Johnson Controls UPSPNL550-0 Installation Instructions Manual

24-11092-00007, Rev. A
24- 11092- 00007, Rev. A
(barcode for factory use only)
UPSPNL550-0 Panel
Part No. 24-11092-0000 7, Rev. A
Installation Instructions

Applications

The UPSPNL550-0 provides tempora ry ba ck up pow er to com p ut er s, ne two rk i ng dev ice s, an d ot he r de vic es of similar load demand where power interruptions cause outages. The UPS supplies power long enough for equipment to safely and correctly shut down. Follow all power ratings and load requirement limitations for best results. Test units periodically for performance compliance because performance degrades with time and the number of charge and discharge cycles.

United States

This equipment has been tested and found to comply with th e limits for a Class B digital device, p ursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection a gainst harmful inter ference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmfu l interference to r adio communications. However, there is no guarantee that interference will not occur in a particular insta llation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
Issued June 2018
Reorient or relocate the receiving antenna .
Increase the separation between the equipment and receiver.
Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
Consult the dealer or an experienced radio/TV technician for help.

Canada

This Class (B) digital apparatus meets all the requirements of the Canadian Interference-Causing Equipment Regulations.
Cet appareil numérique de la Classe (B) respecte toutes les exigences du Règlement sur le matériel brouilleur du Canada.

Installation and Operation

For details on installation and operation of the CyberPower UPS, refer to the CyberPower User’s Manual on the inside of the panel door.

Special Tools Needed

Use standard panel mounting tools.
UPSPNL550-0 Panel Installation Instructions
1

Mounting

Location Considerations

Avoid areas subject to excessive vibrations and the effects of radi an t he at .
Ensure that enclosure vents are not blocked or installed in a manner that hinders air flow.
Mount the panel as close as possible to protected equipment. Mount to a suitable solid surface to minimize vibration and use the designated mount i ng holes on the back plane of the enclosure.

Wiring

Risk of Electric Shock.
UPS equipment outputs remain live when the main disconnect to the panel is in the Off position or when the panel is without power. Contact with the UPS equipment outputs can cause electric shock and may result in serious personal injury or death. To avoid injury, use the appropriate personal protective equipment.
Risque de décharge électrique.
Les sorties des blocs d ’alimentation sans coupure (ASSC) restent alimentées lorsque l’interrupteur principale est en position Arrêt ou lorsque le panneau est sans alimentation électriqu e. Tout contact avec les sorties des blocs d ’alimentation sans coupure (ASSC) est susceptible de provoquer un choc électrique et d'entraîner des blessures graves, voire mortelles. Pour éviter tout risqu e de blessure, portez l’équipement de protection individuelle approprié.
Use the appropriate personal protective equipment, such as gl oves and protective goggl es. For electr ical operation purposes, use the appropriate electrical protection equipment and tools.
Risk of Property Damage.
Do not apply power to the system before checking all wiring connections. Short circuited or improperly conn ected wires may result in permanent damage to the equipment.
Risque de dégâts matériels.
Ne pas mettre le système sous tension avant d'avoir vérifié tous les raccords de câblage. Des fils formant un court-circuit ou connectés de façon incorrecte risquent d'endommager irrémédiablement l'équipement.
UPSPNL550-0 Panel Installation Instructions
2
Risk of Property Damage.
Do not run low-voltage cable in the same conduit or wiring troughs with high-voltage wires. Running low- and high-voltage wires in the same conduit or wiring troughs may damage the equipment or cause system malfunction.
Risque de dégâts matériels.
Ne pas faire courir un câble basse tension dans les mêmes gaines o u goulottes électr iques que d es câbles hau te tension. L'installation de fils basse tension et haute tension dans les mêmes gaines ou goulottes électriques risque d'endommager l'équipement ou de provoquer des dysfonctionnements du système.

General Precautions

UPS equipment may continue to supply power at 120 V when power mains are switched off. Only trained personnel can service this equipment. To reduce the risk of property damage, serious injury, or death, read these instructions thoroughly and follow all warnings, cautions, notices, and important messages that are included in all documents that accompany this product.
Johnson Controls shall not assume any liability for injuries or damage caused by not following the steps outlined or described in these instructions. Unauthorized modifications to Johnson Controls products are prohibited for the following reasons:
They may create hazards that could result in death, serious injury, or equipment da mage.
They void product warranties.
They may invalidate product regulatory certifications.
They may violate OSHA standards.
IMPORTANT: Only qualified personnel should install or service Johnson Controls products. These instru ctions are a guide for such personnel. Carefully follow all instructions in this document and all instructions for the CyberPower UPS.
For power supply requirements, see Technical Specifications
.

