INSTALLATION INSTRUCTIONS
**Inst allation recommendation:
JBA recommends in most cases that the vehicle be taken to a reputable exhaust shop.
G
40-3001
1996-1998 GM Pickup V8-5.7L E/S
Part s List
TOOLS RECOMMENDED:
reciprocating saw or hack saw
prybar
rubber mallet
ratchet
15mm deep socket
9/16 box wrench or socket
7/8" open end wrench
pair of channel lock pliers
13mm socket
anti-seize
impact wrench
spray lubricant or penetrating oil
TO START:
1. Remove and inventory new JBA
exhaust.
2. Disconnect negative battery cable and
allow vehicle exhaust to cool.
A. Head pipe 1
B. Muffler 24" 1
C. Tail pipe 1
D. Turn out 1
E. Front muffler clamp 3" 1
F. Rear muffler clamp/hanger 3" 1
G. Turn out clamp 3" 1
8. Remove three nuts on three bolt flange
using 15mm socket. You may want to use
some penetrating oil.
D
C
16. With muffler (B) in place, install muffler clamp (E) on slip fit joint. Position 1/4"
from lip. Tighten clamp completely with
9/16" deep wall socket. NOTE: Use some
anti-seize on all threads.
F
B
E
A
3. With vehicle raised and properly supported, using a reciprocating saw or hack
saw, cut the tail pipe approximately 3"
behind rear muffler hanger.
4. Spray lubricant on rear tail pipe hanger
grommet.
5. Using a pair of channel lock pliers,
remove hanger rod from bottom hole of
grommet.
10. Using a pair of channel lock pliers,
remove front and rear muffler hanger rods
from bottom holes of grommets.
Note: support muffler before starting.
11. Remove muffler assembly pulling
towards rear of vehicle. Note: use care not
to damage gasket on three bolt flange.
17. Install rear muffler clamp/hanger (F)
over slip joint on rear of muffler. Do not
tighten at this time.
18. Slip clamp/hanger (F) into lower hole
on rubber grommet.
23. Position rear muffler clamp/hanger (F)
1/4" from lip on slip joint and tighten completely with 9/16" deep wall socket. Note:
Use anti-seize on threads.
24. Slip turn out clamp (G) onto tail pipe.
Slip turn out (D) on tail pipe (C) approx.
1-1/2". Rotate tip to desired position leaving clearance from body. Position clamp
(G) with threads in an upward position.
Tighten completely with 9/16" deep wall
socket. Note: use anti-seize on threads.
6. Remove tail pipe assembly from the
rear of vehicle.
7. Spray lubricant on front and rear muffler
hanger grommets.
9. Remove oxygen sensor with 7/8" open
end wrench.
12. Install head pipe (A) with three bolt
flange. Install hanger through lower hole
in rubber grommet. Tighten three nuts
using 15mm socket. Note: we recommend using anti-seize on threads.
13. Install oxygen sensor using 7/8"
wrench.
14. Slip muffler (B) on head pipe approximately 2". Note: You may have to tap it in
with a rubber mallet. Make sure JBA logo
is to the rear.
19. Install tail pipe (C) from rear into slip
joint on muffler (B). Slip approx. 2".
20. Slip rear tail pipe (C) hanger into
lower hole in rubber grommet.
21. Position tail pipe (C) so hanger is not
cocked at an angle, and rubber grommet
is angled forward.
22. Inspect clearance around rear-end
shock and spare tire.
25. Using a soft cloth, remove all prints
from turnout tip.
26. Lower vehicle and reattach the negative battery cable.
NOTES:
1) It may be necessary to loosen and
realign the spare tire for proper clearance.
2) All exhaust systems will expand about
1" rearward when exhaust temperature
start to rise.
3) Use Anti-seize on threads of clamps D,
E and F.
We recommend taking the vehicle to an exhaust shop to have all slip connections tack welded.
17092
7-17-02