KERN & Sohn GmbH
Ziegelei 1
D-72336 Balingen
E-Mail: info@kern-sohn.com
Tel: +49-[0]7433- 9933-0
Fax: +49-[0]7433-9933-149
Internet: www.kern-sohn.com
Installation instructions platform
KERN KXPV20
Version 1.0
09/2013
GB
KXP_V20-BA-e-1310
Operating Instruction Platforms
GB
Version 1.0 09/2013
Tabel of contents
1 General ........................................................................................................... 3
2 Safety precautions ......................................................................................... 3
3 Setting up the weighing platform ................................................................. 4
3.1 Selecting the site of installation .............................................................................................. 4
3.2 Package volume ....................................................................................................................... 4
3.3 Protect screw ............................................................................................................................ 4
3.4 Packaging / retur n transport ................................................................................................... 5
3.5 Ambient condi tions .................................................................................................................. 5
3.6 Levelling .................................................................................................................................... 5
3.7 Connecting to the weighing termina l ..................................................................................... 6
4 Operating limits ............................................................................................. 6
5 Cleaning .......................................................................................................... 7
6 Technical data ................................................................................................ 7
6.1 Dimensions in mm .................................................................................................................... 7
6.2 Technical data of the weighing cell ........................................................................................ 8
6.3 Preload, Deadloa d and Overload settings ............................................................................. 9
KXP_V20-BA-e-1310 2
1 General
These installation instructions cover all information required for the installation
and start-up of the following platforms:
KXP 6V20LM
KXP 15V20M / KXP15V20LM
KXP 30V20M / KXP30V20LM
KXP 60V20M / KXP 60V20LM
KXP150V20M / KXP 150V20LM
KXP300V20M
2 Safety precautions
Product safety plays an important role at KERN & Sohn.
Non-observance of the following instructions can lead to damage to the weighing
platform and/or injuries.
Before using the weighing platform read these instructions. Store these instruc-
tions for future use.
Take care when transporting or lifting heavy devices.
Only qualified personnel may install and maintain the weighing platform.
Disconnect the weighing terminal from the power supply before carrying out
cleaning, installation and maintenance.
The weighing platform must have stabilized to room temperature before the sup-
ply voltage is switched on.
Do not use the weighing platform in hazardous environments.
3 KXP_V20-BA-e-1310