Itron 100GDLR, 100GDLC, 100GDLD Users Manual

C
6
HAPTER
Elster American and Itron Actaris Commercial Meter Installation
This chapter provides instructions to install the 100G Datalogging Gas Endpoint on Elster American and Itron/Actaris Commercial Meters.
Warning Handle the commercial 100G Datalogging Gas Endpoint carefully so the metal passive radiator antenna is not damaged.
100G Datalogging Installation G uide - Direct Mount 57
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
Removing the Index/ Index Assembly from the Meter
Commercial 100G Datalogging Gas Endpoints can be mounted on Elster American Meters in various configurations. These instructions show metal mounting plates without tamper seal cups and plastic mounting plates with tamper seal cups to represent mounting plate options.
Mounting plate with tamper seal cups Mounting plate without tamper seal cups
Indexes may be mounted on the 100G Datalogging Commercial Elster American Gas Endpoint without mounting plates.
Index covers may (or may not) have tamper seal cups (on the back of the cover) for added security. Index removal assumes the installer will remove any tamper seals or wires before continuing with these instructions.
Note It may not be necessary to dismantle your commercial index assembly (index and
cover). These instructions do not include index/cover assembly for those applications.
Some diaphragm commercial meters do not require an index assembly mounting plate. Indexes can be mounted directly to the endpoint.
58 100G Datalogging Installation Guide - Direct Mount
Removing the Index/ Index Assembly from the Meter
To Remove the Index Assembly
1. Remove any tamper seals (1) (or wire seals) from the index cover and mounting plate
screws (2). Set the index/cover assembly aside. You will re-install it later in these instructions.
2. Remove the index cover screws from the meter. Verify screws are 1/2" long and are
not corroded. If the screws are the correct length and are not corroded, keep them to re-install the 100G Datalogging Gas Endpoint assembly later in this procedure. If the screws are damaged or not the correct length, discard.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals,
and other leftover materials. Do not leave materials on customer premises.
100G Datalogging Installation G uide - Direct Mount 59
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
3. Remove the gasket from the index cover mounting plate (if applicable). Set it aside
where it will not be damaged. Remove the tamper seals from the mounting plate. Remove the mounting plate screws and separate the mounting plate from the meter. Place the mounting plate where it will not be damaged. You will use it later in this installation.
Programming the 100G Datalogging Commercial Gas Endpoint
The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link
5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide (TDC-0744) for more complete programming information.
®
or Point-Link Pro® software version
Caution The 100G Datalogging Commercial Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint.
60 100G Datalogging Installation Guide - Direct Mount
Progra
mming the 100G Datalogging Commercial Gas Endpoint
Take note of the index drive rate shown on the index. The endpoint is programmed based on the drive rate. Elster American commercial meter index drive rates may be 5-, 10- or 100 cubic feet.
To Program the 100G Datalogging Commercial Gas Endpoint
1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the
FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly.
Caution Do not turn the drive wriggler faster than one turn per second.
100G Datalogging Installation G uide - Direct Mount 61
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
To Attach the 100G Datalogging Commercial Gas Endpoint to the Elster American Commercial Meter
Warning Handle the 100G Datalogging Commercial Gas Endpoint carefully so the metal passive radiator antenna is not damaged.
1. Tilt the 100G Datalogging Commercial Gas Endpoint at an angle and turn the
wriggler until the drive notches line up with the meter wriggler's drive teeth.
62 100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Commercial Gas Endpoint
2. Align the endpoint so the screw holes line up with the meter's top screw holes.
Carefully lower the endpoint on the meter with the wriggler notches lining up with the meter's wriggler teeth.
Warning The INLET label on the 100G Datalogging Commercial Gas Endpoint must line up with the INLET label on the meter case.
3. Verify the bottom of the endpoint and the top of the meter meet. The endpoint housing
should rest on top of the meter without gaps.
Warning Do not press down on the 100G Datalogging Commercial Gas Endpoint if a gap exists between the endpoint and the meter.
