Johnson Controls York YDEC028, York YDEC036, York YDEC045, York YDEC056, York YDEC071 Installation Manual

Page 1
VRF Air-Conditioner
Installation Manual
FORM NO.:YDEC IOM-EN(1212)
Page 2
Model YDEC028 YDEC036 YDEC045 YDEC056 YDEC071 Cooling Capacity kW 2.8 3.6 4.5 5.6 7.1 Heating Capacity kW 3.2 4.0 5.0 6.3 8.0 Power supply - 220V 50Hz Rated Power W 110 110 130 130 180 Rated Current A 0.55 0.55 0.65 0.65 0.83 Air Flow Rate m3/h 600 600 950 950 1250 External Static Pressure Pa 0 Dimension HxWxD mm 680x1245x240 680x1245x240 680x1245x240 680x1245x240 680x1245x240 Connecting Pipes Liquid/Gas (φ)mm 6.35/9.52 6.35/12.7 6.35/12.7 6.35/12.7 9.52/15.88
Drainage Pipe (φ)mm
Model YDEC080 YDEC090 YDEC112 YDEC140 YDEC160 Cooling Capacity kW 8.0 9.0 11.2 14.0 16.0 Heating Capacity kW 9.0 10.0 12.5 16.0 18.0 Power supply - 220V 50Hz Rated Power W 210 210 210 250 250 Rated Current A 0.97 0.97 0.97 1.20 1.20 Air Flow Rate m3/h 1550 1550 1550 1950 1950 External Static Pressure Pa 0 Dimension HxWxD mm 680x1245x240 680x1245x240 680x1670x240 680x1670x240 680x1670x240 Connecting Pipes Liquid/Gas (φ)mm 9.52/15.88 9.52/15.88 9.52/15.88 9.52/15.88 9.52/15.88
Drainage Pipe (φ)mm
16(O.D.)
16(O.D.)
Page 3
Contents
1. SAFETY CAUTIONS ....................................................................................................................... 1
2. BEFORE INSTALLATION ................................................................................................................ 1
3. SELECTION OF INSTALLATION POSITION ...................................................................................... 2
4. INSTALLATION OF INDOOR UNIT .................................................................................................. 2
5. INSTALLATION OF REFRIGERANT PIPING ...................................................................................... 4
6. INSTALLATION OF DRAINAGE PIPING ........................................................................................... 5
7. ELECTRIC CONNECTION ............................................................................................................... 6
Page 4
1. Safety Cautions
Please carefully read this "Safety Cautions" before installing air conditioner so as to ensure correct installation. The following cautions are divided into two categories, related to safety and of great importance, please carefully read.
Warning…Inattention will lead to death or
serious injury.
Caution…Inattention will lead to injury or machine damage, and may also cause serious injury according to different conditions.
Warning
Installation operation must be conducted by
professional personnel. Do not conduct without approval.
Please install the air conditioner in a solid place
sufficient to bear the weight. Instable base may lead to air conditioner falling and cause damage.
Please use separate circuit for power supply. The
operation of all the electric parts must be in accordance with the local laws and specifications as well as this instruction.
The operation shall be conducted by the
electrician with professional qualification. Insufficient capacity or improper electric operation may cause electric shock or fire hazard.
Use the specification designated wires; all the
wires shall be connected well to make connecting terminal and wire free from external force drawing. Poor connection and improper installation may cause fire hazard.
Straighten out and lay flat when connecting power
line, remote controller and wire controller line so as to make electric parts and wire slot box cover fastened down.
If any refrigerant gas leakage in installation,
immediately open door and window for ventilation. The refrigerant gas will generate toxic gas when meeting combustion sources such as air heater, furnace and stove.
Please power off first before touching electronic
parts.
Do not touch the switch with wet hand.
Touching switch with wet hand may cause electric shock.
Air conditioner must be earthed.
Earthing wire shall not be connected to gas pipe, tap water pipe, lightening rod and telephone line. Poor earthing may lead to electric shock accident.
