Iron-A-Way AE46, AE42, E46, E42, ANE46 Installation Manual

...
Installation
Manual
MODELS:
AE46, AE42, E46, E42, ANE46, ANE42, NE46, NE42
TABLE OF CONTENTS
SWIVEL UNITS (AE46, AE42, ANE46, ANE42)............................pg.3
NON-SWIVEL UNITS (E46, E42, NE46, NE42)...........................pg.11
ELECTRICAL INSTRUCTIONS.....................................................pg.17
220 W. Jackson St, Morton, IL 61550
1-800-536-9495 or info@ironaway.com
(BOTTOM OF RACEWAY)
Swivel Units
Models: AE46, AE42, ANE46, ANE42
2
1
4
6
3
ELECTRICAL MODELS
(AE46 SHOWN)
3
NON- ELECTRICAL MODELS
6
(ANE46 SHOWN)
1
GET TO KNOW YOUR UNIT
1. CROSS BRACES
- Three braces for 46” units
- Two braces for 42” units
2. ELECTRICAL RACEWAY (AE46, AE42)
3. SIDE BRACKETS
4. ELECTRICAL CORD COVER (AE46 only; AE42
features a cord wrap)
5. ELECTRICAL OUTLET
6. HOT IRON REST (AE46, ANE46)
Tools Needed:
- Stud Finder
- 12-14” Level
- Tape Measure
- Small Flathead Screwdriver
- Electric Drill (with 1/4” & 1/8” drill bit)
- 1/4” Nut Driver (optional)
- Safety Glasses
- Utility Knife
Supplied Parts:
Recessed Mounting:
- Two #10 x 1 1/2” wood screws for top
portion of cabinet
- Two #14 x 2 1/2” Phillips screws for top side brackets
Surface Mounting:
- Two #14 x 4” wood screws
3
SWIVEL: PRE-INSTALLATION
1. DETERMINE MOUNTING HEIGHT
Using the charts provided, determine the mounting height above oor (the distance between the oor and the bottom of the cabinet). First choose your desired ironing board height from the left column, then locate the corresponding mounting height in the right column.
AE46 & ANE46
Desired Ironing
Board Height
36” 35” 34” 33”
AE42 & ANE42
Desired Ironing
Board Height
Mounting
Height Above
Floor
29” 28” 27” 26”
Mounting
Height Above
Floor
Desired Ironing
Board Height
36” 35” 34” 33”
25” 24” 23” 22”
2. LOCATE STUDS & UTILITIES
Using a stud nder, locate the wall
studs to be used for mounting.
Locate the existing wiring or other utilities in the wall to prevent drilling into/severing a wire and/or other utility during installation.
Mounting
Height
Above Floor
4 - Swivel Installation
3. ENSURE ADEQUATE SPACE
Refer to the chart provided below to ensure adequate clearance for ironing. The cabinet door opens at 180 degrees; allow 16” from side of cabinet for door to fully open.
1. Distance needed on either side of unit to fully swivel the board
2. Distance from wall to tip of ironing board
3. Distance from wall to board when in full swivel position
4. Standing area clearance (not shown)
The suggested distance from the side of the ironing where the user typically stands to ensure adequate space for ironing.
AE46
ANE46
7/8
16
7/8
50
7/8
32
” 32
24” 24”
AE42
ANE42
” 14
” 46
5/8
7/8
7/8
Swivel Installation - 5
SWIVEL: RECESSED INSTALLATION
Note: Instructions based on installation between 16” on-center studs.
1. CUT WALL OPENING
Cut an opening into the wall based on unit dimensions given below.
AE46/ANE46: 14 AE42/ANE42: 14
3/8
” x 59
3/8
” x 51
7/8
1/4
” x 3 x 3
7/8
7/8
2. ATTACH CLEATS
Attach a 2” x 4” cross support cleat between the studs so it is level with the bottom of the opening. This will give support to the drywall during installation and the cabinet once installed in the wall.
3. PRE-DRILL HOLES
Your unit will be attached to the studs by screws in the upper and lower sides of the cabinet.
AE46 & AE42: Remove electrical raceway before proceeding by removing the top and bottom screws on the raceway.
Using a 1/8” drill bit, pre-drill holes into the sides of the cabinet, 14” from the top
and 2
1/2
” from the back.
14” from top of cabinet
CLEAT
1/2
2
” from back
of cabinet
Example shown with exposed
studs & unit to illustrate mounting.
6 - Swivel Installation
AE46 SHOWN
Loading...
+ 14 hidden pages