40200
Controls Pump with o-ring adapter
Accurately Check controls to 300 PSI of pressure or 25 inches of vacuum
OPERATING INSTRUCTIONS
1. Connect manifold center port charging line to pressure or vacuum
port on controls pump depending on type of control you are testing.
2. Connect o-ring end of nger-tight adapter to control capillary’s 1/4”
are nut.
3. Connect high or low side chaging line (depending on control
pressure range) to the plain end of capillary adapter.
4. Open manifold valve on the side you are using and close the other
side. Move controls pump handle up and down developing desired
pressure to test and set control. The other manifold valve may be used to
bleed o pressure and repeat testing.
Testing Vacuum
REPLACEMENT PARTS
40201 Adapter with o-ring
40202 Adapter o-ring
40203 Vacuum access with valve core
40204 Piston o-ring
40205 35 PSI valve core (pressure)
40206 3 PSI Valve core (vacuum)
40207 Pressure access with valve core
Testing Pressure
Form 40200-300
JB Industries AURORA, IL 60507 USA
6
84520 40200
3