Leakage earthing leakage breaker must be
installed. If leakage earthing breaker is not installed, there will be electric shock hazard or fire hazard.
Please arrange drainage piping according to this
instruction to guarantee smooth drainage, and insulate the piping in case of condensed water accumulation. Improper piping may lead to water leakage and soak household items.
Air conditioner, power line and connecting line
shall be far away from more than 1m at least from such electrical equipment as television set and radio to prevent from interference of electromagnetic wave and noise.
In the room equipped with fluorescent lamp
(inverter or quick start type), the signal transmission distance of the remote controller may not reach the preset value. The indoor machine shall be away from fluorescent lamp as far as possible.
Installation should not be conducted in the
following places:
(a) Place where mineral oil smoke or mist or steam
is diffused, for example, kitchen.
Plastic parts may be deteriorated and damaged.
(b) Place where there is corrosive gas such as sulfur
dioxide. Copper pipe or welding part may be corroded to cause refrigerant leakage.
(c) Place which is close to the machine generating
electromagnetic wave. Electromagnetic wave may influence the control system to make the air conditioner incapable of normally operating.
(d) Place where there is combustible gas leakage,
carbon fiber or combustible dust floating, or
volatile combustible placing such as gasoline or
diluent. The use of air conditioner in such places may cause fire hazard.
Please do not touch the fin of the heat exchanger.
Improper touch may cause machine damage and personal injury.
Please pay special attention to product handling.
Do not handle by lifting PP strap in case of PP strap rupture to damage unit and harm person.
2. Before Installation
Air conditioner shall not be unsealed before
moved to the installation site. If it is necessary to unseal, measures shall be taken after unsealing to avoid damaging or scratching air conditioner.
When moving the air conditioner during or after
unsealing, do not apply force to refrigerant piping, drainage pipe or other plastic parts in order to avoid damaging air conditioner.
Before air conditioner installation, please confirm
whether the refrigerant used for the unit is R22 or
1
Page 5
Hanging bolt
Ceiling
R410a and whether it is consistent with that of outdoor unit.
For the installation of outdoor unit, please refer to
the installation and operation instructions attached for outdoor unit.
3. Selection of Installation Position
Installation position conditions:
Ceiling strength shall be sufficient to bear the
weight of indoor unit; if not, reinforce first.
Guarantee good ventilation and make gas flow
free from obstructions shielding.
Condensed water is capable of being discharged
smoothly.
There is no combustible gas leakage hazard. Ensure adequate installation space. Piping length of indoor unit and outdoor unit is
within an allowable range.
indoor unit downside; for holing with diamond, plastic cloth shall be sticked to wall or other method may be adopted to prevent water flow to wall; for holing with electric hammer, dust prevention measures shall be taken.
4.2 Install the unit
Install Φ10 hoisting bolts (4). After the unit hoisting, conduct piping and wiring
work in ceiling, and determine the outlet direction of piping after installation site selection. Especially on the occasion with existing ceiling, please pull refrigerant piping, drainage pipe, indoor and outdoor connecting line and remote controller line to a connection position before hanging machine.
Installation method for hoisting bolt.
Match with the existing structure and arrange thread pitch according to the following shown machine dimension. Wooden occasion: arrange hoisting bolt by mounting square bar on beam
4. Installation of Indoor Unit
4.1 Open wall hole
Select installation position and determine pipe
passing direction and pipe outlet position.
Select drill bit according to machine model and
use electric hammer or diamond to open wall hole.
Wall hole size in general: recommended wall hole
diameter Φ90mm for below 056 type and Φ150mm for above 071 type.
Keep clear of the walls with wire or foreign
matters inside and outside and the superhard walls as much as possible in holing; the hole inside shall be 0.5cm~1cm higher than outside considering drainage; wall hole passing through outlet pipe of indoor unit side shall be slightly lower than the
Beam
Hoisting bolt
Steel frame occasion: arrange and directly use supporting angle steel
Hanging bolt
Supporting angle steel
Existing concrete blank occasion:
Newly prepared concrete blank occasion:
2
Page 6
ing and embedding
Nut
Gasket
(Blade shape Insertion)
(Slide insertion)
(Pipe hang screw bolt)
Embedding screw bolt
Seat installation method.
