These instructions must be read and understood completely before attempting installation.
T9MPV, C9MPT, H9MPT, T9MPT
Safety Labeling and Signal Words
DANGER, WARNING, CAUTION, and NOTE
The signal words DANGER, WARNING,
CAUTION, and NOTE are used to identify levels of
hazard seriousness. The signal word DANGER is
only used on product labels to signify an immediate
hazard. The signal words WARNING, CAUTION,
and NOTE will be used on product labels and
throughout this manual and other manual that may
apply to the product.
DANGER− Immediate hazards which will result in
severe personal injury or death.
WARNING− Hazards or unsafe practices which
could result in severe personal injury or death.
CAUTION − Hazards or unsafe practices which
may result in minor personal injury or product or
property damage.
NOTE − Used to highlight suggestions which will
result in enhanced installation, reliability, or
operation.
Signal Words in Manuals
The signal word WARNING is used throughout
this manual in the following manner:
!
WARNING
The signal word CAUTION is used throughout
this manual in the following manner:
!
CAUTION
Signal Words on Product Labeling
Signal words are used in combination with
colors and/or pictures or product labels.
Safety−alert symbol
When you see this symbol on the unit and in
instructions or manuals, be alert to the
potential for personal injury.
Use of the AHRI Certified TM Mark indicates a
manufacturer’s participation in the program.
For verification of certification for individual
products, go to www.ahridirectory.org .
20001. This reprinted material is not the complete and official position of the NFPA or ANSI, on the referenced subject, which is represented only by the standard in its entirety.
Specifications are subject to change without notice.
PERSONAL INJURY, AND/OR PROPERTY
DAMAGE HAZARD
Failure to carefully read and follow this warning could
result in equipment malfunction, property damage,
personal injury and/or death.
Installation or repairs made by unqualified persons could
result in equipment malfunction, property damage,
personal injury and/or death.
The information contained in this manual is intended for
use by a qualified service technician familiar with safety
procedures and equipped with proper tools and test
instruments.
Installation must conform with local building codes and
with the Natural Fuel Gas Code (NFCG) NFPA 54/ANSI
Z223.1, and National standards of Canada
CAN/CSA−B149.1 and .2 Natural Gas and Propane
Installation Codes.
INSTALLER: Affix these instructions on or adjacent to the
furnace.
CONSUMER: Retain these instructions for future
reference.
!
WARNING
440 01 2024 04 Dec. 2010
Required Notice for Massachusetts Installations
Important
The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows:
5.08: Modifications to NFPA−54, Chapter 10
2) Revise 10.8.3 by adding the following additional requirements:
(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential
purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet
above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:
1.INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the
installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back−up is installed on the
floor level where the gas equipment is to be installed. in addition, the installing plumber or gasfitter shall observe that a battery operated or hard
wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall
horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified license
professionals for the installation of hard wired carbon monoxide detectors.
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon
monoxide detector with alarm and battery back−up may be installed on the next adjacent floor level.
b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period
of thirty (30) days to comply with the above requirement; provided, however, that during said thirty (30) day period, a battery operated
carbon monoxide detector with an alarm shall be installed.
2.APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall
comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3.SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8)
feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign
shall read, in print size no less than one−half (1/2) inch in size, “GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
4.INSPECTION. The state of local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation
unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248
CMR 5.08(2)(a) 1 through 4.
(b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a) 1 through 4:
1.The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the
Board; and
2.Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or
structure used in whole or in part for residential purposes.
(c) MANUFACTURER REQUIREMENTS − GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall
horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by
the manufacturer for installation of the equipment and the venting system shall include:
1.Detailed instructions for the installation of the venting system design or the venting system components; and
2.A complete parts list for the venting system design or venting system.
(d) MANUFACTURER REQUIREMENTS − GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved
side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the
following requirements shall be satisfied by the manufacturer:
1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and
2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed
installation instructions.
(e) A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists
for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
For questions regarding these requirements, please contact the Commonwealth of Massachusetts Board of State Examiners of Plumbers and Gas
Fitters, 239 Causeway Street, Boston, MA 02114. 617−727−9952
2
Specifications are subject to change without notice.
440 01 2024 04
START−UP CHECK SHEET
For PSC Models *9MPT
(This sheet is optional. Keep for future reference.)
Date of Start−Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete.
All Electrical Connections Tight?
Have hoses been relocated for furnace U/D/H
application?
Calculated Input (BTU) Rate: (See Checks and
Adjustments Section).
Heating Check
Measured Line Pressure During High Heat:
Measured Manifold Pressure: High Heat
Low Heat
Temperature of Supply Air: High Heat
Low Heat
Temperature of Return Air:
Temperature Rise (Supply − Return): High Heat
Low Heat
In Rise Range (see furnace rating plate)?
Static Pressure (Ducts) High Heat: Supply
Return
The Blower Speed Tap used for: High Heat
Low Heat
Optional Check: CO?
CO2?
Cooling Check
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut−off Upstream of Furnace/Drip Leg
Gas Valve turned ON?
Type of Gas: Natural: Propane:
Filter Type and Size:
Shade in Heating Fan “Time OFF” Setting and Thermostat
Type setting:
Temperature of Supply Air:
Temperature of Return Air:
Temperature Difference:
Static Pressure (Ducts) Cooling: Supply
Return
The Blower Speed Tap used for: Cooling
Dealer Comments:
440 01 2024 04
Specifications are subject to change without notice.
3
START−UP CHECK SHEET
For Variable Speed Models *9MPV, *9MVX
(This sheet is optional. Keep for future reference.)
Date of Start−Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete.
Calculated Input (BTU) Rate: (See Checks and
Adjustments Section).
Heating Check
Measured Line Pressure During High Heat:
Measured Manifold Pressure: High Heat
Low Heat
Temperature of Supply Air: High Heat
Low Heat
Temperature of Return Air:
Temperature Rise (Supply − Return): High Heat
Low Heat
In Rise Range (see furnace rating plate)?
Static Pressure (Ducts) High Heat: Supply
Return
All Electrical Connections Tight?
Have hoses been relocated for furnace U/D/H
application?
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut−off Upstream of Furnace/Drip Leg
Gas Valve turned ON?
Type of Gas: Natural: Propane:
Filter Type and Size:
Shade in Final Furnace Settings Below:
Optional Check: CO?
CO2?
Cooling Check
Temperature of Supply Air:
Temperature of Return Air:
Temperature Difference:
Static Pressure (Ducts) Cooling: Supply
Return
Dealer Comments:
4
Specifications are subject to change without notice.
440 01 2024 04
SAFETY CONSIDERATIONS
Improper installation, adjustment, alteration, service,
maintenance, or use can cause explosion, fire, electrical shock,
or other conditions which may cause death, personal injury, or
property damage. Consult a qualified installer, service agency,
or your distributor or branch for information or assistance. The
qualified installer or agency must use factory−authorized kits or
accessories when modifying this product. Refer to the individual
instructions packaged with the kits or accessories when
installing.
Follow all safety codes. Wear safety glasses, protective
clothing, and work gloves. Use quenching cloth for
brazing operations. Have fire extinguisher available.
Read these instructions thoroughly and follow all
warnings or cautions included in literature and attached
to the unit. Consult local building codes, the current
editions of the National Fuel Gas Code (NFCG) NFPA
54/ANSI Z223.1, and the National Electrical Code (NEC)
NFPA 70.
In Canada refer to the current editions of the National
standards of Canada CAN/CSA−B149.1 and .2 Natural
Gas and Propane Installation Codes, and Canadian
Electrical Code CSA C22.1.
Recognize safety information. This is the safety−alert
symbol . When you see this symbol on the unit and in
instructions or manuals, be alert to the potential for
personal injury. Understand these signal words;
DANGER, WARNING, and CAUTION. These words are
used with the safety−alert symbol. DANGER identifies the
most serious hazards which will result in severe personal
injury or death. WARNING signifies hazards which could
result in personal injury or death. CAUTION is used to
identify unsafe practices which may result in minor
personal injury or product and property damage. NOTE is
used to highlight suggestions which will result in
enhanced installation, reliability, or operation.
!
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could cause personal
injury or death.
