JBA 40-3045 User Manual

INSTALLATION INSTRUCTIONS
** Installation recommendation: JBA recommends in most case that the vehicle be taken to a reputable exhaust shop for installation.
Part No. 40-3045
2007 Chevrolet Suburban 5.3L 2007 GMC Yukon XL 5.3L
Parts List: Qty Recommended Tools:
A. Intermediate pipe 1 15mm deep socket B. JBA Mufer 1 9/16” deep socket C. Axle pipe 1 WD40 or similar lubricant D. Tail pipe with tip 1 Hack saw
E. 3” U-bolt clamp 2 Pliers F. 3” Clamp w/ hanger 1 Pry bar
A B
F
D
C
EE
Start:
1. Remove and inventory new JBA
exhaust system.
2. Disconnect negative battery cable and allow vehicle to cool.
3. Spray hangers with WD40 or
equivalent lubricant.
4. Cut the factory tail pipe behind
the rear mufer hanger.
7. Remove the factory mufer
assembly.
8. Install the intermediate pipe (A)
12. Install the JBA mufer (B) on
the end of the intermediate pipe (A).
13. Position the 3” U-bolt clamp over the slip connection with mufer
(B) and intermediate pipe (A).
14. Install the 3” U-bolt clamp with
hanger (F) at the rear of the JBA
mufer (B) and insert hangers into
the factory rubber isolators.
19. Align the new tip of the system
for proper clearance from fender and suspension. Secure in place by tightening clamps (E).
20. Using a soft cloth, remove all
prints from exhaust tip.
21. Check all clamps and con­nections for proper t and align-
ment. Double check all clamps are tightened and that all hangers are secure in rubber grommets. It is recommended that after installation of the exhaust system you have all
slip connections tack welded by a mufer shop.
NOTES:
1. All exhaust systems expand about 1” rearward when exhaust
temperature rises.
2. It may be necessary to adjust the
location of the spare tire.
3. Use anti-seize on threads of clamps.
5. Remove the rear factory exhaust
hangers from the rubber isolators and remove the tail pipe.
9. Insert the intermediate pipe (A) hanger into the forward rubber
isolator.
10. Temporarily snug the fasteners
connecting the intermediate pipe (A) to the cat assembly.
15. Position the axle pipe (C)
over the rear axle and then slip it
together with the mufer (B).
16. Fit 3” U-bolt clamp (F) over the end connection with mufer (B) and
axle-pipe (C).
17. Install the tail pipe with tip (D)
on to end of axle pipe (C). Insert hanger into rubber isolator.
To get more power out of your Tahoe or Yukon, JBA offers easy to
install 50 state smog legal perfor-
mance headers and ignition wires.
For more information about these and other quality performance products from JBA visit us online at
www.jbaheaders.com
JBA Cat4ward® Headers
p/n 1850-2JS
18. Install the 3” U-bolt clamp over
6. Remove the front mufer hanger
from the rubber isolator. Unbolt the
mufer assembly from the catalytic
converter assembly.
11. Slip the supplied 3” U-bolt clamp
(E) over the end of the intermedi­ate pipe (A).
connection between tail pipe (D)
and axle pipe (C).
JBA Powercables™ Ignition Wires
p/n 0807
JBA recommends taking the vehicle to a mufer shop and having all slip connections tack welded. 11.29.06
Loading...