A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, slowly turn the endpoint's upper wriggler back and forth until the endpoint aligns with the meter's drive teeth.
100G Datalogging Installation G uide - Direct Mount 63
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
4. Place the index cover mounting plate on the commercial 100G Datalogging Gas
Endpoint so the printing "FLOW FRONT AL800 AL1000 AL1400 AL2300 AL5000 TURBINE ROTARY" stamped on the plate is toward the front of the meter. (A gap between the mounting plate and meter at the screw locations is normal.)
5. Install four mounting screws (SCR-0062-001 - see Installation Prerequisites on page 8
for screw information) and tighten them in an alternating diagonal sequence. For metal mounting plates with a flat screw surface, use endpoint mounting screws with internal tooth washers. For plastic mounting plates with tamper screw cups, use endpoint mounting screws (AS-568A-011, 5/16" ID x 7/16" OD o-rings may be used for a maximum moisture seal). Turn each screw 1/4 to 1/2 turn after it contacts the mounting plate. If you have access to a torque driver, tighten mounting screws to 72 inch-pounds.
6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press
into place with an 11/32" nut driver or similar blunt tool.
64 100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Commercial Gas Endpoint
To Attach the Index/Cover Assembly on the Elster American Commercial Meter
1. Place the mounting plate gasket (previously removed) on the index cover mounting
plate. Align the gasket and index cover mounting plate screw holes.
2. Place the index/cover assembly on the index mounting plate. (The index must face the
direction it faced before removal.) Attach the index/cover assembly on the mounting plate using original index screws. Insert one screw and tighten two turns to hold it in place on the mounting plate. Insert the second mounting screw and tighten until secure. Completely tighten the first mounting screw. Each index cover mounting screw must be tightened evenly.
3. Turn the commercial 100G Datalogging Gas Endpoint wriggler so it intersects with
the index wriggler. Carefully lower the index-cover mounting plate assembly onto the 100G Datalogging Gas Endpoint.
4. Install four endpoint mounting screws (SCR-0062-001, see Installation Prerequisites
on page 8). Tighten screws in an alternating diagonal pattern.
Insert the first screw and tighten enough to hold index assembly in place.
Insert the second screw diagonal to first screw and tighten two to three turns.
Insert the third screw, tightening two or three turns.
Insert the fourth screw and tighten until secure.
Tighten the first, 2nd, and third screw until secure. Turn each screw 1/4 to 1/2
turn after it contacts the cover.
Each endpoint mounting screw must be tightened evenly. If you have access to a torque-driver, tighten mounting screws to 72-inch pounds.
100G Datalogging Installation G uide - Direct Mount 65
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
5. Install new tamper or wire seals. If tamper seals are installed, press into place with an
11/32 nut driver or similar blunt tool. Crimp the seal if utility-approved wire seals are installed.
This completes installation of the 100G Datalogging Commercial Gas Endpoint on an Elster American Commercial meter.
66 100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
This section provides instructions for installing the 100G Datalogging Commercial Gas Endpoint on Itron/Actaris 675A, 800A, and 1000A commercial meters. Installation requires an Itron/Actaris adapter kit from Itron/Actaris.
Itron/Actaris Adapter Kit (Part Number 80005901-01) Adapter plate
Endpoint mounting screws (4)
Screw bushings (4)
Tamper seals
Extension driver
Before You Begin
Follow To Remove the Index/Index Assembly from the Meter on page 57 to prepare the Itron-Actaris meter for installation. Program the Commercial 100G Datalogging Gas Endpoint (see Programming the 100G Datalogging Gas Endpoint Assembly on page 60) prior to installation.
100G Datalogging Installation G uide - Direct Mount 67
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter
1. Turn the 100G Datalogging Commercial Gas Endpoint over and place the four
mounting screw bushings into the screw holes on the endpoint.