Before performing service or maintenance operations
on unit, always turn off main power switch to unit and
install lockout tag. Unit may have more than one
power switch.
!
CARBON MONOXIDE POISONING AND FIRE
HAZARD
Failure to follow safety warnings could result in
personal injury, death, and/or property damage.
This furnace is not designed for use in mobile homes,
trailers or recreational vehicles.
!
CUT HAZARD
Failure to follow this caution may result in damage
personal injury.
Sheet metal parts may have sharp edges or burrs.
Use care and wear appropriate protective clothing,
safety glasses and gloves when handling parts and
servicing furnaces.
WARNING
WARNING
CAUTION
Safe Installation Requirements
!
FIRE, EXPLOSION, AND CARBON MONOXIDE
POISONING HAZARD
Improper adjustment, alteration, service,
maintenance or installation could cause personal
injury, death and/or property damage.
Installation or repairs made by unqualified persons
could result in hazards to you and others.
Installation MUST conform with local codes or, in
the absence of local codes, with codes of all
governmental authorities having jurisdiction.
The information contained in this manual is
intended for use by a qualified service agency that
is experienced in such work, is familiar with all
precautions and safety procedures required in
such work, and is equipped with the proper tools
and test instruments.
NOTE: This furnace is design−certified by the CSA International
(formerly AGA and CGA) for installation in the United States and
Canada. Refer to the appropriate codes, along with this manual, for
proper installation.
WARNING
•Use only the Type of gas approved for this furnace (see
Rating Plate on unit). Overfiring will result in failure of heat
exchanger and cause dangerous operation. (Furnaces
can be converted to Propane gas with approved kit.)
•Install this furnace only in a location and position as
specified in “Installation” of these instructions.
•Provide adequate combustion and ventilation air to the
furnace as specified in “Combustion and Ventilation Air” of
these instructions.
•Combustion products must be discharged outdoors.
Connect this furnace to an approved vent system only, as
specified in “Combustion and Ventilation Air, HorizontalVenting and Masonry Chimney Venting” of these
instructions.
•Never test for gas leaks with an open flame. Use a
commercially available soap solution made specifically for
the detection of leaks to check all connections, as
specified in “Gas Supply and Piping, Final Gas PipingCheck” of these instructions.
•Always install furnace to operate within the furnace’s
intended temperature−rise range with a duct system which
has an external static pressure within the allowable range,
as specified in “Technical Support Manual” of these
instructions. See furnace rating plate.
440 01 2024 04
Specifications are subject to change without notice.
5
•When a furnace is installed so that supply ducts carry air
circulated by the furnace to areas outside the space
containing the furnace, the return air shall also be handled
by a duct(s) sealed to the furnace casing and terminating
outside the space containing the furnace.
•A gas−fired furnace for installation in a residential garage
must be installed as specified in “InstallationRequirements” of these instructions.
•This furnace is not to be used for temporary heating of
buildings or structures under construction.
•This furnace is NOT approved for installation in
mobile homes, trailers or recreation vehicles.
•Seal around supply and return air ducts.
•Install correct filter type and size.
•Unit MUST be installed so electrical components are
protected from direct contact with water.
Safety Rules
Your unit is built to provide many years of safe and dependable
service providing it is properly installed and maintained. However,
abuse and/or improper use can shorten the life of the unit and
create hazards for you, the owner.
A. The U.S. Consumer Product Safety Commission encourages
installation of carbon monoxide alarms. There can be various
sources of carbon monoxide in a building or dwelling. The
sources could be gas−fired clothes dryers, gas cooking
stoves, water heaters, furnaces, gas−fired fireplaces, wood
fireplaces.
Carbon monoxide can cause serious bodily injury and/or
death. Carbon monoxide or “CO” is a colorless and odorless
gas produced when fuel is not burned completely or when the
flame does not receive sufficient oxygen.
Therefore, to help alert people of potentially dangerous carbon
monoxide levels, you should have a commercially available
carbon monoxide alarm that is listed by a nationally
recognized testing agency in accordance with Underwriters
Laboratories Inc. Standard for Single and Multiple Station
Carbon Monoxide Alarms, ANSI/UL 2034 or the CSA 6.19−01
Residential Carbon Alarming Devices installed and
maintained in the building or dwelling concurrently with the
gas−fired furnace installation (see Note below). The alarm
should be installed as recommended by the alarm
manufacturer’s installation instructions.
B. There can be numerous sources of fire or smoke in a building
or dwelling. Fire or smoke can cause serious bodily injury,
death, and/or property damage. Therefore, in order to alert
people of potentially dangerous fire or smoke, you should have
fire extinguisher and smoke alarms listed by Underwriters
Laboratories installed and maintained in the building or
dwelling (see Note below).
Note: The manufacturer of your furnace does not test any alarms
and makes no representations regarding any brand or type
of alarms.
C. To ensure safe and efficient operation of your unit, you should
do the following:
1.Thoroughly read this manual and labels on the unit. This
will help you understand how your unit operates and the
hazards involved with gas and electricity.
2.Do not use this unit if any part has been under water.
Immediately call a qualified service technician to inspect the
unit and to replace any part of the control system and any gas
control which has been under water.
3.Never obstruct the vent grilles, or any ducts that provideair to the unit. Air must be provided for proper combustion
and ventilation of flue gases.
Frozen Water Pipe Hazard
!
WATER DAMAGE TO PROPERTY HAZARD
FaiIure to follow this caution may result in property
damage.
Do not leave your home unattended for long periods
during freezing weather without turning off water
supply and draining water pipes or otherwise
protecting against the risk of frozen pipes and
resultant damage.
Your furnace is designed solely to provide a safe and comfortable
living environment. The furnace is NOT designed to ensure that
water pipes will not freeze. It is equipped with several safety
devices that are designed to turn the furnace off and prevent it from
restarting in the event of various potentially unsafe conditions.
If your furnace remains off for an extended time, the pipes in your
home could freeze and burst, resulting in serious water damage.
If the structure will be unattended during cold weather you should
take these precautions.
1. Turn off the water supply to the structure and drain the water
lines if possible and add an antifreeze for potable water to
drain traps and toilet tanks. Open faucets in appropriate
areas.
2. Have someone check the structure frequently during cold
weather to make sure it is warm enough to prevent pipes
from freezing. Instruct them on a service agency to call to
provide service, if required.
3. Install a reliable remote sensing device that will notify
somebody of freezing conditions within the home.
Winter Shutdown
If you go away during the winter months and do not leave the heat
on in your home, the plastic transition box and the condensate trap
on the furnace must be protected from freeze damage.(SeeFigure 11 trough Figure 20)
1.Disconnect the
drain fitting that is located downstream of the combustion
blower. Insert a funnel into the hose and pour four(4) ounces
of sanitary type (RV) antifreeze into the condensate trap.
Reconnect the
the vent drain fitting. Secure with the hose clamp.
2.Disconnect the
condensate trap. Insert a funnel into the hose and and pour
four(4) ounces of sanitary type (RV) antifreeze into the
plastic Transition box. Squeeze the hose together near the
end and quickly reconnect the
hose to the stub on the condensate trap. Secure with the
hose clamp.
When you return home, your furnace will be ready to start, as it is
not necessary to drain the antifreeze from the furnace.
CAUTION
−or−
−or−
5
/8″ (15.9mm) OD rubber hose from the vent
5
/8″ (15.9mm) OD rubber hose to the stub on
3
/4″ (19.1mm) OD rubber hose from the
3
/4″ (19.1mm) OD rubber
6
Specifications are subject to change without notice.
440 01 2024 04
Installation
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in
personal injury or death.
This furnace can NOT be common vented or
connected to any type B, BW or L vent or vent
connector, nor to any portion of a factory−built or
masonry chimney. If this furnace is replacing a
previously common-vented furnace, it may be
necessary to resize the existing vent and chimney
to prevent oversizing problems for the other
remaining appliance(s). See Venting and
Combustion Air Check in the Combustion &
Ventilation Air section. This furnace MUST be
vented to the outside.
Installation Positions
This furnace can be installed in an upflow, horizontal (either left or
right) or downflow airflow position. DO NOT install this furnace on
its back. For the upflow position, the return air ductwork can be
attached to either the left or right side panel and/or the bottom. For
horizontal and downflow positions, the return air ductwork must be
attached to the bottom. The return air ductwork must never be
attached to the back of the furnace.