Please use embedded bolt, expansion bolt, etc.; the bolt material shall be high-quality carbon steel (subjected to surface copper plating or other rust-proof treatment) or stainless steel.
Wedge bolt
Wall
4.3 Install indoor unit
Use pulley, etc. to hoist indoor unit to hoisting
bolt; use gradienter, etc. to install indoor unit horizontally; otherwise, it may cause water leakage.
Hoisting bolt
Hoisting parts
Side plate
Connector at gas side of cooling medium piping
Connector at liquid side of cooling medium piping
Drainage outlet
For embedded type installation, the procedure is
similar to hoisting mode, but hole must be opened
Hoisting support
Hoisting bolt
on the ceiling before installation, with the specification as follows: 1170×610 for 028-112 type and 1600×610 for 140-160 type; take down the right and left cover plates of indoor unit and then embed one half of main body into the ceiling, and only expose rear cover plate and head cover.
Hoisting support
For seat installation, use gradienter to install
3
Page 7
Torque spanner
Horn mouth nut
indoor unit horizontally and maintain the main body vertical to the floor. Dismantle pump, small defrosting tray and water level switch before installation, strip off the insulated shield of water level switch connecting line and then screw together to make short circuit, directly connect drainage pipe in accessories to the main defrosting tray outlet (select left or right water outlet of defrosting tray according to actual installation condition).
Dismantle pump assembly
Connect defrosting tray with drainage pipe
prevent dust, moisture or other foreign matter entering into pipe.
Except designated refrigerant, anything, for
example, air, shall not mix into refrigerating circuit.
Before welding refrigerant piping, please conduct
nitrogen replacement or fill nitrogen into piping in welding, and finally connect with indoor unit by horn mouth.
Caution
When filling nitrogen into piping in welding,
guarantee to control the pressure with reducing valve as 0.02MPa (0.2kgf/cm2) (like the feel of breeze blowing cheek).
Do not use welding flux when welding refrigerant
piping connector. Please use copper base brazing filler metal without welding flux. The use of welding flux containing chlorine or fluorine may corrode the purity of piping or refrigerating system.
Hook
Bolt
Gasket
Model A B C D E F G H
YDEC028-112 1245 680 150 760 450 1119 200 240
YDEC140-160 1670 680 150 1070 450 1542 200 240
5. Installation of Refrigerant Piping
The piping at gas side and liquid side of
refrigerant shall be subjected to thermal insulation, if not, the piping surface will have dew.
Please use thermal insulation material which is
capable of withstanding above 120 high temperature. Please strengthen thermal insulation for refrigerant piping according to the installation environment, otherwise, the surface of the thermal insulation material may dew and frost.
Caution
Please comply with the following items:
Coat fatty oil or ether oil at horn mouth (inside
and outside) when connecting horn mouth nut.
Only use the horn mouth nut attached by the unit.
Other horn mouth nut may lead to refrigerant leakage.
Please clamp flat or seal the pipe end in order to
5.1 Piping connection
When connecting and dismantling piping to/from
air conditioner, simultaneously use an ordinary spanner and a torque spanner.
Piping connector
For relevant tightening torque, please refer to the
following table.
Pipe diameter
6.35(1/4") 14.2~17.2
9.53(3/8") 32.7~39.9
12.7(1/2") 49.5~60.3
15.88(5/8") 61.8~75.4
Tightening torque
If it is necessary to install unit without torque
spanner, comply with the following method: When using spanner to tighten the horn mouth nut, the tightening torque on some point may suddenly increase. Further tighten the horn mouth nut from this position to the angle shown in the following table.