2. Turn the 100G Datalogging Commercial Gas Endpoint on its side and align the
wriggler with the Itron-Actaris Commercial meter's drive dog.
68 100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
3. Inlet lettering on the 100G Datalogging Commercial Gas Endpoint must line up with
Inlet lettering on the meter. Slowly lower the endpoint on the Itron-Actaris Commercial meter aligning the drive dog and wriggler. The endpoint housing should rest on the top of the meter without gaps.
Warning Do not press down on the 100G Datalogging Gas Endpoint if a gap exists between the endpoint and the meter.
A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, remove the 100G Datalogging Gas Endpoint and repeat steps 2 and 3.
To Attach the Index on the Itron-Actaris Commercial Meter
1. Place the Itron-Actaris adapter plate on the 100G Datalogging Commercial Gas
Endpoint with the two small screw holes in the adapter plate to the back of the meter.
Meter Front
100G Datalogging Installation G uide - Direct Mount 69
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
2. Place the extension driver on the 100G Datalogging Commercial Gas Endpoint
wriggler.
3. Align the index wriggler with the commercial 100G Datalogging Commercial Gas
Endpoint wriggler driver extension.
4. Install the two index mounting screws. Tighten the first screw two or three turns.
Install second screw and tighten to secure. Tighten the first screw to a snug fit. Each index mounting screw must be tightened evenly.
70 100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on an
Itron/Actaris Commerci al Meter
5. Place the index cover over the index with the clear side covering the index dials for
easy reading. Align the holes in the index cover with the endpoint adapter plate mounting holes. Secure with the four mounting screws from the adapter kit. Tighten the mounting screws in a diagonal alternating pattern.
Insert the first screw and tighten enough to hold the index in place.
Insert the second screw and tighten two to three turns.
Insert the third mounting screw and tighten two to three turns.
Insert the fourth mounting screw and tighten.
Tighten the first, third and second screw. Turn each screw 1/4 to 1/2 turn after the screw contacts the index cover. Each index mounting screw must be tightened evenly. If you have access to a torque-driver, tighten mounting screws to 72-inch pounds.
6. Insert tamper seals in the tamper seal cups on the index cover and press into place
with an 11/32 nut driver or similar blunt tool.
100G Datalogging Installation G uide - Direct Mount 71
Chapter 6 Elster American and Itron Actaris Commercial Meter Installation
This completes installation of the commercial 100G Datalogging Gas Endpoint on the Itron­Actaris Commercial meter.
72 100G Datalogging Installation Guide - Direct Mount
C
7
HAPTER
Sensus/Rockwell Commercial Meter Installation
This chapter provides instructions to install the 100G Datalogging Commercial Gas Endpoint on a Commercial Sensus/Rockwell diaphragm meter.
Removing the Index/ Index Assembly from the Meter
100G Datalogging Commercial Gas Endpoints can be mounted on Sensus/Rockwell Commercial Meters in various configurations. These instructions show the index assembly mounted without a mounting plate.
Note Sensus/Rockwell diaphragm commercial meters do not require an index
assembly mounting plate. Indexes can be mounted directly to the endpoint.
To Remove the Index/Index Assembly from the Meter
1. Remove any tamper seals (or wire seals) from the index cover and remove the index
cover mounting screws. You will re-install it later in these instructions.
100G Datalogging Installation G uide - Direct Mount 73
Chapter 7 Sensus/Rockwell Commercial Meter Installation
2. Remove the index screws from the meter. Set the index cover aside where it will not
be damaged or fill with dirt, rain or snow. You will re-install the index later in this procedure.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals,
and other leftover materials. Do not leave materials on customer premises.
Programming the 100G Datalogging Gas Endpoint
The 100G Datalogging Commercial Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide (TDC-0744) for more complete programming information.
®
or Point-Link Pro®
Caution The 100G Datalogging Commercial Sensus/Rockwell Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint.
