TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 43
Proprietary and Confidential
4. Carefully slide the index onto the mounting screws. Verify the 100G DLS housing drive post makes
positive engagement with the index wriggler.
Warning Indexes have varying drive mechanism styles. Failure to align the ERT wriggler with the index
drive post can cause binding and lead to poor registration or meter failure. To verify proper engagement of
the index to the ERT housing, spin the wriggler one clockwise rotation, then one-counterclockwise
rotation. Do not spin the wriggler more than one complete rotation. The wriggler should spin freely, with
little or no resistance.
5. Hold the index in place and tighten the index mounting screws.
6. Slide the ERT module cover over the index and housing. Verify the cover is installed correctly. The label
should be clearly visible and easily read.
Itron (Sprague) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 44
Proprietary and Confidential
Programming the 100G DLS Gas ERT Module Assembly
Caution You must program the 100G DLS gas ERT module before use.
Program the 100G DLSs using:
An FC200SR handheld computer with Field Deployment Manager (FDM) software version 1.1 or higher
or
A FC300 with SRead handheld computer with Field Deployment Manager (FDM) software version 1.1 or
higher
or
A 900MHz Belt Clip Radio with Field Deployment Manager (FDM) software version 1.1 or higher and a
customer-supplied laptop. The Belt Clip Radio connects to the user-supplied laptop using a USB cable or
Bluetooth.
See the Field Deployment Manager Endpoint Tools Mobile Application Guide (TDC-0934) for more complete
programming information.
FC200SR FC300 with SRead 900MHz Belt Clip Radio
The ERT is programmed based on the meter's drive rate. Take note of the index drive rate shown on a lower
dial on the index. Elster American meter index drive rates are either 1-cubic foot, 2-cubic feet or 0.05 cubic
meters (not shown below).
Itron (Sprague) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 45
Proprietary and Confidential
To program the 100G DLS gas ERT module
Program the meter drive rate into the 100G DLS gas ERT module using the endpoint programming
device.
For all programming and Check Endpoint operations, hold the handheld programmer as close to
vertical as possible. For best success, keep the handheld programmer within 6 feet of the target ERT.
Verify you have the correct programming mode (Fixed Network Mode, Mobile High Power Mode,
Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application.
Programming parameters are based on the configuration file loaded into the ERT module programming
device. During programming, the 100G DLS gas ERT module is set to the nearest 100 cubic feet; the last two
digits (tens and units) are programmed as zeros (0). After programming is complete, the ERT assembly will
read to the nearest cubic foot.
Attaching the 100G DLS Gas ERT Module to the Sprague 175RM
Meter
After you program the 100G DLS, attach the ERT assembly to the Sprague 175RM meter.
To attach the 100G DLS to the 175RM meter
1. Align the module wriggler (1) with the meter's drive dog (2).
Warning Failure to properly align the ERT wriggler with the meter drive post can cause binding and lead
to poor registration or meter failure.
Itron (Sprague) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 46
Proprietary and Confidential
2. Use the replacement screws shipped with the 100G DLS. Install module-to-meter mounting screws in an
alternating pattern.
Insert the right module mounting screw and tighten the screw enough to hold it in place. Do not
completely tighten.
Install the lower left module mounting screw and tighten two turns.
Insert the lower right mounting screw and tighten two turns.
Insert the upper left mounting screw and tighten to snug.
Tighten the mounting screws in an alternating diagonal fashion as shown in the photo below. Tighten
each mounting screw evenly.
3. Place a new tamper seal over the two screws in the tamper seal cups. Press the new tamper seals into place
using an 11/32-inch nut driver or similar blunt tool.
Itron (Sprague) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 47
Proprietary and Confidential
4. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
customer premises.
100G DLS installation on the Sprague 175RM meter is complete.
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 48
Proprietary and Confidential
This chapter provides instructions to install the 100G DLS gas ERT module on 175 - 250 CFH National
C H A P T E R 5
National (Lancaster) Meter Installation
(Lancaster) meters.
Removing the Meter Index
Begin the ERT module installation by removing the index cover and index from the meter.
To remove the index from the meter
1. Remove any tamper seals from the index cover screws. Remove the index cover screws and the index
cover from the meter. Discard the index cover mounting screws and index cover. The 100G DLS includes
new, different-size ERT mounting screws
Note You may use the removed index cover as a temporary storage container for screws. Properly
dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not
leave materials on customer premises.
2. Remove one index mounting screw completely. Hold one hand under the index to catch the screw.
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 49
Proprietary and Confidential
3. While removing the other mounting screw, pull the index away from the meter to keep the index backplate
against the back of the screw.
4. Remove the screw completely after the index is free of the meter.
5. Set the index aside where it will not be damaged or fill with dirt, rain, or snow. You will mount the index
in the ERT later in this procedure.
6. Discard the index mounting screws. The 100G DLS for National (Lancaster) meters includes new,
different-sized index mounting screws (see Installation Prerequisites on page 12 for screw information).
7. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free
of gasket residue or dirt before you install the 100G DLS assembly.
Assembling the ERT Module and Index
Continue ERT module installation by assembling the ERT module and index.
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 50
Proprietary and Confidential
To assemble the 100G DLS gas ERT module and index
1. Separate the 100G DLS housing from the cover by pulling the cover straight out from the housing.
2. Set the ERT cover aside where it will not be damaged or fill with rain, dirt, or snow. You will use the
cover later in this installation procedure.
Caution Use only dial-type indexes from National, Actaris, Schlumberger, or Sprague meters with the
100G DLS.
Indexes with bow-tie shaped wrigglers are not compatible with the 100G DLS. You must use a
compatible index.
Note National (Lancaster) meter indexes are available in different models:
Some National meter indexes have index legs to mount the index on the meter or ERT. Some indexes
have both legs and index mounting holes and some have just mounting holes. Mounting methods are
dependent on the index. Index types require different mounting screws to attach the index to the 100G
DLS housing (see Installation Prerequisites on page 12). Indexes with legs must be mounted to the ERT
housing mounting posts. Indexes with mounting holes must be attached to the ERT housing's bracket
mounting posts.
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 51
Proprietary and Confidential
If your index has legs with mounting screw slots, skip steps 3 and 4. If your index has mounting screw
holes in the index back plate (no legs), perform steps 3 and 4, and skip steps 5 and 6.
3. For indexes with mounting screw holes in the index back plate (no legs), use replacement index mounting
screws (SCR-0037-001, see Installation Prerequisites on page 12). Place one screw into the index's right-
hand mounting screw hole (1).
Note National index mounting screws are thread-forming screws and may require more torque.
4. Attach the screw to the ERT housing's right-index mounting post (2) just enough to hold the screw and the
right end of the index in place.
5. For indexes with legs (mounting slots), screw one 10 - 20 x 3/8-inch screw (SCR-0017-001, see
Installation Prerequisites on page 12 for screw information) into the right index mounting post one or two
turns. Do not completely tighten the screw.
6. Place the right index mounting screw slot under the screw head. Do not completely tighten the screw.
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 52
Proprietary and Confidential
7. Carefully slide the index drive post into the ERT wriggler. Verify positive engagement of the index
wriggler to the ERT drive dog. (The following illustrations show index to wriggler placement with
positive engagement.)
Warning Verify the index drive slot engages with the 100G DLS wriggler. Failure to mate the ERT
wriggler with the index drive post (or slot) can cause binding and lead to poor registration or meter
failure.
8. Install and tighten the left index mounting screw (for indexes with either mounting screw slots or holes).
Tighten the right index mounting screw. Tighten each index mounting screw evenly.
Warning Slide indexes with mounting screw slots all the way to the right. Verify the ERT wriggler is
aligned with the index drive post. Hold the index tightly in place while you secure the index mounting
screws.
9. Slide the ERT cover over the index and housing. Verify the cover is installed correctly. The ERT label
should be clearly visible and easily read.
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 53
Proprietary and Confidential
Programming the 100G DLS Gas ERT Module Assembly
Caution You must program the 100G DLS gas ERT module before use.
Program the 100G DLSs using:
An FC200SR handheld computer with Field Deployment Manager (FDM) software version 1.1 or higher
or
A FC300 with SRead handheld computer with Field Deployment Manager (FDM) software version 1.1 or
higher
or
A 900MHz Belt Clip Radio with Field Deployment Manager (FDM) software version 1.1 or higher and a
customer-supplied laptop. The Belt Clip Radio connects to the user-supplied laptop using a USB cable or
Bluetooth.
See the Field Deployment Manager Endpoint Tools Mobile Application Guide (TDC-0934) for more complete
programming information.
FC200SR FC300 with SRead 900MHz Belt Clip Radio
The ERT is programmed based on the meter's drive rate. Take note of the index drive rate shown on a lower
dial on the index. Elster American meter index drive rates are either 1-cubic foot, 2-cubic feet or 0.05 cubic
meters (not shown below).
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 54
Proprietary and Confidential
To program the 100G DLS gas ERT module
Program the meter drive rate into the 100G DLS gas ERT module using the endpoint programming
device.
For all programming and Check Endpoint operations, hold the handheld programmer as close to
vertical as possible. For best success, keep the handheld programmer within 6 feet of the target ERT.
Verify you have the correct programming mode (Fixed Network Mode, Mobile High Power Mode,
Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application.
Programming parameters are based on the configuration file loaded into the ERT module programming
device. During programming, the 100G DLS gas ERT module is set to the nearest 100 cubic feet; the last two
digits (tens and units) are programmed as zeros (0). After programming is complete, the ERT assembly will
read to the nearest cubic foot.
