
ASSEMBLY INSTRUCTION
INSTRUCTIONS DE MONTAGE
B2009DZ/GYTF-1 TWIN / FULL BUNK BED/
LIT SUPERPOSÉ SIMPLE / DOUBLE
PART LIST / LISTE DE PIECES:
A:Front LSF Post/
Poteau avant LSF
1PC
E:Upper LSF Guardrail/
Garde-corps supérieur
LSF
1PC
B:Rear LSF Post/
Poteau arrière LSF
1PC
F:Upper RSF Guardrail/
Garde-corps supérieur
RSF
1PC
C:Rear RSF Post/
Poteau arrière RSF
1PC
G:Support Bar/
Barre de soutien
2PCS
D:Front RSF Post/
Poteau avant RSF
1PC
Rail de support
supérieur
2PCS
I:Lower Support Rail/
Rail de support
inférieur
2PCS
M:Slat Connector/
Connecteur à lamelles
88PCS
Q:Center Support Rail/
Rail de support central
1PC
J:Upper Guardrail/
Garde-corps supérieur
2PCS
N:Ladder/Échelle
2PCS
HARDWARE LIST / LISTE DE QUINCAILLERIE:
1: Bolt/Boulon
1/4*35mm
x 8PCS
2: Bolt/Boulon
1/4*27mm
x 8PCS
3: Bolt/Boulon
1/4*16mm
x 28PCS
K:Twin Slat/
Lattes jumelles
22PCS
Leg/Pied
O:
2PCS
4: Bolt/Boulon
1/4*10mm
x 2PCS
L:Full Slat/
Lame pleine
22PCS
P:Slat Spacer/
Entretoise de
lamelle
42PCS
5: Bolt/Boulon
M4*14mm
x 2PCS
6: Nut/Écrou
1/4
x 4PCS
7: Allen Key/
Clé Allen
4mm
x 1PC
8: Wrench/Clé
x 1PC
Washer/Machine
9:
à laver
x 8PCS
Screwdriver
(Not Provide)/
Tournevis
(Ne pas fournir)

NOTE: PLEASE DO NOT TIGHTEN ALL BOLTS UNTIL THE BED IS ASSEMBLED COMPLETELY.
NE PAS SERRER LES BOULONS JUSQU'À CE QUE LE MONTAGE SOIT COMPLETMENT TERMINE
STEP 1/ÉTAPE 1
7
G
3
A
Hardware 3: 4 pcs/
Matériel 3: 4 pièces
B
STEP 3/ÉTAPE 3
STEP 2/ÉTAPE 2
B
G
E
A
E
B
A
STEP 4/ÉTAPE 4
7
D
G
3
C
Hardware 3: 4 pcs/
Matériel 3: 4 pièces
STEP 5/ÉTAPE 5
E
E
A
7
H
3
A
D
F
D
C
G
F
G
C
STEP 6/ÉTAPE 6
E
J
B
H
E
1
I
F
C
9
7
J
J
F
I
Hardware 3: 16 pcs/
Matériel 3: 16 pièces
D
Hardware 1: 8 pcs/
Matériel 1: 8 pièces
Hardware 9: 8 pcs/
Matériel 9: 8 pièces

NOTE: PLEASE DO NOT TIGHTEN ALL BOLTS UNTIL THE BED IS ASSEMBLED COMPLETELY.
NE PAS SERRER LES BOULONS JUSQU'À CE QUE LE MONTAGE SOIT COMPLETMENT TERMINE
STEP 7/ÉTAPE 7
J
H
H
Hardware 4: 2 pcs/
Matériel 4: 2 pièces
J
STEP 9/ÉTAPE 9
STEP 8/ÉTAPE 8
J
7
4
H
O
Q
7
Hardware 3: 4 pcs/
Matériel 3: 4 pièces
O
O
3
Q
G
5
G
Q
STEP 10/ÉTAPE 10
6
8
N
Hardware 6: 8 pcs/
Matériel 6: 8 pièces
Hardware 2: 8 pcs/
Matériel 2: 8 pièces
2
7
Q
G
Hardware 5: 2 pcs/
Matériel 5: 2 pièces
E
N
F
G
N
8
6
2
G
N
7

NOTE: PLEASE DO NOT TIGHTEN ALL BOLTS UNTIL THE BED IS ASSEMBLED COMPLETELY.
NE PAS SERRER LES BOULONS JUSQU'À CE QUE LE MONTAGE SOIT COMPLETMENT TERMINE
STEP 11/ÉTAPE 11
M
K/L
M
K/L
M
STEP 12/ÉTAPE 12
H
M
K
K/L
COMPLETED/TERMINÉ
STEP 13/ÉTAPE 13
K
H
P
K/L
L
L
P
For items use on wooden floor, hard surfaces or carpets. It is recommended to install protective pads under all
legs and supports to avoid damage or scratches when placing furniture on a wood floor or other hard surface, and to limit
indentation and prevent discoloration if placing on carpet.
Pour les articles à utiliser sur le parquet, les surfaces dures ou les tapis. Il est recommandé de placer des
coussins protecteurs sous tous les pieds et toutes les bases des meubles pour éviter d’endommager ou d’égratigner les
planchers en bois ou autres surfaces dures, et pour limiter l’empreinte et empêcher la décoloration quand les meubles
reposent sur la moquette.