Installation/ Startup Information
These instructions must be read and understood completely before attempting installation.
Split System CondensersInstallation Instructions
WARNING
Installation or repairs made by unqualified persons can result in hazards to you and others. Installation MUST conform with local building codes or, in the absence of local codes, with the the National Electrical Code NFPA 70/ANSI C1-1999 or current edition and Canadian Electrical Code Part 1 CSA C.22.1.
The information contained in this manual is intended for use by a qualified service technician familiar with safety procedures and equipped with the proper tools and test instruments.
Failure to carefully read and follow all instruc­tions in this manual can result in equipment malfunction, property damage, personal injury and/or death.
After uncrating unit, inspect thoroughly for hidden damage. If damage is found, notify the transportation company im­mediately and file a concealed damage claim.
Figure 1
Dimensions
CAUTION
Improper installation, adjustment, alteration, service or maintenance can void the warranty.
The weight of the condensing unit requires caution and proper handling procedures when lifting or moving to avoid personal injury. Use care to avoid contact with sharp or pointed edges.
Safety Precautions
1. Always wear safety eye wear and work gloves when installing equipment.
2. Never assume electrical power is disconnected. Check with meter and disconnect.
3. Keep hands out of fan areas when power is connected to equipment.
4. R--22 causes frost--bite burns.
5. R--22 is toxic when burned.
NOTE TO INSTALLING DEALER: The Owners Instruc­tions and Warranty are to be given to the owner or promi­nently displayed near the indoor Furnace/Air Handler Unit.
24
33
Chassis #3
27
Minimum Mounting Pad Sizes with pad starting at 9” from structure for minimum clearances
Chassis #3 27” W X 28” D
“H” = Ranges from 26” to 44”
Refer to Specification Sheet
35
H
2
501 01 1504 00
Split System Condensers Installation Instructions
Locating The Outdoor Unit:
Check local codes covering zoning, noise, platforms.
If practical, avoid locating next to fresh air intakes, vent or bedroom windows. Noise may carry into the openings and disturb people inside.
Placement of the unit should be in a well drained area or unit must be supported high enough so runoff will not enter the unit.
Do not locate where heat, lint or exhaust fumes will be dis­charged on unit (as from dryer vents).
Clearances:
Nominal operating clearances, where practical, are 48 inches (120 cm) above unit for discharge air and 18 inches (40cm) around coil for intake air on three sides. Clearance on one side (normally between unit and structure) may be reduced to 6inches (15cm). Nominal clearances are based from a solid parallel object, wall, roof overhang, etc.
Do Not install under roof overhangs without guttering. A minimum vertical clearance of 48” is required to overhang.
The clearance may be reduced from a single object with a small surface area, such as the end of a wall, outside cor­ner of a wall, fence section or a post, etc. As a general rule the width ofthe object should equal the minimum clearance from the unit. For example, a 4 inch (10cm) fence post could be 4 inches (10cm) from the unit.
Roof top installations are acceptable providing the roof will support the unit and provisions are made for water drain­age and the noise or vibration through the structure.
Do not install the unit in a recessed or confined area where recirculation of discharge air may occur.
Heat Pumps Only: The top surface of platform must be above average winter snow levels to prevent coil blockage.
Inside corner locations on single story structures require evaluation. Large overhanging soffits may cause air recir­culation in a corner area even though recommended clear­ances are maintained. As a guide locate theunit far enough out so that half of the discharge grille is out from under the soffit.
Two or more units may be spaced with 18 inches (45cm) between units.
A service clearance of 24 inches (60cm) is desirable from control box end or side. Control box and corner panel be­low it can be loosened and moved out to the side to facili­tate servicing. Internal components can be accessed through control box corner or top only.
Unit Support:
The unit must be level, and supported above grade by beams, platform or apad. Platform or padcan be of open or solid construction but should be of permanent materials such as concrete, bricks, blocks, steel or pressure treated timbers approved for ground contact. Refer to Unit Clear­ances to help determine size of supports etc. Soil condi­tions should be considered so the platform or pad does not shift or settle excessively and leave the unit only partially supported.
CAUTION
Inadequate support could cause excessive vibration and noise or binding and stress on refrigerant lines resulting in equipment failure.
To minimize vibration or noise transmission, it is recom­mended that supports not be in contact with the building structure. However, slabs on grade constructions with an extended pad are normally acceptable.
A. Ground Level Installation:
If beams or an open platform are used for support it is rec­ommended that the soil be treated or area be graveled to retard the growth of grasses and weeds.
B. Roof Top Installation:
This type of installation is not recommended on wood frame structures where low noise levels are required.
Supporting structure or platform for the unit must be level. If installation is on a flat roof the unit should be 4 inches (10cm.) above roof level. Four by four posts placed over a load bearing wall make a suitable mounting platform.
If possible, place the unit over one or more load bearing walls. If there are several units, mount them on platforms that are self--supporting and span load bearing walls. These suggestions are to minimize noise and vibration transmission through the structure. If the structure is a home or apartment, avoid (if practical) locating the unit over bedrooms or study.
NOTE: When condensing unit is to be installed on a bonded guaranteed roof, a release must be obtained from the building owner to free the installer from all liabilities.
501 01 1504 00
3
Split System CondensersInstallation Instructions
ClearancesFigure 2
Recommended Clearances
Full Wall
6”
24”
24”
Minimum Clearances
Full Wall
6”
24”
Full Wall
Minimum Clearances
Full Wall
6”
24”
24”
Minimum Clearances
Full Wall
6”
24”
24”
18”
24”
6”
18”
24”
Minimum Clearances
Full Wall
6”
18”
24”
Half Wall
18”
18”
6” Pipe
24”
6”
18”
6”
24”
24”
4