Attaching the 100G DLS Gas ERT Module Assembly to the
Meter
After you program the ERT module, complete the ERT module installation by installing the module on the
meter.
To attach the 100G DLS gas ERT module to the meter
1.Align the black wriggler (1) so one of its four drive fins lines up with the meter's drive dog (2).
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 55
Proprietary and Confidential
2. Carefully place the 100G DLS on the meter.
Warning Failure to correctly align the meter drive post and ERT module wriggler's fin can cause binding
and lead to poor registration or meter failure. If there is a gap between the ERT module gasket and the
meter, it may be the wriggler fin of the ERT module is dead headed against the meter drive dog.
Remove the 100G DLS assembly and repeat the alignment procedure. You must engage the meter drive
dog in the ERT module wriggler fin.
3. Install the ERT-to-meter mounting screws in an alternating fashion. 100G DLSs for National (Lancaster)
meters come with new, different-size ERT mounting screws (SCR-0014-004, see Replacement Screws on
page 12 for screw information). Tighten each ERT mounting screw evenly.
Insert the right index cover mounting screw and tighten the screw enough to hold it in place. Do not
completely tighten.
Install the left index cover mounting screw and tighten to a snug fit. Finish by tightening the right
mounting screw to a snug fit.
Important Meter manufacturers should torque the mounting screws 15 to 20 inch-pounds.
4. Place new tamper seals over the screws. Press the new tamper seals into place using the 11/32-inch nut
driver or similar blunt tool.
5. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the
customer premises.
National (Lancaster) Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 56
Proprietary and Confidential
100G DLS installation on the National (Lancaster) meter is complete.
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 57
Proprietary and Confidential
This chapter provides instructions to install the 100G DLS gas ERT module on Elster American Meter and
Warning Handle the commercial 100G DLS carefully so the metal passive radiator antenna is not damaged.
Mounting plate with tamper seal cups Mounting plate without tamper seal cups
C H A P T E R 6
Elster American and Itron (Actaris) Commercial Meter
Installation
Itron (Actaris or Schlumberger) commercial meters.
Removing the Index or Index Assembly from the Meter
Commercial 100G DLS ERT modules can be mounted on Elster American Meters in various configurations.
These instructions show metal mounting plates without tamper seal cups and plastic mounting plates with
tamper seal cups to represent mounting plate options. Begin ERT module installation by removing the index
or index assembly from the commercial meter.
Elster American and Itron (Actaris) Commercial Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 58
Proprietary and Confidential
Indexes may be mounted on the 100G DLS commercial Elster American Meter gas ERT without mounting
Note It may not be necessary to dismantle your commercial index assembly (index and cover). These
instructions do not include index/cover assembly for those applications.
Some diaphragm commercial meters do not require an index assembly mounting plate. Indexes can be
mounted directly to the ERT.
plates.
Index covers may (or may not) have tamper seal cups (on the back of the cover) for added security. Index
removal assumes the installer removes any tamper seals or wires before continuing with these instructions.
To remove the index assembly
1. Remove any tamper seals (1) (or wire seals) from the index cover and mounting plate screws (2). Set the
index and cover assembly aside. You will re-install it later in these instructions.
Elster American and Itron (Actaris) Commercial Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 59
Proprietary and Confidential
2. Remove the index cover screws from the meter. Verify screws are 1/2-inch long and are not corroded. If
the screws are the correct length and are not corroded, keep them to re-install the 100G DLS assembly
later in this procedure. If the screws are damaged or not the correct length, discard.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover
materials. Do not leave materials on customer premises.
3. Remove the tamper seals from the mounting plate.
4. Remove the mounting plate screws and separate the mounting plate from the meter. Place the mounting
plate where it will not be damaged. You may use it later in this installation.
Elster American and Itron (Actaris) Commercial Meter Installation
TDC-0823-009 100G DLS Gas ERT Module Installation Guide, Direct Mount 60
Proprietary and Confidential
Programming the 100G DLS Commercial Gas ERT Module
Caution You must program the 100G DLS before use.
Assembly
Program commercial 100G DLS gas ERT module modules using:
An FC200SR handheld computer with Field Deployment Manager (FDM) software version 1.1 or higher
or
An FC300 with SRead handheld computer with Field Deployment Manager (FDM) software version 1.1
or higher
or
A 900 MHz Belt Clip Radio with Field Deployment Manager (FDM) software version 1.1 or higher and a
customer-supplied laptop. The Belt Clip Radio connects to the user-supplied laptop using a USB cable or
Bluetooth.
See the Field Deployment Manager Endpoint Tools Mobile Application Guide (TDC-0934) for more
complete programming information.
FC200SR FC300 with SRead 900MHz Belt Clip Radio
Take note of the index drive rate shown on the index. The ERT is programmed based on the drive rate. Elster
American commercial meter index drive rates may be 5-, 10- or 100 cubic feet. The index shown has a 5cubic foot drive rate.
Loading...
+ 39 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.