Step 4:
Install the castors to the four corners at bottom by M6*12 self-tapping screws. Install the M12*L90 Leveling Legs also to each corner.
Refer the left upward view picture.
REV
1
QTY
1
COMPONENT
BOTTOM TRAY
Component List
REV
H1
QTY
4
SCREWS AND NUTS
M12*L90 Leveling Leg
Step 5:
Install side panels, adjust the diagonal dimension of cabinets. Remark: because the cabinets is disassembled design, after assemble, please check and adjust the diagonal dimension, ensure the space between doors are acceptable, doors could open and close well.
Refer the left picture.
Step 6:
Install front door, rear door. Put the door block to the hole of the bottom of frame, and set the front door/rear door. Fix the top of front/ rear door by bolts and top of frame.
Refer the left picture.
2
2
3
1
4
4
5
4
6
2
7
1
8
1
FRAME
TOP TRAY
HORIZONTAL SUPPORT
VERTICAL SUPPORT
SIDE PANEL
REAR DOOR
FRONT DOOR
H2
H3
H4
H5
H6
H7
H8
4
M8*12 Round Head Inner Hex Scew
M8 Flange Nut
M6*12 Screw
M6 Cage Nut
M4*8 Self-tapping Screw
M6*12 Tapping Screw
Side Panel Limit Stop
04 01
01
SNB Series Standing Network Rack Assembly Instruciton
Step 1:
Use M8*12 round head inner hex screws & M8 flange nuts to connect the frames, top & bottom.
Note A: Ensure that the frame with earthing kits is at the right side, earthing kits is at bottom when assemble. NoteB: Ensure that the fan-unit at top & cable entry at bottom is close to the rear side.
Refer the left picture.
Step1 Step2
Step3 Step4
Step5 Step6
Step 2:
Use M4*8 self-tapping screw to fix the fan unit to the top tray and side panel limit stops to the four posts of the two frames.
Refer the left picture.
Step 3:
Install the horizontal supports to the vertical supports with M6x12 Screws first.Then Install the vertical supports to the horizontal supports.
Note :1 If you have split side panels, first install the divider before you install the horizontal supports
Note : The distance between the front and rear2
Note : The distance between the front and rear2 vertical supports can be adjusted according to your equipment installation depth.
Note :3 Use Hole 5 + 6 for 800mm and 8 + 9 for 1000mm depth Racks to have the correct Distance for vertical supports.
Refer the left picture.