JBA 40-9020 User Manual

INSTALLATION INSTRUCTIONS
** Installation recommendation: JBA recommends in most case that the vehicle be taken to a reputable exhaust shop for installation.
40-9020
2007 Toyota FJ Cruiser 4.0L
Parts List: Qty. Recommended Tools:
A. Intermediate pipe 1 14mm socket
B. JBA Mufer 1 Channel lock pliers C. Turn up pipe 1 Pry bar
D. Tail pipe hanger w/ tip 1 WD40 or equivalent E. 2-1/2” Clamp 2 F. Mufer hanger clamp 1
Start:
1. Remove and inventory new JBA
exhaust system.
2. Disconnect negative battery
cable and allow vehicle to cool.
3. With the vehicle raised and
properly supported, spray WD40 or equivalent on the factory exhaust
clamps and rubber isolators.
4. Unbolt the factory tail pipe above
the rear axle.
6. Next unbolt the intermediate pipe
from the catalytic converter assem-
bly. ***Save the factory hardware
for use later in the installation.
7. Using channel lock pliers remove the rear mufer hangers from the
(2) rubber isolators and remove the intermediate pipe / mufer assem­bly from the vehicle.
E
F
10. Install the mufer clamp with hangers (F) into the rear (2) mufer hanger rubber isolators with the
hangers shifting pipe to driver side.
11. Insert the center inlet of the JBA mufer (B) onto the intermediate pipe (A) with the offset outlet closer
to the center of the vehicle. Make
sure to fully slide the two together and that the mufer is level and at and tighten clamp (E) over the
connection.
B C
E
15. Install the tail pipe with tip (D)
onto the turn up pipe (C) and insert hanger into the rear rubber isolator.
Make sure to fully slide the two
together for a tight seal and proper alignment.
16. Make sure the new system
is properly aligned and their is
adequate clearance on the rear bumper then tighten the 2-1/2”
exhaust clamp (E).
5. Using channel lock pliers remove
the tailpipe hanger from the rear rubber isolator and remove the tailpipe from the rear.
5. Using channel lock pliers pry the
intermediate pipe hangers from the factory rubber isolators.
8. Insert the JBA intermediate pipe
(A) hangers into the (2) rubber isolators then bolt the intermediate pipe to the factory catalytic con­verter assembly using the factory
hardware.
9. Slide one of the supplied 2-1/2”
exhaust clamps (E) over the end of the JBA intermediate pipe (A).
12. Slip the rear offset end of the JBA mufer (B) into the mufer clamp with hangers (F). The offset end of the mufer should be toward
the center of the vehicle.
13. Slip the turn up pipe (C) onto the JBA mufer (B). Position mufer
clamp with hangers (F) over con-
nection and tighten.
14. Slide the supplied 2-1/2”
exhaust clamp (E) on to the turn up pipe (C).
17. Using a soft cloth, remove all
prints from exhaust tip.
18. Check all clamps and con­nections for proper t and align-
ment. Double check all clamps are tightened and that all hangers are secure in rubber grommets. It is recommended that after installation of the exhaust system you have all
slip connections tack welded by a mufer shop.
NOTES:
1. All exhaust systems expand about 1” rearward when exhaust
temperature rises.
Other recommended products:
Get even power for your FJ with
a set of smog legal stainless steel
JBA Cat4ward® headers.
Part No. Application
2035S 2007 4.0L stainless 2035SJS 2007 4.0L silver ceramic 2035SJT 2007 4.0L titanium ceramic
JBA recommends taking the vehicle to a mufer shop and having all slip connections tack welded.
For more information visit us online at www.jbaexhaust.com