Wiring the UPS

To wire the UPS, complete the following steps:
1. Provide a supply voltage to the UPS unit from a qualified source and ensure that the breaker supplying power is in the off position. Refer to the wire diagram located on the inside of the panel cover.
Note: Ensure that the UPS power cord is plugged into the outlet inside the enclosure. One of the outlets is a spare. Ensure that the breaker switch inside the panel is in the off position.
2. Wire the supply line voltage to the breaker (hot) and to the terminal block TB-1 (ground and neutral).
3. Wire the field load to TB-2 (hot, neutral, ground) as indicated on the terminal block.
Note: Ensure that the TB-2 wire plug is installed to the surge/battery side outlet of the UPS.
4. While wearing the proper protective apparel, switch the supply breaker to the on position.
5. Switch the breaker switch inside the panel to the on positio n.
6. Press the power button on the UPS for approximately two seconds and release it after a short beep. A green light signifies that power is on.
UPSPNL550-0 Panel Installation Instructions
3
7. Place the cover on the enclosure. The unit is ready for charging and is able to function as designed after the proper amount of charging time.
IMPORTANT: See the enclosed CyberPower User’s Manual for the proper charging time, discharge time, load
characteristics, and all other relevant information for the UPS.

Piping

When installing, follow the standard electrical practices per local codes. Make the necessary enclosure conduit connections using standard tools. You may need to make the conduit entry hole for the field. Do not interfere with the vents on the side of the unit when making an opening. Ensure that no loose metal filings rest on the internal components in the enclosure. Remove any containments and clean the inside of the enclosure as needed.

Setup and Adjustments

To set up the panel and UPS, follow the CyberPower User’s Manual, which is included with the enclosure.

Operation

To operate the panel and UPS, follow the CyberPower User’s Manual, which is included with the enclosure.

Repair Information

If the UPSPNL550-0 fails to operate within its specifications, replace the defective component. For a replacement, contact the nearest Johnson Controls® representative.

Replacing the UPS

To replace the CyberPower UPS, complete the following steps while wearing the appropriate personal protective equipment:
1. Place the main breaker that is supplying power to the pane l in the Off position.
2. Remove the panel cover.
3. Place the breaker inside the panel in the Off position.
4. Turn off the CyberPower UPS by pressing its power button for approximately two seconds. Release it after you hear two short beeps.
5. Unplug the CyberPower UPS from the AC power outlet inside the panel.
Note: Make a note of the electrical connections.
6. Remove the existing CyberPower UPS unit.
7. Place the new UPS in the panel and install the necessary electrical connections.
8. While wearing the appropriate personal protective equipment, switch the main supply breaker to the On position.
9. Turn on the breaker tha t is inside the panel.
10. Press the power button on the CyberPower UPS for ap proximately two second s and rele ase it after you h ear a short beep. A green light signifies that power is on.
11. Reinstall the panel cover.
UPSPNL550-0 Panel Installation Instructions
4
Metasys® and Johnson Controls® are registered trademarks of Johnson Controls.
All other marks herein are the marks of their respective owners. © 2018 Johnson Controls.
Building Technologies & Solutions
507 E. Michigan Street, Milwaukee, WI 53202

Technical Specifications

UPSPNL550-0 Panel

Dimensions (H x W x D) 14 x 16 x 6 in. (355.6 x 406.4 x 152.4 mm) vented Backup time 2 minutes at full load 550 VA/330 W, 8 minutes at half load Input 96 VAC – 140 VAC 10 A UPS Output 550 VA/330 W Frequency 50/60 Hz Environmental RoHS compliant Temperature rating 32°F – 104°F (0°C – 40°C) Temperature See the CyberPower User’s Manual, which is included with the enclosure Humidity See the CyberPower User’s Manual, which is included with the enclosure Operating Rh% 0% – 90% non-condensing Enclosure NEMA type 1 Breaker 10 A Wire Connections Terminal block Mounting considerations Wall mounted or other substantial, non-movable structure Compliance United States cULus Listed; UL File E61466 CCN:NITW, Under UL 508A, Industrial Control Panels
FCC compliant to CFR47, Part 15, Subpart B, Class B
Canada cULus Listed; UL File E61466 CCN:NITW7, Under CAN/CSA C22.2 No. 14-05,
Industrial Control Panels Industry Canada Compliant to ICES-003, Class B
The performance specifications are nominal and conform to acceptable industry standard. For application at conditions beyond these specifications, consult the local Johnson Controls office. Johnson Controls shall not be liable for damages resulting from misapplication or misuse of its products.
European Single Point of Contact: NA/SA Single Point of Contact: APAC Single Point of Contact:
JOHNSON CONTROLS WESTENDHOF 3 45143 ESSEN GERMANY
JOHNSON CONTROLS 507 E MICHIGAN ST MIL WAUKEE WI 53202 USA
JOHNSON CONTROLS C/O CONTROLS PRODUCT MANAGEMENT NO. 22 BLOCK D NEW DISTRICT WUXI JIANGSU PROVINCE 214142 CHINA
UPSPNL550-0 Panel Installation Instructions
Published in U.S.A. www.johnsoncontrols.com
5
Loading...