Location and Clearances
1. Refer to Figure 1 or Figure 2 for typical installation and
basic connecting parts required. Refer to Figure 3 for
typical horizontal direct vent installation and basic
connecting parts required. Supply and return air plenums
and duct are also required.
2. If furnace is a replacement, it is usually best to install the
furnace where the old one was. Choose the location or
evaluate the existing location based upon the minimum
clearance and furnace dimensions (Figure 4).
!
CARBON MONOXIDE POISONING HAZARD.
Failure to follow this warning could result in
personal injury or death.
Do NOT operate furnace in a corrosive atmosphere
containing chlorine, fluorine or any other damaging
chemicals, which could shorten furnace life.
Refer to Combustion & Ventilation Air section,Contaminated Combustion Air for combustion air
evaluation and remedy.
WARNING
Figure 1
*8″ (203.2mm) Min.
20′ (6.1m) Max.
in same
atmospheric
zone
Vent Pipes MUST be
supported
Horizontally and
Vertically
* Increase minimum from 8 (203.2mm) to 18 (457.2mm) for cold climates (sus
tained temperatures 0F (-17C) and below for 24 or more consecutive hours).
Typical Upflow Installation
Aluminum or non-rusting shield recommended.
(See Vent Termination Shielding for dimensions).
Coupling on ends of
exhaust pipe. Total
Inlet Pipe
(not used on
Single Pipe
model)
DISCHARGE AIR
pipe & coupling out
side structure = 8″
(203.2mm)
*8″ (203.2mm) Min.
20′ (6.1m) Max.
in same atmospheric zone
25−23−33
Figure 2Typical Downflow Installation
Inlet Pipe
(not used on
Single Pipe
model)
Vent Pipes MUST
be supported Horizon
tally and Vertically
See Vent Termination
Shielding in Vent Section.
*8″ (203.2mm) Min.
20′ (6.1m) Max. in
same atmospheric zone
Coupling on inside
and outside of wall to
restrain vent pipe
*8″ (203.2mm) Min.
20′(6.1m) Max.
in same
atmospheric zone
8″ Min.
!
CAUTION
FROZEN AND BURST WATER PIPE HAZARD
FaiIure to follow this caution may result in property
damage.
Special precautions MUST be made if installing
furnace in an area which may drop below freezing.
This can cause improper operation or damage to
equipment. If furnace environment has the
potential of freezing, the drain trap and drainline
must be protected. The use of electric heat tape or
RV antifreeze is recommended for these
installations. (See “Condensate Trap Freeze
Protection Section”)
440 01 2024 04
* Increase minimum from 8 (203.2mm) to 18 (457.2mm) for cold climates (sus
tained temperatures 0F (-17C) and below for 24 or more consecutive hours).
Specifications are subject to change without notice.
25−23−33a
7
Installation Requirements
1. Install furnace level.
2. This furnace is NOT to be used for temporary heat of
buildings or structures under construction.
3. Install furnace as centralized as practical with respect to the
heat distribution system.
4. Install the vent pipes as short as practical, and in
accordance to these instructions. (See Vent andCombustion Air Piping section).
5. Maintain clearance for fire safety and servicing. A front
clearance of 24″ (609.6mm) required and 30″ (762mm)
recommended for access to the burner, controls and filter.
See clearance requirements in Figure 4.
6. Use a raised base for upflow furnace if the floor is damp or
wet at times.
7. For downflow installations, non combustible subbase must
be used under the furnace unless installation is on a non
combustible floor surface. This requirement applies even
when a coil box or cabinet is used.
8. For horizontal installations, line contact is permissible only
between lines formed by intersection of back and two sides
of furnace jacket, and building joists, studs or framing.
9. Residential garage installations require:
•Burners and ignition sources installed at least 18″
(457.2mm) above the floor.
•Located or physically protected from possible damage by
a vehicle.
10. Local codes may require a drain pan under the entire
furnace and condensate trap when the furnace is installed in
attic application.
This furnace may be used for construction heat provided that all the
following conditions are met:
•The furnace is permanently installed with all electrical
wiring, piping, venting and ducting installed according to
these installation instructions. A return air duct is provided,
sealed to the furnace casing, and terminated outside the
space containing the furnace. This prevents a negative
pressure condition as created by the circulating air blower,
causing a flame rollout and/or drawing combustion products
into the structure.
•The furnace is controlled by a thermostat. It may not be “hot
wired” to provide heat continuously to the structure without
thermostatic control.
•Clean outside air is provided for combustion. This is to
minimize the corrosive effects of adhesives, sealers and
other construction materials. It also prevents the
entrainment of drywall dust into combustion air, which can
cause fouling and plugging of furnace components.
•The temperature of the return air to the furnace is
maintained between 55° F (13° C) and 80° F (27° C) , with no
evening setback or shutdown. The use of the furnace while
the structure is under construction is deemed to be
intermittent operation per our installation instructions.
•The air temperature rise is within the rated rise range on the
furnace rating plate, and the firing rate has been set to the
rating plate value.
•The filters used to clean the circulating air during the
construction process must be either changed or thoroughly
cleaned prior to occupancy.
•The furnace, ductwork and filters are cleaned as necessary
to remove drywall dust and construction debris from all
HVAC system components after construction is completed.
•After construction is complete, verify furnace operating
conditions including ignition, input rate, temperature rise
and venting according to these instructions.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
FaiIure to follow this warning could result in
personal injury or death.
Do NOT operate furnace in a corrosive atmosphere
containing chlorine, fluorine or any other damaging
chemicals, which could shorten furnace life.
Refer to Combustion & Ventilation Air section,Contaminated Combustion Air for combustion air
evaluation and remedy.
Furnace Installation Considerations
The installation of the furnace for a given application will dictate the
position of the furnace, the airflow, ductwork connections, vent and
combustion air piping. Consideration must be given to the
following:
Condensate Trap and Drain Lines
The supplied condensate trap must be attached to the furnace side
panel on either the left or right side. For horizontal installations, the
drain trap is vertically attached to the side panel below the furnace.
A minimum clearance of 6″ (152.4mm) below the furnace is
required for the condensate trap. Downward slope of the
condensate drain line from the condensate trap to the drain
location must be provided. Adequate freeze protection of the drain
trap and the drain line must be provided. See “Condensate DrainTrap” section for further details.
Leveling
Proper leveling of the furnace must be provided to insure proper
drainage of the condensate from the furnace. The furnace must be
level to within
for upflow and downflow installations or top to bottom for horizontal
installations.
Vent and Combustion Air Connections
For venting information literature, call 931.270.4100 with the
complete model and serial number of the furnace.
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CSA
B149 code. Vent systems must be composed of pipe, fittings,
cements, and primers listed to ULC S636. The special vent fittings
and accessory concentric vent termination kits and accessory
external drain trap have been certified to ULC S636 for use with
those Royal Pipe and IPEX PVC vent components which have
been certified to this standard. In Canada, the primer and cement
must be of the same manufacturer as the vent system – GVS-65
Primer (Purple) for Royal Pipe or IPEX System 636, PVC/CPVC
Primer, Purple Violet for Flue Gas Venting and GVS-65 PVC
Solvent Cement for Royal Pipe or IPEX System 636
Cement for Flue Gas Venting, rated Class IIA, 65 deg C. must be
used with this venting system - do not mix primers and cements
from one manufacturer with a vent system from a different
manufacturer. Follow the manufacturer’s instructions in the use of
primer and cement and never use primer or cement beyond its
expiration date.
The safe operation, as defined by ULC S636, of the vent system is
based on following these installation instructions, the vent system
manufacturer’s installation instructions, and proper use of primer
and cement. All fire stop and roof flashing used with this system
must be UL listed material. Acceptability under Canadian
standard CSA B149 is dependent upon full compliance with all
installation instructions. Under this standard, it is recommended
that the vent system be checked once a year by qualified service
personnel.
The authority having jurisdiction (gas inspection authority,
municipal building department, fire department, etc) should be
consulted before installation to determine the need to obtain a
permit.
(1) System 636 is a trademark of IPEX Inc.
