JYE Tech DSO 068 Assembly Manual

Iron(20W)
1
Solderwire Multimeter
Screwdriver
AssemblyGuide
Rev.03
2 3
4
Flushcutter
5
Tools
Checkpartvalues&quantitiesagainstpartlist
1
Meterandidentifyresistorvaluesbyohmmeter Understandallpartpolaritiesandorientations
2 3
GetReady
Tweezers
6
Putleadsthroughmountingfrominstallationsideof PCB.EnsuetheyevenlytouchPCB(picturebelow).
1
SolderattheothersideofPCB.Soldershouldfully fillandcoversolderingpads. Avoidbridgeswith neighberingpads.
Cutunusedleads flushwithcutter.
2
3
PartList
A. B. C. D. E. F.
BOBBoardInstallation
AssemblytheMainBoard
LED
Neg.P.S. Conv.
Diode
ElectrolyticCap.
Resistor
Reset
USB-UartConv.
Inductor
USBSocket
Volt.Step-upConv.
Main MCU
Transistor
CeramicCap.
CBBCap
Cap.Trimmer
Crystal
LCD Contrast Adj.
PowerSwitch
External P.S.Conn.
Batt.Charger
BackSide
SlideSwitch
LCDModule
RotaryEncoder
FrontSide
ASSY2
ASSY3
ASSY1
Cutleadsshort underLCD
A.
LayPCBflat.Insertmount­ingstripswithlongerpins intoholes.
Labels
B. C. D.
LCDInstallation
Step1
SolderingSkillsandRequirements
Payspecialattentiontopartpolarityatsoldering.Refertophotostotheright. ForBOBboardsandLCDsolderingrefertophotosatbottomfordetails.
1.
2.
Installpartsbytheorderofpartlist.Startfromthebacksideofmainboard.
3.
Performpower-uptestsassuggestedinthepartlist.
4.
Completethestepsin"GetReady"andunderstandsolderingrequirements.
5.
Important!UnusedleadsunderLCDmustbecutflushtoavoidshorttoLCDmodule!
+
­+
-
+
-
E
B
C
JYE116 JYE117 JYE118 JYE119 JYE120
Diode LED Electrolyticcap. Transistor
Identify Polarity& Orientation
()Pin1indicatedbyarrow
510K5%1/8WΩ,, 200KΩ,,1%1/8W
2MΩ,,1%1/8W
20KΩ,,1%1/8W 300Ω,,1%1/8W 180Ω,,1%1/8W 120,1%,1/8WΩ
3.3KΩ,,1%1/8W 470Ω,,1%1/8W
10K1Ω,,%1/8W
1K5Ω
,,%1/8W
2 2
1
1
1 3
1 2
3 3
5
R1,R27 R3 R2,R4 R5 R6 R7 R8,R12,R21 R10,R22 R11,R31,R33 R9,R20,R30 R24,R25,R26,R28,R29
300pF,ceramicdisk 3pF,ceramicdisk 1pF,ceramicdisk 120pF,ceramicdisk
0.1uF,ceramicdisk
100uF,16V,φ6
X7mm
10uF,16V,4φX5mm
15pF,ceramicdisk
1
12 C9,C10,C11,C12,C14,
C15,C16,C18,C20,C24, C25,C26
2 C2,C23
C1
1 1 3
5
1
2
C17,C27,C28,C29,C30
C19
C21,C22
LED,3mmφ ,red D11
2
D2,D3
USBsocket,BtypeMiNi-
1 J1
2pins,2.54mm 1
J6
100uH,2.5X6mmφ 3 L1,L4,L5
8550,TO-92(E-B-C)
2
Q1,Q2
Tact,6X6X5mm
1 SW12
20MHz,φ2X6mm
1 Y1
0.1uF/100V,CBB
1N4148DO-35
C4 C6 C7,C13,C32
JYE119,UART-USBconv.
JYE118,batterycharger
JYE117,On/Offswitch
JYE116,step-upconvertor JYE120,neg.P.S.convertor
BOB1
()
optional
BOB2
()
optional
BOB3optional
()
BOB4 BOB5
DC005,2.1
φ mmcore J21
1
1
1
1 1
Type/Spec
QtySeq.
DIP2.54mm5X2,,
SIP,2mm,20X1 SIP,2mm,2X1
2
1 2
J4,J5Donotinstall
()
LCD
128X64graphic,12864-16 1
LCD1
SlideswitchSS-23D06 RotaryEnc.,EC11,10mm
3
1
SW1,SW2,SW3
SW4
PCB#:109-06800-00H 1
Catagory
Top(1),bottom(1),stand(1) switchcaps(3),dialcap(1)
1set
7-keysiliconebuttonpad
2-coreheader/wire,10cm
2.3*8mm,selftapping
BNCBNC-KY
1 2 1 4
2
5 6
4
7 9
8 10
11 12 13 14 15
16
3
28
26
22
23 24
25
33
32
27 29
17
20
30
18
31
21
19
34
39
38
37
35 36
45
42 43 44
40
41
46 47
1
BOBsandJumpers
()
BOB4
()
BOB3
()
BOB2
()
BOB1
()
BOB5
Battery Conn.
