JBA 40-9014 User Manual

INSTALLATION INSTRUCTIONS
**Inst allation recommendation:
JBA recommends in most cases that the vehicle be taken to a reputable exhaust shop.
Part s List
40-9014
A. Head pipe 1 B. Muffler, oval 1
2000 Toyota Tundra
V8-4.7L 2/4 WD Ext Cab/Std. Bed
E. 2-1/2" rear muffler clamp/hanger 1
TOOLS RECOMMENDED:
C B A
3/8" drive ratchet 9/16 deep wall socket 12mm socket channel lock pliers, 10" rubber mallet reciprocating saw or hack saw spray lubricant or penetrating oil anti-seize
TO START:
E
D
2. Disconnect negative battery cable and allow vehicle exhaust to cool.
1. Remove and inventory new JBA exhaust.
3. With vehicle raised and properly sup­ported, using a reciprocating saw or hack saw, cut the tail pipe approximately 2" behind muffler. See note #2.
9. Spray lubricant on rear muffler hanger rods at lower hole in rubber grommets.
13. Install coupling clamp over flare con­nection and tighten using a 12mm socket.
14. Install the 2-1/2" clamp (D) over end of head pipe.
19. Install tailpipe (C) from rear of vehicle slipping into rear of muffler. Slip rear tail pipe hanger rod into lower hole in rubber grommet.
4. Spray lubricant on rear tail pipe hang­er rod at lower hole in rubber grommet.
5. Remove rear tail pipe hanger rod from lower hole in rubber grommet.
6. Remove tail pipe assembly from rear of vehicle.
7. Using a 12mm socket, remove bolt from coupling clamp in front of muffler.
10. With muffler properly supported, remove rear muffler hanger rods from lower holes in rubber grommets using channel lock pliers.
11. Without damaging gasket seal, remove muffler assembly from coupling slip joint.
16. Install muffler (B) on head pipe (A) with offset slip joint forward and to the bottom.
17. Slip rear muffler clamp/hanger (E) over end of muffler (B) rear slip joint and hand tighten only at this time. NOTE: USE ANTI-SEIZE ON ALL THREADS.
15. Install rear muffler clamp/hanger (E) into lower holes in rubber grommets.
20. Rotate tail pipe to desired position, leaving clearance on rear body panel.
21. Tighten 2-1/2" clamp/hanger(E) com­pletely using a 9/16" socket. NOTE: USE ANTI-SEIZE ON ALL THREADS.
22. After installation, it is recommended that all clamps be retightened.
23. Tack weld all slip connections in three spots.
24. Using a soft cloth, remove all prints from turnout tip (D).
25. Lower vehicle and reattach the nega­tive battery cable.
NOTES:
1) Use anti-seize on threads of clamps (D) and (E). Nut will gaul if not used.
2) If vehicle is properly raised high enough, step #3 can be eliminated and exhaust system can be removed in one piece.
8. Spread clamp open just enough to slide forward off coupling flair.
12. Install JBA head pipe (A) t apping it on with a rubber mallet making sure it is seated on the gasket.
18. Position muffler making sure it is straight up and down. Tighten 2-1/2" clamp (D) completely using a 9/16" socket. NOTE: USE ANTI-SEIZE ON ALL THREADS
17203 7-16-02
Loading...