1
/4″ (6.4mm) from front to back and from side to side
t, PVC
(1)
8
Specifications are subject to change without notice.
440 01 2024 04
Consignes spéciales pour l’installation de ventillation au
Canada
L’installation faite au Canada doit se conformer aux exigences du
code CSA B149. Ce systême de ventillation doit se composer de
tuyaux, raccords, ciments et apprêts conformes au ULC S636. La
tuyauterie de ventillation des gaz, ses accessoires, le terminal
concentrique mural ainsi que l’ensemble du drain de condensat
extérieur ont été certifiés ULCS 636 pour l’application des
composantes Royal Pipe, IPEX PVC qui sont certifiées à ce
standard. Au Canada, l’apprêt et le ciment doivent être du même
fabricant que le système d’évacuation. L’apprêt GVS-65 (Purple)
et le ciment-solvant GVS-65 doivent être utilisé avec les Royal
Pipe. Système IPEX 636, apprêt PVC/CPVC, Purple pour
évacuation des gaz de combustion et système IPEX 636(1)t,
ciment PVC pour évacuation des gaz de combustion, coté classe
IIA, 65 deg C. doivent être utilisés avec le système d’évacuation
IPEX 636 – Ne pas combiner l’apprêt et le ciment d’un
manufacturier avec un système d’évacuation d’un manufacturier
différent.
Bien suivre les indications du manufacturier lors de l’utilisation de
l’apprêt et du ciment et ne pas utiliser ceux-ci si la date d’expiration
est atteinte.
L’opération sécuritaire, tel que définit par ULC S636, du système
de ventilation est basé sur les instructions d’installation suivantes,
ainsi que l’usage approprié de l’apprêt et ciment. Tout arrët feu et
solin de toit utilisés avec ce système doivent être des matériaux
listés UL. L’acceptation du standard Canadien CSA B419 est
directement relié à l’installation conforme aux instructions ci- haut
mentionnées. Le standard Canadien recommande l’inspection
par un personel qualifié et ce, une fois par année.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs
en bâtiments, département des incendies, etc) devraient être
consultées avant l’installation afin de déterminer si un permis est
requis.
On the Dual Certified furnace, the vent and combustion air pipes
attach to the furnace through the top panel for the upflow and
horizontal installations. For the downflow installation, the vent and
combustion air pipes attach to the furnace through the alternate
locations on the furnace side panels.
Note: On the Direct Vent furnace, the vent pipe attaches to the
furnace through the side panels. The combustion air pipe attaches
to the top panel or to the alternate location on the side panel.
On the Single Pipe furnace, the vent pipe attaches to the furnace
through the furnace side panels.
Note: Repositioning of the combustion blower is required for the
vent pipe connection to the furnace through the “right side” panel.
See “Vent and Combustion Air Piping” section for further details.
Horizontal Furnace Installation
Figure 3
Vent
Pipe
NOTE: 5″ (127mm) bottom clearance required for condensate trap.
This furnace can be installed horizontally in an attic, basement,
crawl space, alcove, or suspended from a ceiling in a basement or
utility room (See Figure 3). Do not install furnace on its back or in
the reverse airflow positions as safety control operation will be
adversely affected.
If the furnace is to be suspended from the floor joists in a crawl
space or the rafters in an attic, it is necessary to use steel pipe
straps or an angle iron frame to rigidly attach the furnace to prevent
movement. These straps should be attached to the furnace bottom
side with sheet metal screws and to the rafters or joists with bolts.
The preferred method is to use an angle iron frame bolted to the
rafters or joists.
If the furnace is to be installed in a crawl space, consult local codes.
A suitable concrete pad or blocks are recommended for crawl
space installation on the ground.
NOTE: 6″ (152.4mm) bottom clearance required for condensate
trap.
24″ (609.6mm) inches between the front of the furnace and
adjacent construction or other appliances MUST be maintained for
service clearance. [30″ (762mm) inches is required to remove
furnace].
Keep all insulating materials clear from louvered door. Insulating
materials may be combustible.
The horizontal furnaces may be installed directly on combustible
wood flooring or supports as long as all required furnace
clearances are met. See Figure 3.
This furnace MUSTNOT be installed directly on carpeting or tile or
other combustible material other than wood flooring or supports.
For horizontal installation over a finished living space. A field
fabricated auxiliary drain pan with drain pipe is required to prevent
damage by overflow due to blocked condensate drain.
Typical Horizontal Installation
Inlet Pipe (not used on Single Pipe model)
Condensate
Trap
25−23−34
440 01 2024 04
Specifications are subject to change without notice.
9
Figure 4
Dimensions and Clearances
TRAP (KO) (COUNTERFLOW)
AIR INTAKE (KO)
(ALTERNATE)
TRAP (KO)
UPFLOW/HORIZONTAL
1
(57.2)
/
2
4
1
/
13
4
(336.6)
7
/
1
8
(47.6 )
D
C
Unit
Capacity
*9MPT050F12
*9MPT075F14
*9MPT100J16
*9MPT125L20
*9MPV050F12
*9MPV075F12
*9MPV100J20
*9MPV125L20
*9MVX040F12
*9MVX060F12
*9MVX080J20
*9MVX100L20
* Denotes Brand
F
AIR INTAKE
VENT
TOP
H
G
E
LEFT SIDE
GAS
611/
(177.5)
16
ELECTRICAL
11/
4
(318)
(27)
11/
16
VENT
413/
THERMOSTAT
(KO)
215/
(549.3)
8
24
(609.6)
(122.2)
16
(177.8)
7
47/
(123.8)
(34.9)
13/
8
283/
(730.3)
241/
16
(611.2)
175/
16
(439.7)
111/
16
(42.9)
8
Drawing is representative,
but some models may vary
BOTTOM
231/
8
(587.4)(98.4)
37/
8
ALL DIMENSIONS: in (mm)
CabinetBottomTop
AB
191/
8
(485.8)
191/
8
(485.8)
223/
4
(577.9)
241/
2
(622.3)
191/
8
(485.8)
191/
8
(485.8)
223/
4
(577.9)
241/
2
(622.3)
191/
8
(485.8)
191/
8
(485.8)
223/
4
(577.9)
241/
2
(622.3)
175/
(477.7)
175/
(477.7)
211/
(539.8)
23
(584.2)
175/
(447.7)
175/
(447.7)
211/
(539.8)
23
(584.2)
175/
(447.7)
175/
(447.7)
211/
(539.8)
23
(584.2)
C
DEFGH
21/
(54)
21/
(54)
(49.2)
7
/
(11.1)
21/
(54)
21/
(54)
(49.2)
7
/
(11.1)
21/
(54)
21/
(54)
(49.2)
7
/
(11.1)
143/
8
8
16
16
8
8
16
16
8
8
16
16
(374.7)
143/
(374.7)
183/
(476.3)
23
(584.2)
143/
(374.7)
143/
(374.7)
183/
(476.3)
23
(584.2)
143/
(374.7)
143/
(374.7)
183/
(476.3)
23
(584.2)
4
4
4
4
4
4
4
4
4
8
8
115/
4
8
8
115/
4
8
8
115/
4
(758.8)
297/
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
43/
(111 .1)
4
8
8
8
8
8
8
8
8
8
8
8
8
3111/
(804.9)
8
1311/
(347.7)
16
1913/
(503.2)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
41/
(114.3)
MINIMUM CLEARANCES TO COMBUSTIBLE
A
B
MATERIALS FOR ALL UNITS − in (mm)
REAR0
FRONT (combustion air openings in
3″ (76.2)
furnace and in structure)
FRONT
Required For Service
ALL SIDES Of SUPPLY PLENUM1″ (25.4)
*24″ (609.6)
SIDES0
VENT0
TOP OF FURNACE1″ (25.4)
*30″ (762mm) clearance recommended for furnace removal.
