KEYSTONE SLURRY CONTROL VALVES
FIGURE 638 SERIES E/SERIES 2
Complete assembly instructions for DN 40 - 200 Class 150, 300 and 600 slurry control valves
IMPORTANT NOTES FOR VALVE ASSEMBLY
a) Use silicon lubricant on all O-rings. b) Use soft dolly’s for assembling components
when necessary.
c) Clean all reusable components before
reassembly.
d) All fasteners to be coated with anti-seize
compound.
e) Execute EXTREME CAUTION when
assembling valves with ceramic components.
f) If components do not fit DO NOT force them.
ASSEMBLY PROCEDURE
2. Preform packing (15) in upper insert (7) using shaft (6) and gland collar (14)
3. Fit O-rings (16) on both upper and lower inserts (7/8).
4. Fit disc end spacer ring (10) over disc end spacer loader (11) then fit O-rings (22, 23 into disc end spacers (10, 11).
5. Fit the liner (2) into the body (1) ensuring correct bore alignment.
6. Load the disc end spacers (10, 11) into the body and liner shaft bore cavities.
Note: It is important to load spacers from
the body, inwards to avoid O-ring damage.
7. Fit disc springs (12) in behind the disc end spacers (10, 11).
Note: Springs must be installed with tapers
opposing to form gaps between springs (see diagram over leaf).
8. Fit upper and lower inserts (7, 8) loosely into the body bores and take up (do not tighten the upper and lower insert retaining screws (19, 20).
9. Loosely fit the gland plate and collar (13,14) onto the shaft (6).
10. The disc (3) can now be inserted into the body, between the disc end spacers.
11. Insert the shaft (6) complete with the gland assembly attached, through the body and disc, ensuring that all components are correctly aligned.
Note: The use of excessive force may cause
O-ring damage.
12. Tighten all of the insert retaining screws (19, 20).
13. With disc in the closed position, line up the disc pin holes and drive in the disc pins (4) central to the shaft.
14. Ensure that the shaft (6) and disc (3) are free to rotate.
15. Drive disc pin inserts (5) into disc pins onboth sides of the disc. (see disc pinning detail overleaf).
16. Tighten the gland nuts (18) on the gland follower studs (17) until firm.
17. The valve is now ready for installation. Refer to installation and commissioninginstructions.
18. The gland may need to be adjusted on plant start up.
2
3
4
6
18
17
13
14 19
20
15
7
9
16
12
22
23 11 10
1
10 11
23 22
12
www.valves.emerson.com © 2017 Emerson. All rights reserved.
VCIOM-02910-EN 15/09
16
9
8
20
19
(6) Shaft
(5) Disc pin insert
(6) Shaft
(5) Disc pin insert
(4) Disc pin
(3) Disc
(14) Gland collar
(15) Gland packing
(7,8) Insert
(9) Bearing
(16) O-ring
(12) Disc springs
(11) DES loader
(22) O-ring
(23) O-ring
(10) DES ring
KEYSTONE SLURRY CONTROL VALVES
FIGURE 638 SERIES E/SERIES 2
(22) O-ring
(23) O-ring
(10) DES ring
(14) Gland collar
(15) Gland packing
(7,8) Insert
(9) Bearing
(16) O-ring
(12) Disc springs
(11) DES loader
TYPICAL ASSEMBLY - UPPER O-RING DETAIL
(6) Shaft
(5) Disc pin insert
(4) Disc pin (4) Disc pin
(3) Disc (3) Disc
DISC PINNING DETAIL (DN 200)DISC PINNING DETAIL (DN 80 - 150)
(6) Shaft
(5) Disc pin insert
© 2017 Emerson. All rights reserved.
2
Loading...