2. Set the ERT module cover aside where it will not be damaged or fill with rain, dirt, or snow. You will use
the cover later in this installation procedure.
Caution Use only dial-type indexes from National, Actaris, Schlumberger, or Sprague meters with the
500G ERT module.
Indexes with bow-tie shaped wrigglers are not compatible with the 500G ERT module. You must use a
compatible index.
Note National (Lancaster) meter indexes are av ailabl e in differ ent m odels :
Indexes with legs Indexes with mounting holes
Some National meter indexes have index legs to mount the index on the meter or ERT module. Some
indexes have both legs and index mounting holes and some have just mounting holes. Mounting methods
are dependent on the index. Index types require different mounting screws to attach the index to the 500G
ERT module housing (see Installation Prerequisites on page 7
ERT module housing mounting posts (1). Indexes with mounting holes must be attached to the ERT
module housing's bracket mounting posts (2).
If your index has legs with mounting screw slots, skip steps 3 and 4. If your index has mounting screw
holes in the index back plate (no legs), perform steps 3 and 4, and skip steps 5 and 6.
3. For indexes with mounting screw holes in the index back plate (no legs), use the replacement index
mounting screws (SCR-0037-001, see Installation Prerequisites on page 7). Place one screw into the
index's right-hand mounting screw hole.
Note National index mounting screws are thread-forming screws and may require more torque.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 47
Proprietary and Confidential
). Indexes with legs must be mounted to the
National (Lancaster) Meter Installation
4. Attach the screw to the ERT module housing's right-index mounting post just enough to hold the screw
and the right end of the index in place.
5. For indexes with legs (mounting slots), screw one 10 - 20 x 3/8-inch screw (SCR-0017-001, see
Installation Prerequisites for screw information) into the right index mounting post one or two turns. Do
not completely tighten the screw.
6. Place the right index mounting screw slot under the screw head. Do not completely tighten the screw.
7. Carefully slide the index drive post into the ERT module shaft slot. Verify positive engagement of the
index wriggler to the ERT module shaft. (The following illustrations show index to shaft placement with
positive engagement.)
Warning Verify the index drive slot engages with the 500G ERT module shaft. Failure to mate the ERT
module shaft with the index drive post (or slot) can cause binding and lead to poor registration or meter
failure.
8. Install and tighten the left index mounting screw (for indexes with either mounting screw slots or holes).
Tighten the right index mounting screw. Tighten each index mounting screw evenly.
Warning Slide indexes with mounting screw slots all the way to the right. Verify the ERT module shaft
is aligned with the index drive post. Hold the index tightly in place while you secure the index mounting
screws.
9. Slide the ERT module cover over the index and housing. Verify the cover is installed correctly. The ERT
module label should be clearly visible and easily read.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 48
Proprietary and Confidential
National (Lancaster) Meter Installation
Programming the 500G Assembly
Program the 500G ERT module using:
• An FC200SR handheld computer with Field Deployment Manager (FDM) software version 3.9 or higher
or
• A FC300 with SRead handheld computer with Field Deployment Manager (FDM) software version 3.9 or
higher
or
• A 900MHz Belt Clip Radio with Field Deployment Manager (FDM) software version 3.9 or higher and a
customer-supplied laptop. The Belt Clip Radio connects to the user-supplied laptop using a USB cable or
Bluetooth.
The 500G ERT module modules support enhanced security with the Itron Security Manager. Enabling
command or enhanced security requires additional programming.
To enable enhanced security and for more complete programming information, see the Field Deployment Manager Endpoint Tools Mobile Application Guide (TDC-0934).
FC200SR FC300 with SRead 900MHz Belt Clip Radio
Caution You must program the ERT module before use.
The ERT module is programmed based on the meter's drive rate. Take note of the index drive rate shown on a
lower dial on the index. Elster American meter index drive rates are either 1-cubic foot, 2-cubic feet or 0.05
cubic meters (not shown below).
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 49
Proprietary and Confidential
National (Lancaster) Meter Installation
To program the ERT module assembly
1. Program the meter drive rate into the 500G ERT module using the endpoint programming device.
2. For all programming and Check Endpoint operations, hold the handheld programmer as close to vertical as
possible. For optimal results, keep the handheld programmer within 6 feet of the target ERT Module.
3. Verify you have the correct programming mode (Mobile/Handheld Mode).
4. Programming parameters are based on the configuration file loaded into the ERT module programming
device. During programming, the ERT module is set to the nearest 100 cubic feet; the last two digits (tens
and units) are programmed as zeros (0). After programming is complete, the ERT module assembly will
read to the nearest cubic foot.
Installing the 500G ERT Module Assembly on the Meter
After you program the ERT module, complete the installation by installing the ERT module on the meter.