74 100G Datalogging Installation Guide - Direct Mount
Programming the 100G Data
logging Gas Endpoint
Take note of the index drive rate shown on the index. The endpoint is programmed based on the drive rate. Sensus/Rockwell commercial meter index drive rates may be 5-, 10- or 100­cubic feet. The seven-dial index shown is a 100-cubic feet drive rate.
To Program the 100G Datalogging Commercial Gas Endpoint
1. Program the index drive rate into the commercial endpoint using the FC200SR. For all
programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly.
Caution Do not turn the drive wriggler faster than one turn per second.
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
100G Datalogging Installation G uide - Direct Mount 75
Chapter 7 Sensus/Rockwell Commercial Meter Installation
Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter
Warning Handle the 100G Datalogging Commercial Gas Endpoint carefully so
the metal passive radiator antenna is not damaged.
To Attach the 100G Datalogging Commercial Endpoint
1. Tilt the 100G Datalogging Commercial Gas Endpoint at an angle and turn the
wriggler until the drive notches line up with the meter wriggler's drive teeth.
2. Align the 100G Datalogging Commercial Gas Endpoint so the screw holes line up
with the meter's top screw holes. Carefully lower the endpoint on the meter so the wriggler's bars line up with the meter drive dog. Itron recommends installation with one bar inserted into the meter drive dog's u-shaped gear.
Warning The INLET label on the 100G Datalogging Commercial Gas Endpoint must line up with the INLET label on the Sensus/Rockwell meter case.
76 100G Datalogging Installation Guide - Direct Mount
Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commer
cial Diaphragm Meter
3. Verify the bottom of the 100G Datalogging Commercial Gas Endpoint and the top of
the meter meet. The endpoint housing should rest on top of the meter without gaps.
Warning Do not press down on the 100G Datalogging Commercial Gas Endpoint if a gap exists between the endpoint and the meter.
A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, slowly turn the 100G Datalogging Commercial Gas Endpoint's upper wriggler back and forth until the endpoint aligns with the meter's drive teeth.
4. Align the 100G Datalogging Commercial Gas Endpoint with the index mounting
holes. Verify the index drive dog intersects with the endpoint's wriggler. Install the endpoint mounting screws (SCR-0062-003 see Installation Prerequisites on page 8 for screw information). Turn each screw 1/4 to 1/2 turn after it contacts the index/endpoint assembly.
100G Datalogging Installation G uide - Direct Mount 77
Chapter 7 Sensus/Rockwell Commercial Meter Installation
5. Install the index cover. For index covers with flat-surface screw holes, use screws
(SCR-0062-002), flat washers (WSH-0020-005), and cork washers (WSH-0032-001). For index covers with tamper seal cups, use screws, (AS-568A-011, 5/16" ID x 7/16 OD) o-rings, and tamper seals.
6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press
into place with an 11/32" nut driver or similar blunt tool. If your mounting assembly requires a utility-approved wire seal, pass wires through holes in the screw heads and crimp the approved wire seal.
78 100G Datalogging Installation Guide - Direct Mount
Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commer
cial Diaphragm Meter
This completes installation of the 100G Datalogging Gas Endpoint on the Sensus/Rockwell Commercial Diaphragm meter.
100G Datalogging Installation G uide - Direct Mount 79
Chapter 7 Sensus/Rockwell Commercial Meter Installation
80 100G Datalogging Installation Guide - Direct Mount
e for installation instructions specific to
C
8
HAPTER
Dresser ROOTS Commercial Rotary Meter Installation
This chapter provides the instructions to mount 100G Datalogging Gas Endpoints (residential and commercial) on Dresser ROOTs Commercial Rotary Meters.
Some commercial AMR applications require a Dresser ROOTS Rotary Meter with a residential 100G Datalogging Gas Endpoint. Only Elster American version residential 100G Datalogging Gas Endpoints are compatible with Dresser ROOTS series rotary gas meters. This chapter provides the instructions to mount an Elster American residential 100G Datalogging Gas Endpoint on Dresser ROOTS AMR-ready Rotary Commercial Meters. Installation requires an AMR adapter kit supplied by Dresser. Refer to the Meter
Compatibility List on page 2 for Dresser AMR adapter kit part numbers.