Horizontal position: Line contact is permissible only between
16
16
1
(30.2)
21/
(63.5)
21/
(63.5)
25/
(66.7)
21/
(57.2)
21/
(63.5)
21/
(63.5)
25/
(66.7)
21/
(57.2)
21/
(63.5)
21/
(63.5)
25/
(66.7)
21/
(57.2)
91/
2
2
(241.3)
91/
2
2
913/
(249.2)
(241.3)
113/
8
4
2
2
8
4
2
2
8
4
(288.9)
121/
(311.2)
91/
(241.3)
91/
(241.3)
113/
(288.9)
121/
(311.2)
91/
(241.3)
91/
(241.3)
113/
(288.9)
121/
(311.2)
8
4
2
2
8
4
2
2
8
4
2
2
2
2
2
2
2
2
2
2
2
2
lines formed by intersections of top and two sides of furnace
jacket, and building joists, studs or framing.
NOTE: Evaporator “A” coil drain pan dimensions may
vary from furnace duct opening size. Always consult
evaporator specifications for duct size requirements.
Furnace is designed for bottom return or side return.
Return air through back of furnace is NOT allowed.
1
1
/
4
(31.7)
7
/
2
8
(73)
3
2
11/
16
GAS (KO)
3
/
16
297/
8
(758.8)
273/
16
(690.6)
215/
16
3311/
(855.7)
(549.3)
16
KO = KnockOut
(60.3 )
/
8
(27)
413/
(122.2)
11/
(27)
(439.7)
8
175/
16
16
111/
(42.9)
(109.5)
45/
16
7
(177.8)
16
16
7
/
4
8
(123.8)
281/
2
(723.9)
1
18
(469.9)
RIGHT SIDE
TRAP (KO)
(COUNTERFLOW)
ELECTRICAL (KO)
AIR INTAKE (KO)
(ALTERNATE)
VENT (KO)
TRAP (KO)
UPFLOW/HORIZONTAL
21/
24
(609.6)
215/
(549.3)
(57.2)
(336.6)
8
THERMOSTAT
/
2
4
131/
4
(KO)
3
(19.1)
/
4
TYPE
40
(1016)
17/
8
(47.6)
25−23−36b
10
Specifications are subject to change without notice.
440 01 2024 04
Knock Outs
!
CUT HAZARD
Failure to follow this caution may result in
personal injury.
Sheet metal parts may have sharp edges or burrs.
Use care and wear appropriate clothing, safety
glasses and gloves when handling parts and
servicing furnaces.
Use a hammer and screwdriver to strike a sharp blow (see
Figure 5) directly to the knockout tie points or use a hammer in the
upper left corner of the desired knockout. Remove any burrs and
sharp edges.
CAUTION
Combustion & Ventilation Air
Figure 5
Hammer and Screwdriver Used
for Knockout
25-40-06
NOTE: If a knockout does not come out after two sharp blows, pull
and snip as needed to remove the knockout.
For Single Pipe Installation
(Non−Direct Vent)
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning may result in
personal injury or death.
Provide adequate combustion and ventilation air.
Use methods described here to provide
combustion and ventilation air.
Furnaces require ventilation openings to provide sufficient air for
proper combustion and ventilation of flue gases. All duct or
openings for supplying combustion and ventilation air must comply
with National Fuel Gas Code, NFPA54/ANSI Z223.1, 2009 (or
current edition) and applicable provisions of local building codes.
Note: The Combustion & Ventilation Air Section in this document,
uses tables and information from the ANSI Z223.1/NFPA
54. For use in Canada, use CSA B149.1 for this information.
1.Section 9.3, Air for Combustion and Ventilation, of the
National Fuel Gas Code, National Fuel Gas Code (NFGC),
ANSI Z223.1/NFPA 54−2009 in the U.S.,
2.Sections 8.2, 8.3, 8.5, 8.6, 8.7, and 8.8 of National Standard of
Canada, Natural Gas and Propane Installation Code
(NSCNGPIC), CSA B149.1−05 in Canada,
3.Applicable provisions of the local building code.
This furnace can NOT be common vented or connected to any type
B, BW or L vent or vent connector, nor to any portion of a
factory−built or masonry chimney. Multistory venting is NOT
permitted. If this furnace is replacing a previously common-vented
furnace, it may be necessary to resize the existing vent and
chimney to prevent oversizing problems for the other remaining
appliance(s). See “Venting and Combustion Air Check” in this
section. This furnace MUST be vented to the outside.
When the installation is complete, check that all appliances have
adequate combustion air and are venting properly. See VentingAnd Combustion Air Check in “Gas Vent Installation” Section in this
manual.
WARNING
Outdoor Combustion Air Method
A space having less than 50 cubic feet per 1,000 BTUH (4.8 cubic
meters per kW) input rating for all gas appliances installed in the
space requires outdoor air for combustion and ventilation.
Air Openings and Connecting Ducts
1. Total input rating for all non direct vent gas appliances
MUST be considered when determining free area of
openings.
2. Connect ducts or openings directly to outside.
3. When screens are used to cover openings, they MUST be
no less than
4. The minimum dimension of rectangular air ducts MUSTNOT be less than 3″ (76.2mm).
5. When sizing grille or louver, use the free area of opening. If
free area is NOT stamped or marked on grill or louver,
assume a 20% free area for wood and 60% for metal.
1
/4″ (6.4mm) mesh.
Confined Space Installation
NOTE: A confined space is defined as an area with less than 50
cubic feet per 1,000 BTUH (4.8 cubic meters per kW) input rating
for all gas appliances installed in the area.
Requirements
1. Provide confined space with sufficient air for proper
combustion and ventilation of flue gases using horizontal or
vertical ducts or openings.
2. Figure 6 illustrate how to provide combustion and
ventilation air. A minimum of two permanent openings, one
inlet and one outlet, are required.
a.One opening MUST commence within 12″ (304.8mm) of
the floor and the second opening MUST commence
within 12″ (304.8mm) of the ceiling.
b.Size openings and ducts per Table 1.
c.Horizontal duct openings require 1 square inch of free
area per 2,000 BTUH (11 cm2/kW) of combined input for
all gas appliances in the space (see Table 1).
d.Vertical duct openings or openings directly
communicating with the outdoors require 1 square inch
of free area per 4,000 BTUH (5.5 cm2/kW) for combined
input of all gas appliances in the space (see Table 1).
440 01 2024 04
Specifications are subject to change without notice.
11
Figure 6
Outside Air (This is ONLY a guide. Subject to codes of country having jurisdiction.)
This installation NOT approved in Canada
Gable Vent
Gas Vent
Ventilated Attic
Top Above Insulation
Outlet Air (1)
Ventilated Crawl Space
Alternate Inlet Air (1)
Alternate Inlet Air (1)
Soffit Vent
Inlet
Air (1)
Gas Vent
Ventilated Attic
Top Above Insulation
OutletAir (1)
3. One opening MUST be within 12″ (304.8mm) of the floor
and the second opening within 12″ (304.8mm) of the ceiling.
a.1 sq. in of free area per 3,000 BTUH (7 cm
2
/kW) for
combined input of all gas appliances in the space (see
Table 1) and
b. not less than the sum of the areas of all vent connectors
in the space.
The opening shall commence within 12″ (304.8mm) of the top of
the enclosure. Appliances shall have clearances of at least 1″
(25.4mm) from the sides and back and 6″ (152.4mm) from the
front. The opening shall directly communicate with the outdoors or
shall communicate through a vertical or horizontal duct to the
outdoors or spaces (crawl or attic) that freely communicate with the
outdoors.
4. Size openings and ducts per Table 1.
a.Indoor openings that comply with the Indoor
Combustion Air Method below and
b.Outdoor openings located as required in the Outdoor
Combustion Air Method above and
Gas Vent
Gable Vent
Soffit Vent
Inlet
Air (2)
Outlet
Air (1)
Inlet
Air (1)
Minimum One Inlet and One Outlet Air Supply is Required
May be in any Combination Shown
Inlet Air Opening Must be Within12″ (304.8mm) of floor
Outlet Air Opening Must be Within12″ (304.8mm) of ceiling
(1) 1 Square Inch per 4000 BTUH
(2) 1 Square Inch per 2000 BTUH
Inlet
Air (2)
Outlet
Air (2)
c.Outdoor openings sized as follows.
1) Calculate the Ratio of all Indoor Space volume
divided by required volume for Indoor CombustionAir Method.
2) Outdoor opening size reduction Factor is 1 minus
the Ratio in 1) above.
