Jade Range Co KC-24 Installation Manual

Jade Range LLC, A Middleby Company
2650 Orbiter Ave. Brea, CA 92821 Telephone (714) 961-2400 FAX (714) 961-2550
CHITWOOD REAL SMOKE BROILERS
MODELS KC-24, KC-36, KC-48, KC-60
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS
- Open Windows
- Do not touch electric switches
- Extinguish any open flame
-
Immediately call your gas company
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
Adequate clearances must be provided in front, rear and at sides of appliance for servicing. The appliance area must be kept free and clear from combustibles. There must be no material or obstacles obstructing the flow of combustion and ventilation air.
RETAIN THIS MANUAL FOR FUTURE REFERENCE
P/N 24-137 REV A 7/00 Page 1
TABLE OF CONTENTS
INSTALLATION
Receiving Instructions 3 Preparation for Installation 3 Installation Requirements 3 Guidelines for Safety 4 Gas Hook-up 5 Special Instructions for Broilers with Casters 5 Venting Instructions 6 Lighting and Shutdown Instructions 6
USER OPERATION AND MAINTENANCE
Operating Principles 7 Keeping Your Broiler Clean 7 Service Frequency 8 Repair Guidelines Broiler Diagram
P/N 24-137 REV A 7/00 Page 2
Thank you for choosing a new REAL SMOKE CHITWOOD BROILER for your kitchen. All our broilers are designed to give you years of trouble-free service. The guidelines in this manual are designed to ensure not only the safe and efficient installation of your CHITWOOD BROILER, but to maximize the quality of the broiler’s production.
RECEIVING INSTRUCTIONS
Your CHITWOOD BROILER shipped from the factory in excellent condition. When you receive the Broiler, carefully inspect the carton for any signs of damage. If any damage is noted, immediately file a claim with the trucking company. Failure to contact the trucking company immediately may result in their refusal of your claim.
PREPARATION FOR INSTALLATION
After uncrating the Broiler, remove all items from the top of the broiler (hood, grates and
insert). Remove the drawers and check the lower areas for any items packed below. You are ready to install the 6” sanitary legs and gas pressure regulator. These items can be found inside the broiler.
With the help of several people, carefully lay the Broiler on its side and install the four legs in
the threaded receptacles on the bottom of the Broiler. If you ordered your CHITWOOD BROILER with casters, please refer to the special note under the section titled “Special Instructions for Broilers with Casters.”
Before setting the Broiler upright, ensure that the four legs are securely tightened to the
bottom of the Broiler. The legs provided with this Broiler are equipped with special leveling pads. Before setting the Broiler on the legs, screw the leveling pads fully clockwise. Only after the Broiler is set upright should the Broiler be leveled. The use of a spirit level is recommended to accomplish satisfactory leveling of the Broiler.
All CHITWOOD BROILERS are supplied from the factory with a gas pressure regulator.
The regulator supplied with the unit must not be omitted or altered in any fashion. Your Broiler is supplied with a separate regulator, which must be installed at the rear of the Broilers, directly to the gas inlet pipe of the Broiler. Care must be taken to ensure the regular is installed with the directional arrow which is cast on the bottom of the regulator pointing toward the direction of the flow of gas into the Broiler.
INSTALLATION REQUIREMENTS
For optimum safety, the following installation clearances must be strictly followed when
installing your CHITWOOD BROILER. (FAILURE TO FOLLOW THESE GUIDELINES WILL RESULT IN LOSS OF WARRANTY AND A POSSIBLE DANGEROUS CONDITION.)
The Broiler is designed for installation on combustible flooring and adjacent to combustible
wall materials with at least 10” clearance to the back and side. Alternately, the Broiler may be installed without legs on a noncombustible curb or platform with the front of the Broiler projecting 3 inches beyond the front of the curb or platform only when installed with the corresponding optional stainless steel stand.
P/N 24-137 REV A 7/00 Page 3
Loading...
+ 7 hidden pages