Pipe diameter
6.35(1/4") 60°~90° ~150mm
9.53(3/8") 60°~90° ~200mm
12.7(1/2") 45°~75° ~250mm
15.88(5/8") 45°~75° ~300mm
Angle
tightened
further
(N.m)
Length of
recommended
tool arm
4
Page 8
∆−=
Incline downward
Caution
Excessive tightening may damage horn mouth and
lead to refrigerant leakage.
5.2 Air tightness leakage detection
Conduct air tightness leakage detection
confirmation at the end of piping work.
Leakage detection method: (a) Fill dry compressed nitrogen into indoor unit and
piping system, and slowly boost the pressure to
4.3MPa;
(b) After maintaining pressure for 10min, coat soapy
water or other foaming agent at the connection position such as weld and thread joint, and observe whether there is leakage;
(c) If any leakage, tighten or repair weld leaking
position after pressure relief.
(d) Fill into dry compressed nitrogen again and
slowly boost the pressure to 4.3MPa;
(e) Start to record the reading of pressure gauge after
maintaining pressure for 6h, and then record the reading of pressure gauge again after 24h;
(f) If no pressure drop, then the air tightness is
qualified. If any pressure drop, find out the leakage point and repair, and then repeat the above d and e procedures until qualified.
Caution
Pressure reading is related to temperature
variation, so the temperature variation factor shall be considered when judging whether there is pressure drop. The relation of pressure correction value and temperature variation is:
+
273
t
2
= 1
PP
1
+
273
t
1
2correction
P--Pressure correction value (bar)
P
---Corrected pressure value (bar)
correction
P1---The first pressure reading (bar) P2---The second pressure reading (bar) t1---Temperature at the first pressure reading ( ) t2---Temperature at the second pressure reading ( )
In air tightness test, do not connect indoor unit
and outdoor unit, otherwise, nitrogen may leak to outdoor unit.
 
 
PPP
5.3 Thermal insulation
If no leakage after inspection, respectively wrap
liquid pipe, gas pipe and each connecting position with thick-enough heat-resistant polyethylene, and conduct good thermal insulation.
Field piping must be connected to the piping
connecting part all the time. If poor thermal insulation for piping, there will be dew outside and scald if any touch.
6. Installation of Drainage Piping
6.1 Drainage piping installation
In delivery, the drainage outlet is PVC pipe; in
connecting water pipe, please use auxiliary sealing material and sleeve.
Conduct thermal insulation for drainage pipe of
indoor unit, otherwise, condensation may be caused. The connecting part of indoor unit must also be subjected to thermal insulation treatment.
Before installation, please confirm whether the
connection condition of pump defrosting tray and the surface thermal insulation are intact.
For drainage pipe connection, use hard PVC
binding agent and confirm there is no leakage.
Thermal insulation material
above 1/100
The junction of drainage pipe and drainage outlet
of indoor unit must be free from bearing any force, including water pipe gravity.
The downward inclination of drainage pipe shall
be above (1/100) and the middle shall be free from bending.
The transverse pull-out of drainage pipe shall be
within 20m. If the drainage pipe is longer, please arrange a support to prevent bending.
Drainage system joints must be sealed against
water leakage.
The height from drainage pipe end to ground or
drainage channel bottom shall be larger than 50mm, and the drainage pipe end shall not be put into water. When directly discharging condensed water into foul ditch, bend drainage pipe upward to a U-shaped water seal in order to avoid odor entering into room through drainage pipe.
For concentrated construction of drainage pipe of
multiple indoor units during suspended ceiling installation (with pump), arrange U-shaped bend at the branch water pipe connecting each indoor unit to prevent water return from main drainage pipe.
For seat installation, dismantle pump assembly,
and directly connect the drainage pipe of accessories to drainage outlet of defrosting tray.
5
Page 9
Incline downward
Inject water into air
Arrange drainage
pipe to U shape
Wrap drainage pipe and its
tion with
insulating pipe against
condensation
I
ndoor unit
Outdoor
Bending
S-shaped
against return
connection posi
Concentrated construction of drainage pipe of
multiple indoor units in seat installation (pump must be dismantled) shall be in accordance with the following figure.