3) Minimum size of Outdoor openings shall be the size
required in Outdoor Combustion Air Method
above multiplied by reduction Factor.
5. Horizontal duct openings require 1 square inch of free area
per 2,000 BTUH of combined input for all gas appliances in
area (see Table 1).
6. Vertical duct openings or openings directly to outside
require 1 square inch of free area per 4,000 BTUH (5.5
2
/kW) for combined input of all gas appliances in area
cm
(see Table 1).
Table 1
BTUH (kW)
Input Rating
40,000 (11.72)20 sq. in. (129 cm2)13.34 sq. in. (86 cm2)10 sq. in. (65 cm2)4″ (101.6mm)
50,000 (14.65)25 sq. in. (161 cm2)16.7 sq. in. (108 cm2)12.5 sq. in. (81 cm2)4″ (101.6mm)
60,000 (17.58)30 sq. in. (194 cm2)20 sq. in. (129 cm2)15 sq. in. (97 cm2)5″(127mm)
75,000 (21.98)37.5 sq. in. (242 cm2)25 sq. in. (161 cm2)18.75 sq. in. (121 cm2)5″(127mm)
80,000 (23.45) 40 sq. in. (258 cm2)26.7 sq. in. (172 cm2)20 sq. in. (129 cm2)5″(127mm)
100,000 (29.31) 50 sq. in. (322 cm2)33.3 sq. in. (215 cm2)25 sq. in. (161 cm2)6″(152.4mm)
125,000 (36.63)62.50 sq. in. (403 cm2)41.7 sq. in. (269 cm2)31.25 sq. in. (202 cm2)7″ (177.8mm)
EXAMPLE: Determining Free Area
Furnace
100,000
29.31
Furnace
100,000
29.31
Free Area
Two Horizontal Ducts
BTUH (kW)
sq. in./2,000(1 cm2/.09)
Water Heater
+
+
30,000
8.8
Water Heater
30,000
8.8
12
Minimum Free Area Required for Each Opening or Duct to Outdoors
Single Opening
BTUH (kW)
sq. in./3,000 (1 cm2/.135)
Total Input
=
=
(130,000 ÷ 4,000)
(38.11 ÷ .18)
Total Input
(130,000 ÷ 2,000)
(38.11 ÷ .09)
Specifications are subject to change without notice.
Two Vertical Ducts or Openings
=32.5 Sq. In. Vertical
=210 cm2 Vertical
=65 Sq. In. Horizontal
=423 cm2 Horizontal
BTUH (kW)
sq. in./4,000(1 cm2/.18)
Round Duct
BTUH (kW)
sq. in./4,000(6.5cm2/.18)
440 01 2024 04
Indoor Combustion Air (Unconfined Space)
Standard and Known-Air-Infiltration Rate Methods
NFPA & AGA
Indoor air is permitted for combustion and ventilation, if the
Standard or Known−Air−Infiltration Rate Method is used.
!
CARBON MONOXIDE POISONING HAZARD
Failure to this warning could result in personal
injury or death.
Most homes will require additional air from
outdoors for combustion and ventilation. A space
with at least 50 cubic feet per 1,000 BTUH (4.8 cubic
meters per kW) input rating or homes with tight
construction may need outdoor air, supplied
through ducts, to supplement air infiltration for
proper combustion and ventilation of flue gases.
The Standard Method may be used, if the space has no less
volume than 50 cubic feet per 1,000 BTUH (4.8 cubic meters per
kW) of the maximum input ratings for all gas appliances installed in
the space. The standard method permits indoor air to be used for
combustion and ventilation air.
The Known Air Infiltration Rate Method shall be used if the
infiltration rate is known to be less than 0.40 air changes per hour
Table 2 Minimum Space Volumes were determined by using the
following equations from the National Fuel Gas Code ANSI
Z223.1/NFPA 54−2009, 9.3.2.2:
1.For appliances other than fan−assisted appliances (such
as a draft hood−equipped water heater), calculate using the
following equation:
Required Vol ume
Required Vol ume
WARNING
MINIMUM SPACE VOLUME FOR 100% COMBUSTION AND VENTILATION AIR FROM INDOORS
Other Than Fan-Assisted TotalFan-assisted Total
30,000 BTU
(8,790 kW)
other
other
21 ft
ACH
59 m
ACH
40,000 BTU
(11,720 kW)
3
(
3
(
I
other
1000 BTUH
I
other
.293 kW
50,000 BTU
(14,650 kW)
)
)
(ACH) and equal to or greater than 0.10 ACH. Infiltration rates
greater than 0.60 ACH shall not be used. The minimum required
volume of the space varies with the number of ACH and shall be
determined per Table 2 or Equations 1 and 2. Determine the
minimum required volume for each appliance in the space, and
add the volumes together to get the total minimum required
volume for the space.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in
personal injury or death.
An unconfined space or homes with tight
construction may not have adequate air infiltration
for proper combustion and ventilation of flue gases.
Most homes will require additional air.
The Known Air Infiltration Rate Method shall be used if the
infiltration rate is known to be less than 0.40 air changes per hour
(ACH) and equal to or greater than 0.10 ACH. Infiltration rates
greater than 0.60 ACH shall not be used. The minimum required
volume of the space varies with the number of ACH and shall be
determined per Table 2 or Equations 1 and 2. Determine the
minimum required volume for each appliance in the space, and
add the volumes together to get the total minimum required
volume for the space.
50,000 BTU
(14,650 kW)
3
3
ft
(m
)
2.For fan−assisted appliances (such as this furnace),
calculate using the following equation:
Required Vol ume
Required Vol ume
where:
I
= all appliances other than fan−assisted input in BTUH
other
= fan−assisted appliance input in BTUH
I
fan
ACH = air change per hour (percent of volume of space
exchanged per hour, expressed as a decimal)
75,000
(21,975 kW)
fan
fan
100,000 BTU
(29,300 kW)
3
15 ft
ACH
3
.42 m
ACH
(
(
I
1000 BTUH
I
.293 kW
125,000 BTU
(36,625 kW)
fan
fan
)
)
440 01 2024 04
Specifications are subject to change without notice.
13
The following requirements apply to the Standard Method and to
the Known Air Infiltration Rate Method.
•Adjoining rooms can be considered part of a space, if there
are no closable doors between rooms.
•An attic or crawl space may be considered a space that freely
communicates with the outdoors provided there are adequate
ventilation openings directly to outdoors. Openings MUST
remain open and NOT have any means of being closed off.
Ventilation openings to outdoors MUST be at least 1 square
inch of free area per 4,000 BTUH (5.5 cm
rating for all gas appliances in the space.
•Combining spaces on the same floor level. Each opening
shall have a free area of at least 1 in
2
/kW) of the total input rating of all gas appliances in the
(22cm
space, but not less than 100 in
commence within 12″ (304.8 mm) of the top and one opening
shall commence within 12″ (304.8mm) of the bottom of the
enclosure. The minimum dimension of air openings shall be at
least 3″ (76.2 mm).
2
(645 cm2). One opening shall
2
/kW) of total input
2
/1,000 BTUH
•Combining spaces on different floor levels. The volumes of
spaces on different floor levels shall be considered
communicating spaces if connected by one or more
permanent openings in doors or floors having a free area of at
least 2 in2/1,000 Btuh (44 cm2/kW) of total input rating of all
gas appliances.
•In spaces that use the Indoor Combustion Air Method,
infiltration should be adequate to provide air for combustion,
ventilation and dilution of flue gases. However, in buildings
with unusually tight construction, additional air MUST be
provided using the methods described in section titled
Outdoor Combustion Air Method:
•Unusually tight construction is defined as Construction with
1.Walls and ceilings exposed to the outdoors have a
continuous, sealed vapor barrier. Openings are
gasketed or sealed and
2.Doors and openable windows are weather stripped and
3.Other openings are caulked or sealed. These include
joints around window and door frames, between sole
plates and floors, between wall−ceiling joints, between
wall panels, at penetrations for plumbing, electrical and
gas lines, etc.
Ventilation Air
Some provincial codes and local municipalities require ventilation
or make−up air be brought into the conditioned space as
replacement air. Whichever method is used, the mixed return air
temperature across the heat exchanger MUST not fall below 60°
so that flue gases will not condense excessively in the heat
exchanger. Excessive condensation will shorten the life of the heat
exchanger and possibly void your warranty.