Installation Prerequisites
Materials Supplied By Itron
100G Datalogging Gas Endpoint
New tamper seals - if applicable
Materials Supplied by You
AMR-ready Dresser ROOTS Rotary Meter
Adapter Kit from Dresser
Note Follow the Dresser Field Installation Instructions to modify the AMR-ready
Dresser ROOTS Meter for 100G Datalogging Gas Endpoint installation. Contact Dresser distributor or Dresser representativ the required AMR adapter kit.
100G Datalogging Installation G uide - Direct Mount 81
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
Installation Examples
The following pictures show typical installations.
Dresser B3 CTR/TC
Dresser LMMA CTR
Dresser LMMA TC
Dresser 8C15
82 100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Gas Endpoint Assembly
Programming the 100G Datalogging Gas Endpoint Assembly
The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link
5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide (TDC-0744) for more complete programming information.
®
or Point-Link Pro® software version
Caution The 100G Datalogging Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint.
The endpoint is programmed based on the meter's drive rate. See B3, LMMA, and S3A
CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information on page 85.
To Program the 100G Datalogging Gas Endpoint
1. Program the meter drive rate into the 100G Datalogging Gas Endpoint using the
FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot.
100G Datalogging Installation G uide - Direct Mount 83
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly after assembly.
Caution Do not turn the drive wriggler faster than one turn per second.
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
84 100G Datalogging Installation Guide - Direct Mount
B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive
Programming Information
B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information
Use the information in the following tables to program Dresser Roots Series B3, LMMA, and S3A Non-compensated Counter (CTR) and Temperature Compensated Counter (TC) registers. Reference the Meter Compatibility List on page 2 to confirm compatibility.
Settings for Series B3 Registers
Model Meter size Settings
CTR 8C-15C and 2M-11M
16M-56M
TC 8C-15C and 2M-11M
16M
Number of dials: 5
Drive rate: 10
PCOMP factor: NONE
Number of dials: 6
Drive rate: 100
PCOMP factor: NONE
Number of dials: 5
Drive rate: 100
PCOMP factor: NONE
Number of dials: 6
Drive rate: 1000
PCOMP factor: NONE
100G Datalogging Installation G uide - Direct Mount 85
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
Model
Meter Size
Settings
Settings for LMMA Registers
Model Meter size Settings
CTR 1.5M-11M
16M
TC 1.5M-11M
16M
Number of dials: 5
Drive rate: 10
PCOMP factor: NONE
Number of dials: 6
Drive rate: 100
PCOMP factor: NONE
Number of dials: 5
Drive rate: 50
PCOMP factor: NONE
Number of dials: 6
Drive rate: 500
PCOMP factor: NONE
Settings for Series S3A Registers
CTR 1.5M - 11M
16M
TC 1.5M - 11M
16M
Number of dials: 5
Drive rate: 10
PCOMP factor: NONE
Number of dials: 6
Drive rate: 100
PCOMP factor: NONE
Number of dials: 5
Drive rate: 100
PCOMP factor: NONE
Number of dials: 6
Drive rate: 1000
PCOMP factor: NONE
86 100G Datalogging Installation Guide - Direct Mount
B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Set
tings and Direct Drive Programming Information
Size
B3, LMMA and S3A CTR/TC Meter Drive Rates: Residential Direct Drive Programming*
B3 CTR Meter Size B3 CTR Meter Drive Rate
8C 10
11C 10
15C 10
2M 10
3M 10
5M 10
7M 10
11M 10
16M 100
23M 100
38M 100
56M 100
Drive rates in this table are for direct-mount residential style endpoints only (NOT commercial or remote endpoints).