To install the 500G ERT module on the meter
1. Align the black wriggler (1) so one of its four drive fins lines up with the meter's drive dog (2).
2. Carefully place the ERT module on the meter.
Warning Failure to correctly align the meter drive post and ERT module wriggler can cause binding and
lead to poor registration or meter failure. If there is a gap between the ERT module gasket and the meter,
it may be the wriggler of the ERT module is dead-headed against the meter drive dog as shown in the
following illustration.
Remove the 500G ERT module assembly and repeat the alignment procedure. You must engage the meter
drive dog in the ERT module wriggler.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 50
Proprietary and Confidential
National (Lancaster) Meter Installation
3. Insert the right module mounting screw and tighten the screw until the gasket is against the meter. Do not
completely tighten the mounting screw.
Note Use the original mounting screws to mount the 500G ERT module if they were the correct size and
not corroded. If you discarded the original screws, use the correct replacement screws (see Installation
Prerequisites on page 7
.)
4. Slightly raise the left side of the ERT module (the module will rotate on the right screw) until the left ERT
module mounting hole is approximately 1/4-inch above the left meter mounting hole.
5. Rotate the ERT module down until the ERT module mounting hole is approximately 1/4-inch below the
meter index mounting hole.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 51
Proprietary and Confidential
National (Lancaster) Meter Installation
6. Rotate the ERT module up to align the left mounting holes. Raising and lowering the ERT module on the
meter drive post facilitates the proper positioning and engagement of ERT module wriggler with the meter
drive post.
7. Insert the left mounting screw and tighten a few turns.
8. Tighten the right and left ERT module-to-meter mounting screws in an alternating pattern. Tighten each
mounting screw evenly.
Important Meter manufacturers: torque the mounting screws 15 to 20 inch-pounds.
Tip The following conditions ensure proper engagement of the ERT module to the meter:
• The ERT module fits flush against the meter body--there are no gaps between the ERT module gasket
and the meter body.
• The ERT module mounting holes align with the index cover mounting holes on the meter body.
• The meter test dial moves in relation to gas flowing through the meter.
9. Place a new tamper seal in the tamper seal cups surrounding the two mounting screws. Press the new
tamper seals into place using an 11/32-inch nut driver or similar blunt tool.
10. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
customer premises.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 52
Proprietary and Confidential
National (Lancaster) Meter Installation
500G ERT module installation on the Nationa l (Lanca s ter) m eter is com plete.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 53
Proprietary and Confidential
C HAPTER 6
Elster American and Itron Commercial Meter Installation
This chapter provides instructions to install the 500G ERT module on Elster American and Itron commercial
meters.
Warning Handle the commercial ERT module carefully so the metal passive radiator antenna is not damaged.
Removing the Index or Index Assembly from the Meter
Commercial ERT modules mount on Elster American meters in various configurations. These instructions
show metal mounting plates without tamper seal cups and plastic mounting plates with tamper seal cups to
represent mounting plate options. Begin ERT module installation by removing the index or index assembly
from the commercial meter.
Mounting plate with tamper seal cups Mounting plate without tamper seal cups
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 54
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
Indexes may be mounted on the 500G ERT module commercial Elster American meter gas ERT module
without mounting plates.
Index covers may (or may not) have tamper seal cups (on the back of the cover) for added security. Index
removal assumes the installer removes any tamper seals or wires before continuing with these instructions.
Note It may not be necessary to dismantle your commercial index assembly (index and cover). These
instructions do not include index/cover assembly for those applications.
Some diaphragm commercial meters do not require an index assembly mounting plate. Indexes can be
mounted directly to the ERT module.
To remove the index assembly
1. Remove any tamper seals (1) (or wire seals) from the index cover and mounting plate screws (2). Set the
index and cover assembly aside. You will re-install it later in the se ins tr u ct io ns.
2. Remove the index cover screws from the meter.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 55
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
3. Verify screws are 1/2-inch long and are not corroded. If the screws are the correct length and are not
corroded, keep them to re-install the ERT module assembly later in this procedure. If the screws are
damaged or not the correct length, discard.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover
materials. Do not leave materials on customer premises.
4. Remove the tamper seals from the mounting plate.
5. Remove the mounting plate screws and separate the mounting plate from the meter. Place the mounting
plate where it will not be damaged. You may use it later in this installation.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 56
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
Programming the Commercial Gas ERT Module Assembly
The 500G ERT modules support enhanced security with the Itron Security Manager. Enabling command or
enhanced security requires additional programming. Program the 500G ERT modules using:
• An FC200SR handheld computer with Field Deployment Manager (FDM) software version 3.9 or higher
or
• An FC300 with SRead handheld computer with Field Deployment Manager (FDM) software version 3.9
or higher
or
• A 900MHz Belt Clip Radio with Field Deployment Manager (FDM) software version 3.9 or higher and a
customer-supplied laptop. The Belt Clip Radio connects to the user-supplied laptop using a USB cable or
Bluetooth.