Venting and Combustion Air Check
NOTE: If this installation replaces an existing furnace from a
commonly vented system, the original venting system may no
longer be sized to properly vent the attached appliances. An
improperly sized venting system may cause the formation of
condensate in the vent and the leakage or spillage of vent gases.
To make sure there is adequate combustion air for all appliances,
MAKE THE FOLLOWING CHECK.
Figure 7
Vent Pipe
Typical Gas
Water Heater
If flame pulls towards draft hood, this indicates
sufficient venting.
The following information is supplied to allow the installer to make
adjustments to the setup of existing appliances, IF REQUIRED,
based on good trade practices, local codes, and good judgement
of the installer. Manufacturer does NOT take responsibility for
modifications made to existing equipment.
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow the steps outlined below for each
appliance connected to the venting system being placed
into operation, could result in carbon monoxide
poisoning or death:
The following steps shall be followed for each appliance
connected to the venting system being placed into
operation, while all other appliances connected to the
venting system are not in operation:
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and horizontal
pitch, as required in the National Fuel Gas Code, ANSI
Z223.1/NFPA 54 or CSA B149.1, Natural Gas and Propane Installation Code and these instructions. Determine
that there is no blockage or restriction, leakage, corrosion
and other deficiencies which could cause an unsafe condition.
3. As far as practical, close all building doors and windows
and all doors between the space in which the appliance(s)
connected to the venting system are located and other
spaces of the building.
4. Close fireplace dampers.
5. Turn on clothes dryers and any appliance not connected
to the venting system. Turn on any exhaust fans, such as
range hoods and bathroom exhausts, so they are operating at maximum speed. Do not operate a summer exhaust
fan.
6. Follow the lighting instructions. Place the appliance being
inspected into operation. Adjust the thermostat so appliance is operating continuously.
7. Test for spillage from draft hood equipped appliances at
the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle.
(Figure 7)
8. If improper venting is observed, during any of the above
tests, the venting system must be corrected in accordance with the National Fuel Gas Code, ANSI
Z223.1/NFPA 54 and/or CSA B149.1, Natural Gas and
Propane Installation Code.
9. After it has been determined that each appliance connected to the venting system properly vents when tested
as outlined above, return doors, windows, exhaust fans,
fireplace dampers and any other gas−fired burning appliance to their previous conditions of use.
Vent Check
Draft Hood
Match
WARNING
14
Specifications are subject to change without notice.
440 01 2024 04
For Two Pipe Installation
(Direct Vent)
This furnace can NOT be common vented or connected to any type
B, BW or L vent or vent connector, nor to any portion of a
Vent and Combustion Air Piping
factory−built or masonry chimney. If this furnace is replacing a
previously common-vented furnace, it may be necessary to resize
the existing vent and chimney to prevent oversizing problems for
the other remaining appliance(s). See “Venting and CombustionAir Check” in this section. This furnace MUST be vented to the
outside.
!
WARNING
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in
personal injury or death.
Use methods described here to provide combustion
and ventilation air.
Dual Certified (*9MPT, *9MPV, *9MVX Models)
Direct or Non-Direct Vent
This furnace is certified as a Category IV furnace. This furnace can
be installed as a direct vent furnace using outside air for
combustion or the furnace can use air from inside the structure for
combustion. The INLET air pipe is optional. If combustion air
comes from inside the structure, adequate make up air MUST be
provided to compensate for oxygen burned. See Confined SpaceInstallation in the Combustion and Ventilation Air chapter. If
combustion air is drawn from outside the structure, it MUST be
taken from the same atmospheric pressure zone as the vent pipe.
Contaminated Combustion Air
Installations in certain areas or types of structures will increase the
exposure to chemicals or halogens that may harm the furnace.
The following areas or types of structures may contain or have
exposure to the substances listed below. The installation must be
evaluated carefully as it may be necessary to provide outside air for
combustion.
• Commercial buildings.
• Buildings with indoor pools.
• Furnaces installed in laundry rooms.
• Furnaces installed in hobby or craft rooms.
• Furnaces installed near chemical storage areas.
• Permanent wave solutions for hair.
• Chlorinated waxes and cleaners.
• Chlorine based swimming pool chemicals.
• Water softening chemicals.
• De−icing salts or chemicals.
• Carbon tetrachloride.
• Halogen type refrigerants.
• Cleaning solvents (such as perchloroethylene).
• Printing inks, paint removers, varnishes, etc.
• Hydrochloric acid.
• Sulfuric Acid.
• Solvent cements and glues.
• Antistatic fabric softeners for clothes dryers.
• Masonry acid washing materials.
440 01 2024 04
Specifications are subject to change without notice.
Vent and Combustion Air Piping Guidelines
This furnace is approved for venting with Schedule 40 PVC, CPVC,
ABS fittings, and Cellular Core and SDR−26 PVC pipe.
Applicable ASTM Standards for Vent Materials
Materials
ABSD1527__F628
PVCD1785D2241F891
CPVCF441F442−−F438−−F493
ABS to
PVC
NOTE: 1) In Canada, all pipe, fittings & cements must
conform to applicable CSA standards or to local codes having
jurisdiction.
with the specific venting material.
solvent cement that meets the requirements of ASTM D3138.
use for cementing plastic pipe and fittings.
NOTE: In order to create a seal that allows future removal of pipe,
RTV sealant MUST be used on the inlet pipe where it joins to the
furnace.
NOTE: All vent piping MUST be installed in compliance with local
codes or ordinances, these instructions, good trade practices, and
codes of country having jurisdiction.
1. Determine the best routing and termination for the vent pipe
2. Determine the size required for the vent pipe and air inlet
3. Loosely assemble all venting parts without adhesive (pipe
4. Furnace shall be installed so as to prevent the accumulation
5. Use of vertical piping is preferred because there will be
6. The vertical vent pipe MUST be supported so that no weight
7. Exhaust vent piping or air inlet piping diameter MUST NOT
8. All exhaust vent piping from the furnace to termination
9. Use DWV type long radius elbows whenever possible, as
Sch. 40
Pipe
−−−−−−−−−−D3138
2) Only use solvent cements that are marked for use
3) ABS to PVC transition joints REQUIRE a special
4) Refer to ASTM D2855 for general procedure to
and air inlet pipe by referring to all of the instructions and
guidelines in this Section.
pipe.
joint cement) for correct fit before final assembly.
of condensate.
some moisture in the flue gases that may condense as it
leaves the vent pipe (See Instructions For HorizontalVents).
is allowed to rest on the combustion blower.
be reduced.
MUST slope upwards. A minimum of
(304.8mm) of run is required to properly return condensate
to the furnace drain system.
they provide for the minimum slope on horizontal runs and
they provide less resistance in the vent system. If DWV
elbows cannot be used, use two, 45° elbows when possible.
On horizontal runs the elbows can be slightly misaligned to
provide the correct slope.
SDR
Pipe
Cell
Core
Pipe
FittingsPrimer
D2468
&
D2661
D2466
&
D2665
−−D2235
F656D2564
1
/4″ (6.4mm) per foot
Solv.
Cement
15
10. All horizontal pipe runs MUST be supported at least
every five feet with galvanized strap or other rust
resistant material. NO sags or dips are permitted.
11. All vertical pipe runs MUST be supported every six feet
(1.8m) where accessible.
12. The maximum pipe length is 40′ (12.2m) total in the inlet or
outlet side of the system. Up to five, 90° elbows can be used
on the inlet or the outlet. With the Concentric Vent
Termination Kits (NAHA001CV or NAHA002CV), the
maximum pipe length is 35′ (10.7m) with four 90° elbows. If
more elbows are required, reduce the length of both the inlet
and exhaust pipes 5′ (1.5m) for each additional elbow used.
(See Table 3 or Table 4).
13. The minimum vent length is 5′ (1.5m) of PVC.
14. The piping can be run in the same chase or adjacent to
supply or vent pipe for water supply or waste plumbing. It
can also be run in the same chase with a vent from another
90+ furnace.
NOTE: In NO case can the piping be run in a chase where
temperatures can exceed 140° F (60° C). or where radiated
heat from adjacent surfaces would exceed 140° F(60° C).