B3 TC Meter Size B3 TC Meter Drive Rate
8C 100
11C 100
15C 100
2M 100
3M 100
5M 100
7M 100
11M 100
16M 1000
LMMA CTR Meter
LMMA CTR Meter Drive Rate
1.5M 10
3M 10
5M 10
7M 10
11M 10
16M 100
100G Datalogging Installation G uide - Direct Mount 87
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
LMMA TC Meter Size LMMA TC Meter Drive Rate
1.5M 50
3M 50
5M 50
7M 50
11M 50
16M 500
S3A CTR Meter Size S3A CTR Meter Drive Rate
1.5M 10
3M 10
5M 10
7M 10
11M 10
16M 100
S3A TC Meter Size S3A TC Meter Drive Rate
1.5M 100
3M 100
5M 100
7M 100
11M 100
16M 1000
Note S3A rotary meters are LMMA meters retrofitted with Series 3 End Bell
Adapter.
88 100G Datalogging Installation Guide - Direct Mount
Installing the Residential 100G Datalogging Gas Endpoint Assembly to the Dresser ROOTS Rotary Meter
Installing the Residential 100G Datalogging Gas Endpoint Assembly to the Dresser ROOTS Rotary Meter
After 100G Datalogging Gas Endpoint programming is complete, attach the 100G Datalogging residential endpoint assembly to the Dresser ROOTS Rotary Meter. This mounting procedure applies to B3 CTR/TC, LMMA CTR/TC, and 8C15 series Dresser ROOTS Meters.
To Attach the 100G Datalogging Gas Endpoint
1. The 100G Datalogging Gas Endpoint must be mounted on the adapter plate in an
upright position. Align the 100G Datalogging Gas Endpoint wriggler with the opening between the tabs of the adapter's drive dog. Insert one endpoint mounting screw and tighten enough to hold the endpoint. Do not completely tighten. Insert the second mounting screw and tighten two turns. Insert the third mounting screw and tighten two turns. Insert the last mounting screw and tighten until snug. Tighten the remaining mounting screws in an alternating, diagonal pattern until snug. All mounting screws must be tightened evenly.
Warning A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, remove the endpoint assembly and re-al ign the endpoi nt wri gg ler w ith the meter drive dog.
2. Complete necessary paperwork and verify all excess materials are removed from the
customer's premises.
100G Datalogging Residential Gas Endpoint installation on the Dresser ROOTS Rotary Meter is complete.
100G Datalogging Installation G uide - Direct Mount 89
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
for
Installation Requisites
Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
The information in this section guides you through the installation of the 100G Datalogging Commercial Gas Endpoint on Dresser ROOTS rotary meters.
Note A Dresser ROOTS rotary gas meter with an instrument drive is required for
this installation procedure. These instructions show an Elster American 100G Datalogging Commercial Gas Endpoint. The installation procedure is the same the Sensus/Rockwell 100G Datalogging Commercial Gas Endpoint.
100G Datalogging Elster American 100G Datalogging Sensus/Rockwell Commercial Gas Endpoint Commercial Gas Endpoint
Installation requires the following items:
Drive cover kit
100G Datalogging Commercial Gas Endpoint
A flat, slot-drive screwdriver
90 100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
Programming the 100G Datalogging Commercial Gas Endpoint Assembly
The 100G Datalogging Commercial Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide (TDC-0744) for more complete programming information.
®
or Point-Link Pro® software
Caution The 100G Datalogging Commercial Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint.
The endpoint is programmed based on the meter's drive rate. See B3, LMMA, and S3A
CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information on page 93.
To Program the 100G Datalogging Commercial Gas Endpoint
1. Program the meter drive rate into the 100G Datalogging Commercial Gas Endpoint
using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Commercial Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot.
100G Datalogging Installation G uide - Direct Mount 91
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly after assembly.
Caution Do not turn the drive wriggler faster than one turn per second.
3. Read the 100G Datalogging Commercial Gas Endpoint using the FC200SR.
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Commercial Gas Endpoint is counting correctly.