About 10cm as much as possible
above 1/100
6.2 Drainage test
Guarantee smooth drainage pipe connection and
check whether each joint is sealed.
Confirm by injecting water into air outlet. Inject
water into air outlet with jar or hose; pay attention to slowly injecting until the drainage nozzle of water pond has water flow.
At the end of preparation work, power on terminal
board and immediately start discharge pump in refrigerating mode.
Check the drainage condition of discharge pump
after operating for a few minutes.
In seat installation, the method of drainage test is
to directly inject water slowly from air outlet until the water outlet of drainage pipe end has water discharge and observe whether the middle has seepage along the pipeline.
Drainage pipe
outlet
7. Electric Connection
7.1 General
Power off before implementing any electric
operation.
All the purchased parts and materials as well as
electric operation must comply with the local laws and regulations.
All the connection operation must be implemented
by professional electrician.
Line breaker or leakage breaker must be arranged
at power supply.
Earthing resistance must below 4Ω. Air conditioner must be earthed reliably. Earthing
wire shall not be connected to gas pipe, tap water pipe, lightening rod or telephone line.
Do not power on before the end of all the electric
operation.
The terminal of the same power supply shall not
be connected with two wires with different diameters.
Please use the power line with specified
specification, firmly connect and ensure terminal free from external force drawing.
Terminal screw should not be too tight or too
loose. Too tight will damage the terminal and too loose may lead to poor contact and cause excess heating to trigger hazard.
7.2 Unit power distribution
Please refer to the following figure for power
distribution of indoor unit and outdoor unit.
unit
A set of independent cooling medium system shall
use an independent switch control; multiple systems shall not use a switch control and partial indoor unit in a system and indoor unit of other system shall also not share a switch control.
6
Page 10
7.3 Connection of indoor unit power line
The power supply connection for indoor unit is detailed in electric schematic diagram on electric control box.
Wiring specification is RVV2X2.5+1.5.
7.4 Type setting
Type setting is detailed in the electric schematic diagram on the electric control box.
7.5 Communication wire connection
Outdoor unit
Note: Inlet and outlet lines (TB2 inlet and TB3 outlet) of indoor unit shall not be reversed,
the unit can't be started.
Recommended model of communication wire is RVSP2X 0.75.
"TB2 inlet" connects the communication wire from outdoor unit communication terminals (A and B) or from the
former indoor unit (TB3).
Communication wire of "TB3 outlet" connects to the communication port of the next indoor unit (TB2 inlet).
Inlet and outlet lines (TB2 inlet and TB3 outlet) of indoor unit shall not be reversed, otherwise, there will be fault
and the unit can't be started.
Connect according to the diagram, do not allow A and B polarity connection error, otherwise, communication
failure or controller damage may be caused.
In order to avoid signal interference, the communication wire must use shielding wire, and the shielding layer
shall be earthed.
The communication wire exceeding the specific length may cause air conditioner out of service due to
communication problem: communication wire length ≤500m and total length ≤1000m.
otherwise
, there will be fault and
7.6 Install the controller
Install the wire controller on the pre-reserved site on the wall. Carcassing for communication wiring should be ready before installation the controller. The recommended
7
Page 11
communication line is RVSP2×0.75. Be sure to pull the wires through the PVC conduit. Note: the communication wire and PVC conduit are the field supplied parts.
VRF Air-Conditioner IOM
7.7 Connect the wire controller and indoor unit
Group control can be realized through the wire controller. One wire controller can connect to max 4 indoor
units.
The indoor units in one group should be connected in one and same power supply to guarantee normal
initialization of wire controller when power on.
Connection sketch of indoor unit and wire controller:
(a) When one wire controller connecting only one indoor unit: (refer to Fig. 13) (b) When one wire controller connecting multi indoor units: (refer to Fig. 14)
Fig. 13
One wire controller connects to one indoor unit
Fig. 14
One wire controller connects to multi indoor units
8
Page 12
YDEC IOM
YDEC IOM (0812)
-EN(1212)
NONE
9
Loading...