15. The vent outlet MUST be installed to terminate in the same
atmospheric pressure zone as the combustion air inlet.
16. The vent system can be installed in an existing unused
chimney provided that:
•Both the exhaust vent and air intake run the length of the
chimney.
•No other gas fired appliance or fireplace (solid fuel) is
vented into the chimney.
•The top of the chimney MUST be sealed flush or crowned
up to seal against rain or melting snow so ONLY the piping
protrudes.
•The termination clearances shown in Figure 8 are
maintained.
17. Furnace applications with vertical vents requiring vent
diameter increaser fittings must have increaser fittings
installed in vertical portion of the vent. Condensate will be
trapped in the vent if the vent diameter is increased prior to
having an elbow turned upward. This could cause nuisance
tripping of the pressure switch.
Combustion Air and Vent Piping Insulation
Guidelines
NOTE: Use closed cell, neoprene insulation or equivalent. If
Fiberglass or equivalent insulation is used it must have a vapor
barrier. Use R values of 7 up to 10′ (3.1m), R−11 if exposure
exceeds 10′ (3.1m). If Fiberglass insulation is used, exterior to the
structure, the pipe MUST be boxed in and sealed against moisture.
1. When the vent or combustion air pipe height above the roof
exceeds 30″ (76.2mm), or if an exterior vertical riser is used
on a horizontal vent to get above snow levels, the exterior
portion MUST be insulated.
2. When combustion air inlet piping is installed above a
suspended ceiling, the pipe MUST be insulated with
moisture resistant insulation such as Armaflex or other
equivalent type of insulation.
3. Insulate combustion air inlet piping when run in warm,
humid spaces.
Sizing Combustion Air and Vent Pipe
Consult Table 3 or Table 4 to select the proper diameter exhaust
and combustion air piping. Exhaust and combustion air piping is
sized for each furnace Btuh size based on total lineal vent length
(on inlet or outlet side), and number of 90° elbows required.
1. Double Pipe Installation−If installing as a direct−vent
appliance, consult Table 4 to select the proper diameter
exhaust and combustion air piping. Exhaust and
combustion air piping is sized for each furnace Btuh size
based on total lineal vent length (on inlet or outlet side), and
number of 90° elbows required.
2. Single Pipe Installation−If installing as a non−direct vent
appliance, (single outlet pipe and no inlet pipe) refer to
Table 3. The table shows the maximum number of elbows
allowed with any given pipe diameter and length of run.
3. Use of Elbows−Two 45° elbows can be substituted for one
90° elbow. The elbow or elbows used for vent termination
outside the structure ARE counted, including elbows
needed to bring termination above expected snow levels.
The minimum vent length is 5 (1.5m) of PVC. Elbows are
DWV Long Radius Type for 2
vents.
If more than five elbows are required, reduce the length of both
the inlet and exhaust pipes 5′ (1.5m) for each additional elbow
used. If less than five elbow are required, the length can be
INCREASED by 5′ (1.5m) for each additional elbow NOT used.
NOTE: It is allowable to use larger diameter pipe and fitting thanshown in the tables but not smaller diameters than shown.
The minimum vent length is 5 (1.5m) of PVC. Elbows are
DWV Long Radius Type for 2
vents.
If more than five elbows are required, reduce the length of both
the inlet and exhaust pipes 5′ (1.5m) for each additional elbow
used. If less than five elbow are required, the length can be
INCREASED by 5′ (1.5m) for each additional elbow NOT used.
* Feet (meters) of pipe is whichever pipe run is the longest,
either inlet or outlet side.
For concentric vent pipe diameter see Concentric
Termination tables in this manual.
Pipe Diameter Table
Single Piping ONLY
125,000 Btuh Furnace
″ (50.8mm) and 3″ (76.2mm)
Pipe Diameter Table
Dual Piping ONLY
125,000 Btuh Furnace
″ (50.8mm) and 3″ (76.2mm)
Vent Termination Clearances
!
CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in death
personal injury or death.
Inlet and outlet pipes may NOT be vented directly
above each other.
1. Determine termination locations based on clearances
specified in following steps and as shown in Figure 8,
Figure 9, Figure 22, through Figure 30.
For concentric vent termination clearances, refer to
Concentric Termination Kit instructions.
2. This furnace is Dual Certified and can be installed as a
single pipe appliance (all combustion from inside the
structure) or as a direct vent appliance where all
combustion air is taken from outside the structure.
3. For Single Pipe installation refer to Figure 9 for vent
termination clearances.
4. For Direct Vent installation, refer to Figure 8 for vent
termination.
WARNING
16
Specifications are subject to change without notice.
AClearance above grade, veranda, porch, deck, balcony, or
anticipated snow level
BClearance to a window or door that may be opened12″ (30 cm) for appliances u 10,000 Btuh (3 kW) and v
CClearance to a permanently closed window
DVertical clearance to a ventilated soffit located above the
terminal within a horizontal distance of 2′ (61cm) from the
centerline of the terminal
EClearance to an unventilated soffit
FClearance to an outside corner
GClearance to an inside corner
HClearance to each side of the centerline extended above
electrical meter or gas service regulator assembly
IClearance to service regulator vent outlet3′ (91 cm)
JClearance to non-mechanical air supply inlet to building or
the combustion air inlet to any other appliance
KClearance to a mechanical air supply inlet6′ (1.83 m)3′ (91 cm) above if within 10′ (3m) horizontally
LClearance under a veranda, porch, deck, or balcony12″ (30 cm) +
MClearance to each side of the centerline extended above or
below vent terminal of the furnace to a dryer or water heater
vent, or other appliance's direct vent intake or exhaust.
NClearance to the vent terminal of a dryer vent, water heater
vent, or other appliances direct vent intake or exhaust.
OClearance from a plumbing vent stack3′ (91 cm)3′ (91 cm)
PClearance above a paved sidewalk or paved driveway lo
cated on public property.
u greater than, w greater than or equal to, t less than, v less than or equal to
(1.) In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code
(2.) In accordance with the current ANSI Z223.1/NFPA 54, National Fuel Gas Code
# 18″ (46 cm) above roof surface
+ Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.
* For clearances not specified in ANSI Z223.1/NFPA 54 or CSA B149.1, clearances shall be in accordance with local installation codes and
the requirements of the gas supplier and the manufacture's installation instructions.
** A vent shall not terminate directly above a sidewalk or paved driveway that is located between two single family dwellings and serves both dwellings.
Notes:
1. The vent for this appliance shall not terminate
a. Over public walkways; or
b. Near soffit vents or crawl space vents or other areas where condensate or vapor could create a nuisance or hazard or property damage; or
c. Where condensate vapor could cause damage or could be detrimental to the operation of regulators, relief valves, or other equipment.
2. When locating vent terminations, consideration must be given to prevailing winds, location, and other conditions which may cause recirculation of the combustion products of adjacent vents.
Recirculation can cause poor combustion, inlet condensate problems, and accelerated corrosion of the heat exchangers.
3. Avoid venting under a deck or large overhang. Recirculation could occur and cause performance or system problems.
12″ (30cm) #12″ (30 cm)
100,000 Btuh (30 kW), 36″ (91 cm) for appliances u 100,000
Btuh (30 kW)
9″ (23 cm) for appliances u 10,000 Btuh (3 kW) and v 50,000
Btuh (14.7 kW), 12″ (30 cm) for appliances u 50,000 Btuh (14.7
kW)
**
**
**
**
**
3′ (91 cm) within 15′ (4.5 m) above the meter/regulator
assembly
*
*
12″ (30 cm) for appliances u 10,000 Btuh (3 kW) and v
100,000 Btuh (30 kW), 36″ (91 cm) for appliances u 100,000
Btuh (30 kW)
9″ (23 cm) for appliances u 10,000 Btuh (3 kW) and v 50,000
Btuh (15 kW), 12″ (30 cm) for appliances u 50,000 Btuh (14.7
kW)
*
12″ (30 cm)12″ (30 cm)
3′ (91 cm)3′ (91 cm)
7′ (2.13 m) **
*
U.S. Installation (2)
440 01 2024 04
Specifications are subject to change without notice.
17
Loading...
+ 38 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.