To enable enhanced security and for more complete programming information, see the Field Deployment Manager Endpoint Tools Mobile Application Guide (TDC-0934).
FC200SR FC300 with SRead 900MHz Belt Clip Radio
Caution You must program the ERT module before use.
Take note of the index drive rate shown on the index. The ERT module is programmed based on the drive
rate. The index shown has a 10-cubic foot drive rate.
To program the commercial ERT module
1. Program the index drive rate into the 500G ERT module> using the endpoint programming device.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 57
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
2. For all programming and Check Endpoint operations, hold the handheld as close to vertical as possible.
For best success, keep the handheld programmer within 6 feet of the target ERT module.
3. Verify you have the correct programming mode (Mobile/Handheld Mode). Programming parameters are
based on the configuration file loaded into the endpoint programming device.
4. During programming, the 500G ERT module is set to the nearest 100 cubic feet; the last two digits (tens
and units) are programmed as zeros (0). After programming is complete, the ERT module assembly will
read to the nearest cubic foot.
Attaching the Commercial 500G ERT Module Assembly on the
Commercial Meter
After you program the commercial gas ERT module, attach it to the commercial m eter.
To attach the commercial gas ERT module to the Elster American commercial meter
Warning Handle the 500G ERT module carefully so the metal passive radiator antenna is not damaged.
1. Tilt the 500G ERT module at an angle and turn the wriggler until the drive notches line up with the meter
wriggler's drive teeth.
Warning Failure to properly align the ERT module wriggler with the meter drive post can cause binding
and lead to poor registration or meter failure.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 58
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
2. Align the ERT module so the screw holes line up with the meter's top screw holes. Carefully lower the
module on the meter with the wriggler notches lining up with the meter's drive dog teeth.
Warning The INLET label on the 500G ERT module must line up with the INLET label on the meter
case.
3. Verify the bottom of the ERT module and the top of the meter meet. The ERT module housing should rest
on top of the meter without gaps.
WarningDo not press down on the 500G ERT module if a gap exists between the ERT module and the
meter. A gap may be caused by misalignment of the ERT module wriggler and meter's drive post. Pushing
down on the ERT module could damage the ERT module wriggler or meter drive post. To eliminate a
gap, slowly turn the ERT module's drive shaft back and forth until the module aligns with the meter's
drive teeth.
4. Place the index cover mounting plate on the commercial ERT module so the printing "FLOW FRONT
AL800 AL1000 AL1400 AL2300 AL5000 TURBINE ROTARY" stamped on the plate is toward the front
of the meter. (A gap between the mounting plate and meter at the screw locations is normal.)
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 59
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
5. Install four mounting screws included with the ERT module and tighten them in an alternating diagonal
sequence. For metal mounting plates with a flat screw surface, use ERT module mounting screws with
internal tooth washers. For plastic mounting plates with tamper screw cups, use ERT module mounting
screws (use O-ring AS-568A-011, 5/16" ID x 7/16-inch OD for a maximum moisture seal). Turn each
screw 1/4 to 1/2 turn after it contacts the mounting plate. If you have access to a torque driver, tighten
mounting screws to 20-25 inch-pounds.
6. Place new tamper seals over screws (if the mounting plate has tamper seal cups). Press the tamper seals
into place with an 11/32-inch nut driver or a similar blunt tool.
To attach the index and cover assembly on the meter and ERT module
1. Place the mounting plate gasket (previously removed) on the index cover mounting plate. Align the gasket
and index cover mounting plate screw holes.
2. Place the index and cover assembly on the index mounting plate. (The index must face the direction it
faced before removal.) Attach the index/cover assembly on the mounting plate using original 1/2-inch
index screws.
• Insert one screw and tighten two turns to hold it in place on the mounting plate.
• Insert the second mounting screw and tighten until secure.
• Completely tighten the first mounting screw.
Tighten each index cover mounting screw.
1. Install new tamper or wire seals. If tamper seals are installed, press into place with an 11/32-inch nut
driver or similar blunt tool. Crimp the seal if utility-approved wire seals are installed.
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 60
Proprietary and Confidential
Elster American and Itron Commercial Meter Installation
This completes installation of the commercial gas ERT module on an Elster American Meter commercial
(Part Number 80005901-001)
Component)
meter.
Attaching the Commercial ERT Module to an Itron Commercial
Meter
This section provides instructions for installing the 500G ERT module on the Itron, Sprague, Actaris, or
Schlumberger 675A, 800A, and 1000A commercial meter. Installation requires an Itron adapter kit available
from Itron, Owenton, KY.
Itron Adapter Kit Materials
Adapter plate
ERT mounting screws (4)
Adapter plate mounting screws (2)
Screw bushings (4)
Itron Part Number (Kit
550418-001
550416
550622
550420
TDC-1671-000 OpenWay Riva 500G Gas ERT Module Installation Guide, Direct Mount 61
Proprietary and Confidential
Loading...
+ 35 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.