically qualied personnel for operations on
powered electronic cards. Hazardous voltages may be present. Before connecting power to the actuator, check that the voltages are correct and according to the nameplate data. Improper power
supply will cause permanent damage to the electrical components. Actuator conguration programming requires removal of the actuator cover. Refer to VCIOM-2881 IOM for instructions.
Move switch SW6 to position
indicated in each row
4
6 (*)
8
2 = 50%
5 = 75%
9 = 100% (*)
0 = CW (*)
1 = CCW
0 = off (*)
1 = Blinker
2 = Loc. Sel.
See
table 1
SW3
Enter set up conguration moving SW3 to ON
Conrm by
SW5
PUSH
Red LED
LED lights up once
LED lights up once
Operate the
actuator to direction
bylocal/remote
control and wait
until it stops by
torque
LED lights up once
Figure 1 Model 063-125
SW3
Green LED
Power ON
Figure 2 Model 250-500-1000-2000
Exit set up conguration moving SW3 to 1 (Run Setting)
Green LED
Power ON
Table 1.
Operating Times
Nominal torque
Model
063 63/600 15 28 48
125 125/1300 15 28 48
250 250/2500 15 28 48
500 500/5100 15 28 48
1000 1000/9100 24 45 80
2000 2000/17700 53 100 180
(Nm/lb.in.)
F02/EPI2 Base and OM1 Card
April 2018
Dip switch
SW3
Rotary switch
SW4
Dip switch
SW3
Rotary switch
SW6
Push button
SW5
Red LED
Enter configuration
Rotary switch
SW6
Push button
SW5
Red LED
Enter configuration
Rotary switch
SW4
Operating time (secs 90o) at selected step
8 6 4

Quick Start Guide
Input Signal Configuration
VCIOM-08536-US Rev. 0
OM1 Card
F02/EPI2 Quarter-Turn Electric Actuator
Rotary Switch Settings
Configurations
Move switch SW8 to
position indicated in
each row
Move switch SW7 to
position indicated in
each row
Move switch SW9 to
position indicated in
each row
SW4
Conrm
by
SW2
Red LED
SW4
Figure 3
Enter
Configuration
Red LED
Rotary Switch
SW8 SW7 SW9
F02/EPI2 Base and OM1 Card
April 2018
Confirmation Push Button
SW2
SW5
RELAYS LS3-LS5 7
RELAYS LS4-LS6 8
POSITION Relays LS3 0 0 to 9 [0=(*)]
POSITION Relays LS4 1 0 to 9 [3=(*)]
POSITION Relays LS5 2 0 to 9 [7=(*)]
POSITION Relays LS6 3 0 to 9 [9=(*)]
SET Input as “4-20mA” 9
SET 0% input 4-20mA
SET 100% input 4-20mA 1 = 20mA (*)
SET Input as “0-10V”
Feedback mA or Vdc
Modulation
Table 2.
SW7 Position Relays 0 1 2 3 4 5 6 7 8 9
Description Inactive 2% 12,50% 25% 37,50% 50% 62,50% 75% 87,50% 99%
Note:
(*) Factory default data
PRE-INSTALLATION: See the BASE CARD procedure.
INSTALLATION: See the BASE CARD procedures.
WARNING
For complete Instruction & Warning see the VCIOM-01494 INSTALLATION AND MAINTENANCE INSTRUCTIONS. HARDWARE conguration MUST be done with system
OFF (NO power supply).SW3 and SW5 position in order to set the INPUT signal type.
HARDWARE conguration (SW1/3/5/6): This conguration is an Hardware setting; it’s mandatory to do it with power off (NO POWER SUPPLY)
4
9
0=break
1=make (*)
0=off
1=on (*)
0 = 4mA (*)
0=off (*)
1=on
2= mA (*)
3= Volt
0=off (*)
1=on
See table 2
Any position
4
Any position
5
1
3
Push
LED lights up once
Enter set up conguration moving SW4 to ON
Exit set up conguration moving SW4 to 1 (Run Setting)
Input Signal Configuration
Enable Configuration Mode
0-10V ON OFF OFF
4-20mA OFF ON ON
0-10V OFF ON ON OFF ON
4-20mA ON OFF OFF ON OFF
SW3
SW4
SW6 SW1
Output Signal Configuration
Hardware Configuration
Input Signal
SW3 SW5
1 2 1
Output Signal
SW1 SW6
1 2 3 4 1
World Area Con÷guration Centers (WACC) offer sales support, service,
inventory and commissioning to our global customers.
Choose the WACC or sales of÷ce nearest you:
NORTH & SOUTH AMERICA
19200 Northwest Freeway
Houston TX 77065
USA
T +1 281 477 4100
Av. Hollingsworth
325 Iporanga Sorocaba
SP 18087-105
Brazil
MIDDLE EAST & AFRICA
P. O. Box 17033
Jebel Ali Free Zone
Dubai
T +971 4 811 8100
P. O. Box 10305
Jubail 31961
Saudi Arabia
T +966 3 340 8650
T +55 15 3413 8888
24 Angus Crescent
ASIA PACIFIC
Longmeadow Business Estate
East
No. 9 Gul Road
#01-02 Singapore 629361
T +65 6777 8211
P.O. Box 6908 Greenstone
1616 Modderfontein Extension 5
South Africa
T +27 11 451 3700
No. 1 Lai Yuan Road
Wuqing Development Area
Tianjin 301700
P. R. China
T +86 22 8212 3300
EUROPE
Holland Fasor 6
Székesfehérvár 8000
Hungary
T +36 22 53 09 50
Strada Biffi 165
29017 Fiorenzuola d’Arda (PC)
Italy
T +39 0523 944 411
For complete list of sales and manufacturing sites, please visit
www.emerson.com/actuationtechnologieslocations
Or contact us at info.actuation technologies@emerson.com
www.emerson.com
©2018 Emerson. All rights reserved.
The Emerson logo is a trademark and service mark of Emerson Electric Co.
The contents of this publication are presented for information purposes
only, and while every effort has been made to ensure their accuracy,
they are not to be construed as warranties or guarantees, express or
implied, regarding the products or services described herein or their
use or applicability. All sales are governed by our terms and conditions,
which are available on request. We reserve the right to modify or
improve the designs or specications of our products at any time
without notice.