Extention Ports
Buzzer
A/DConverter
KeepJP1openifBOB2 isinstalled.Otherwise closeit.
TIP: Resistorvaluesareeasilymis-read. Metercheckingisstronglysuggested.
BOBBoardsOrientation
48
1
Shieldingwire,8cm
5V,passive,9X5.5mmφ 1 BP1
49
Note:PleaseinstallbytheordergiveninthePartListbelow.
TIP: C3andR32 arenotrequired.
TIP: DonotinstallJ4ifbatteryistobemountedonbackcover.Insert thepinsintoprogrammerheadertoperformU4andU5programming.
KeepJP2openifBOB3 isinstalled.Otherwise closeit.
Identifytheholeswithlabels onLCD.Theyshouldgo withthelongstrip.
PutLCDontostripsasshown. Solderpinsatcornersfirst.Do therestafterflatnessensured.
TurnLCDandmainboardover. Completesolderingfollowing sameproceduresasinC.
Usethesmallacrylic toolprovided.
Applysoldertoone pin.
Applysoldertothe correspondingpinon mainPCB.
PutBOBtoplace andalignpads.
MaintainBOBupright andfixitbymelting thesolder.
Finishtherestpins.
Designator/Location MainPCB Resistor
Diode Inductor Crystal Connector Switch Capacitor
Buzzer Diode
Transistor
Connector
Electro. Capacitor
Connector BOB Board
Performpower-uptest1asdescribedonthereversepage.
Switch
Switch
Pin Strip
Pinstrip Enclosure
Switch
Wire
Wire
Connector
Screw
- www.jyetech.com -
JYETechLtd.
Moreatthereversepage
1
10M,5Ω
%,1/8W R40
50
Continuefollowingassemblyafterthetest.
Keypad MCU
Test Signal Output
Pin1(squarepad)indicated byarrow
1
Shortwithsolder JP9
Jumper
Performpower-up test2asdescribedon thereversepageafter allcomponentshave beeninstalledon board.
()
PCBVersion:H
Doublechecktoensurenomissedorcoldsolderorshorts
CloseJP2forthetimebeing(evenBOB3isinstalled) KeepJP3JP4open
CloseJP1ifnoBOB2
KeepJP1open MakesureBOB2in
Powerup.Checkvoltage at+5Vtestpoint.Isit+5V?
Poweroff.CloseJP4
Powerupandcheck+5V again.Isitstill+5V?
LCDbacklighton
Adjustcontrast.Canyou seedisplay?
Pressbuttons.Doyousee reactiononscreen?
Setcursortotimebase.Turn [ADJ]dial.Doyousee timebasechange?
Powering-upTest1
Yes
No
USBpowered Batterypowered
MakesureBOB4andBOB5havebeeninstalled
Follow"NoPower" flowcharttocheck
Checkforsolderingmistakes. Wrongpolarity,shorts,etc.
Follow"LCDDark" flowcharttocheck
CheckU5andsoldering ofbuttonrelatedpins
Follow"Nodisplay" flowcharttocheck
CheckU5andsoldering ofrotaryencoderpins
V4
V1
V2
V3
AV-
AV+
V-
+5V
VT
VB
SYSCLK
VA
Contrast Adj.
JP4
JP3
JP1 JP2
JP6
USB Connector
(About+5V)
SignalInput
Referencepointfor voltagemeasurement
*
Allvoltagesaremeasuredwithvoltmeter's(-)poleatreferencepoint(indicated inphotobelow)and(+)poleatpointsofmeasurement.
1.
2.
*
Notes:
VBUS
V+
(Volt.range:2-5V)
Battery Connector
VS+
WithoutBOB3VS+=V+(duetoJP2closed)
WithBOB3VS+dependsonstateofBOB3(OnorOff)
LCDpin18
IsV-normal(-5V)?
CheckBOB5andC27
CheckL1,C28,C11,andC12
CheckL5,C16,andC17
SetSW1,SW2,SW3toGND, 10mV,andX1respectively
IsVAnormal(+5V)?
CheckL4,C29,C9,andC10
IsV2measured0V CheckSW1,SW2,andR1
IsV3measured0V
U1mayhavebeendamaged
isV4measured~1.6V
CheckSW3,R9,R10,R11
AdjustVPOS.Canyousee tracedisplayed?
Follow"NoTrace" flowcharttocheck
2
1
InstallBatter& Enclosure
USBpowered Batterypowered
Batteryvoltageok?IsVBUSmeasuredok?
IsV+measuredok?IsV+measuredok
IsVS+measuredok?
Is+5Vmeasuredok?
BOB3installed?
Powergood
CheckBOB3
CheckJP2
Checkbatt.
