E-Mail: info@kern-sohn.com
Internet: www.kern-sohn.com
Installation instructions platform
GB
D-72336 Balingen
Fax: +49-[0]7433-9933-149
KFP_V20-BA-e-1420
GB
Version 2.0 10/2014
Operating Instruction
Tabel of contents
1 Safety precautions ......................................................................................... 3
2 Setting up the weighing platform ................................................................. 4
2.1 Selecting the site of installation .............................................................................................. 4
2.2 Package volume ....................................................................................................................... 4
2.3 Protect screw (Exemplification) .............................................................................................. 5
2.4 Packaging / return transport ................................................................................................... 6
2.5 Ambient conditions .................................................................................................................. 6
2.6 Levelling .................................................................................................................................... 6
2.7 Connecting to the weighing terminal ..................................................................................... 7
3 Operating limits ............................................................................................. 7
4 Cleaning .......................................................................................................... 8
5 Technical data ................................................................................................ 8
5.1 Dimensions in mm .................................................................................................................... 8
5.2 Technical data of the weighing cell ........................................................................................ 8
5.3 Preload, Deadload and Overload settings ............................................................................. 9
2 KFP_V20-BA-e-1420
• These installation instructions cover all information required for the installation
1 General
and start-up of the following platforms:
KERN KFP 6V20M, KFP 6V20LM
KERN KFP 15V20M
KERN KFP 30V20M
KERN KFP 60V20M, KFP 60V20LM
KERN KFP150V20M, KFP 150V20LM
KERN KFP300V20M
2 Safety precautions
Product safety plays an important role at KERN & Sohn.
Non-observance of the following instructions can lead to damage to the weighing
platform and/or injuries.
Before using the weighing platform read these instructions. Store these
nstructtions for future use.
Take care when transporting or lifting heavy devices.
Only qualified personnel may install and maintain the weighing platform.
Disconnect the weighing terminal from the power supply before carrying out
cleaning, installation and maintenance.
The weighing platform must have stabilized to room temperature before the sup-
ply voltage is switched on.
Do not use the weighing platform in hazardous environments.
KFP_V20-BA-e-1420 3