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Commercial Gas Endpoint.
92 100G Datalogging Installation Guide - Direct Mount
Installing t
he 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
B3, LMMA, and S3A CD/TD Dresser ROOTS Series Meter Drive Rates
Use the information in the following tables to program 100G Datalogging Commercial Endpoints installed on Dresser Roots Series B3, LMMA, and S3A Non-compensated Counter with Instrument Drive (CD) and Temperature Compensated Counter with Instrument Drive (TD) registers. Reference the Meter Compatibility List on page 2 to confirm compatibility.
Warning Drive rates listed in the following tables are for commercial endpoint programming. Do not use these settings to program residential or remote endpoints.
B3 CD Meter Size
8C 10
11C 10
15C 10
2M 10
3M 10
5M 10
7M 10
11M 10
16M 100
23M 100
38M 100
56M 100
B3 TD Meter Size
8C 100
11C 100
15C 100
2M 100
3M 100
5M 100
7M 100
11M 100
16M 1000
B3 CD Meter Drive Rates
B3 TD Meter Drive Rate
100G Datalogging Installation G uide - Direct Mount 93
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
LMMA CD Meter Size
LMMA CD Meter Drive Rate
1.5M 10
3M 10
5M 10
7M 10
11M 10
16M 100
LMMA TD Meter Size
LMMA TD Meter Drive Rate
1.5M 100
3M 100
5M 100
7M 100
11M 100
16M 1000
S3A CD Meter Size
S3A CD Meter Drive Rate
1.5M 100
3M 100
5M 100
7M 1000
11M 100
16M 1000
S3A TD Meter Size
S3A TD Meter Drive Rate
1.5M 100
3M 100
5M 100
7M 100
11M 100
16M 1000
Note S3A rotary meters are LMMA meters retrofitted with Series 3 End Bell
Adapter.
94 100G Datalogging Installation Guide - Direct Mount
Installing the 100G Data
logging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter
Note A cover is installed on the 100G Datalogging Commercial Gas Endpoint
mounted to a Dresser ROOTS Meter with S3A LMMA Accessory Units (or other Dresser ROOTs adapters with odometer gauges).
1. Locate the INSTRUMENT FACE stamp (2) and position the meter with the drive dog
(1) aligned (as shown).
Warning Handle the commercial 100G Datalogging Commercial Gas Endpoint carefully so the metal passive radiator antenna is not damaged.
2. Locate the INLET (1) stamp on the endpoint and position the endpoint as shown.
Verify the 100G Datalogging Commercial Gas Endpoint wriggler (3) and drive dog shaft (2) are aligned.
100G Datalogging Installation G uide - Direct Mount 95
Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation
3. Verify the endpoint wriggler and drive dog shaft are engaged by turning the
commercial endpoint wriggler. When properly engaged, you will feel resistance.
4. Place the index mounting plate on the endpoint and install the four mounting screws.
Do not disturb the shaft alignment.
5. Install the four 100G Datalogging Commercial Gas Endpoint mounting screws
(supplied with the commercial endpoint). Tighten mounting screws in an alternating, diagonal sequence.
Turn each screw 1/4 to 1/2 turn after it contacts the cover.
If you can utilize a torque wrench, tighten to 72 inch-pounds.
Each endpoint mounting screw must be tightened evenly.
6. Insert new utility-approved wire seals and crimp (if required).
Note To mount an index and index cover on a rotary meter without an accessory
odometer unit, remove the domed cover and reference To Attach the Index on the
Itron-Actaris Commercial Meter on page 69.
96 100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Comm
ercial Gas Endpoint on a Dresser ROOTS Rotary Meter
Completed Installation Examples
100G Datalogging Elster American Commercial Gas Endpoint mounted on a Dresser ROOTS Meter
100G Datalogging Sensus/Rockwell Commercial Gas Endpoint mounted on a Dresser ROOTS Meter
100G Datalogging Installation G uide - Direct Mount 97
Loading...