CheckBOB2
CheckUSB
CheckD4
CheckBOB4
IsvoltageatLCD pin195V?
Checkrelated connections
ShortCandEofQ2. DoesLCDlightup?
CheckQ2,R30and connectionwithU5
PossibleLCD issue
PressSW12.DoesLEDblinkasitshouldbe?
U4andLCDconnectiongood?
LCDdefective
Fixbadconnections
CheckY1,C21,C22
Re-programU4
VoltatU4pin20toolow?
IscontrastchangeablebyPOT1? VEE.atLCDpin18negative?
CheckPOT1andrelatedCheckallconnectionsbetween
U4andLCDforopensorshorts.
VTandVBnormal? U3damaged
ConnectionbetweenU4 pin17andU3pin12good?
U3hasbadsoldering orhasbeendamaged
Checkout thecause
Ensureallanalogvoltages arenormal(seephoto)
PowerUpTests
Troubleshooting
A. B. C. D.
E. F. G. H.
PressSW12.DoyouseeLED blinkonce(ifbootloader installed)andthentwice?
CheckY1C21C22、、
LEDreversed? U4pin20voltagelow?
Continuetoinstall partsonthefront
PoweredbyUSB:V+VBUS-0.7V
PoweredbyBatt.:V+VBAT
()+5V
()-5V
()+5V
()-5V
()0V
*
()0V
*
()~1.6V
()0.6V
()2.6V
*
()0V
()+5V
()About-5V
(Batteryvoltage)
VBAT
()2.5V
V5
()~1.6V
www.jyetech.com/forum
JP5
AdjustCompensation Capacitors
Compensationcapacitorscanbe adjustedusingthebuilt-insignal generator.Followstepsbelow:
C5
C8
Temporarilyconnecttestsignaloutputto scopeinputwithapieceofwire
Notenough
检查
Good
检查
Toomuch
检查
1.
Connecttestsignaloutputtoscopeinput (seephotobelow)andsetSW1toDC.
2.
Powerup.Settestsignalto10KHzand 5V.Setscopetimebaseto20us.
SetSW&SW3to1V&X2respectively. Adjusttriggerleveltomakedisplay stableifnecessary.ChangeC8toobtain waveformasthemiddleofphotosleft.
3.
Keepsignalfrequenceunchangedand setamplitudeto1V.SetSW2&SW3to
0.1VandX5respectively.Makedisplay stable.ChangeC5toobtainwaveform asthemiddleofphotosleft.
4.
5.
Removeconnectionbetweentestsignal outputandscopeinput.Adjustmentis done.
JP7 JP8
- www.jyetech.com -
Thisisby-passofchargerBOB2.Ifbattery
isnotused(i.e.noBOB2)keepJP1closed.
Thisisby-passofswitchBOB3.IfBOB3 isnotusedJP2shouldbeclosed.Inordertofocus onthemaincircuitJP2canbetemporarilyclosed atpower-uptestevenBOB3isinstalled.Keepit openafterthetest.
JP2
Thisisby-passofstep-upconverterBOB4.
UsuallyJP3shouldbekeptopen.
JP3
Thisistheconnectingpointofpowersupply totherestcircuits.ForsafetyJP4shouldonlybe closedafterpowersupplyistestedgood.
JP4
Step2 Step3
Step4
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
IsAV-normal(-5V)?
IsAV+normal(+5V)?
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No No
No
NoPower
LCDDark
NoDisplay
NoTrace
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
NoNo
No
No
No
Yes
Yes
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Voltageswith""aremeasuredwhenSW1(couple)isplacedatGNDposition.
MajorJumpersExplained
JP1
InstallBNCconnectors andplacesiliconepad.
Capslideswitches.Insert boardtoconnectorholes.
Holdboardtighttowards USBendandpushin.
ConnectinputsignalBNC tomainboardasshown.
Connecttestsignalwith shieldingwireprovided
Tighttwoscrewsandattach batt.tocenterofbackcover
Putonbackcover.Tight thetwoscrewsasshown.
Putdialcaponandyou aredone.
TechSupport:
JYETechLtd.
JP9
Central conductor
Outter conductor
Tight Screw
Tight Screw
Scopeinput
Test signal output
Powering-upTest2
Done
Note: JP9mustbeclosed
beforepower-uptest2
TIP: CloseJP7toenable
buzzer.ItbeepsasLEDblinks
Note: KeepJP2open
afterthepower-uptests
QuickWaveformDiaplayTest
Touchprobetipwithafingerto showintroducedmainlinesignal
Thisjumpershouldalwaysbeclosed.JP9
PowerSupplyOptions
Source BOB2 JP1 Remarks
USB
Yes Open No Close
Int.Batt. Yes
Open
Ext.Batt.
(J2)
Yes Open
CloseJP5
Ext.5V
(J2)
Yes Open No Close
InstallD5(D5 isnotprovided)
Note: Donotsimultaneouslyconnect
externalandinternalbatteries.
Loading...