
AM4200T Outdoor CPE
User Manual V1.0
Jaton Technology Limited. CONFIDENTIAL
This document and the information contained in it is confidential information of Jaton Technology Limited (Jaton), and
shall not be used, or publish, or disclosed, or disseminated outside of Jaton in whole or in part without Jaton’s consent.
This document contains trade secrets of Jaton. Reverse engineering of any or all of the information in document is
prohibited. The copyright notice does not imply publication of this document
© COPYRIGHT 2007-2016, Jaton Technology Limited.
CONFIDENTIAL INFORMATION
Information contained herein is proprietary to Jaton for whose benefit
Confidentiality shall be maintained

Getting to Know Your Device
Packing list
Upon receiving the product, please unpack the product package carefully. Each product is
shipped with the following items:
If you find any of the items is missing, please contact our local distributor immediately.
Unpacking the Equipment
All the standard parts that are supplied in your LTE CPE Unit Installation Package. Please take
time to unpack the package and check its contents against this list.
LED Indicators
Orange Color – Device is powered on.
Blinking green – Wireless access not ready.
Green Color – Network is available
Blinking green – The data is in transmission.
Reserved function, not being used
currently.
Light is on –2.4G&5G Wi-Fi is on.
Solid green – LAN port is up.
Blinking green – LAN data activity in
progress.

Green Color – Device is powered on
Fast Blinking – Device is rebooting
Slow Blinking – Device is in normal operation
Solid Green – LAN port is up
Blinking Green – LAN data activity in progress
Light is on – SIM Card state ready
5 level signal strengths indication by 5 green
LEDs
1 green LED: RSRP<= -118dBm
2 green LEDS: -118dBm <=RSRP< -105dBm
3 green LEDS: -105dBm<=RSRP< -95dBm
4 green LEDS: -95dBm<=RSRP< -85dBm
5 green LEDS: -85dBm<=RSRP
Connection Scenario
For outdoor CPE product, it is suggested that the CPE device be installed in a shaded area to
avoid direct sun light exposure and prolong the device life.
To power on the device, the CPE must use a 48V DC power supply adapter. The power adapters
can operate in 90-250V AC range and therefore can be used in different country. An Ethernet
cable is required to connect the WAN port of IDU with the POE(LAN) port of ODU. By the way,
the ODU don’t support the hot-plugging. Once the device is powered up, the user should wait for
about 1 minute before the device becomes operational. For CPE with the SYS LED indicator, a
solid light indicates the system has completed the startup procedure.
To connect PC, LAN switch or other type of IP device to the CPE product, the user should use
FTP (Foil Twisted Pair) and connect to the appropriate LAN port. Once connected, the CPE LAN
LED indicator should be on.
To use the phone service, user can simply plug the phone line to the CPE RJ11 port in the back.
If the line is not registered or configured, a fast busy tone will be provided and the corresponding
LINE LED light will be off (the ROUTER Only).