Kane USA WVG2, WPC2, WOT2 User Manual

Quick Start Guide for UEi HUB Tools v2
SETUP:
Download and install the UEi HUB App
Tap the tool box icon on the Ref Side display to connect to WPP1, WPC2 and WOT2 tools. Tap the tool box icon on the Air Side display to connect to WHP1 tools. Tap the tool box icon on the Vac display to connect to WVG2 tools.
Power on the HUB Tools and wait until you see the flashing green LED.
WOT2, WVG2, WPP1 – Press and hold Power button for 1 second.
WHP1 – Press the probe release and extend the sensing probe 90° or 180° until it locks in place.
WPC2 – Open the clamp jaw by placing a cylinder with a diameter larger than 9mm in the jaw.
In the App you will see the tools appear in the “Nearby Tools list”.
If tools are missing tap the refresh icon and the list will refresh.
Touch and Drag a tool from the “Nearby Tool list” to an appropriate assignment slot
(Match the tool icon to the slot you wish to assign it to.”
To see tool values and associated calculated values return to the Display Screen by tapping the back button.
You can swipe between the Vacuum, Refrigerant and Air side displays.
You are now ready to monitor live measurements from your UEi HUB tools.
Loading...
+ 4 hidden pages