Interlogix TVP-6103 Installation Instructions

TVP-SAM TruVision PTZ Swing Arm Mount
1. Collar
conduit)
7. Junction box cover
Installation Instructions

Introduction

These instructions help you to install the mounting accessory that you are using with your Interlogix PTZ. Complete these instructions first, then return to the PTZ installation manual to finish installing the PTZ.
The swing arm mount is used to mount a PTZ to a roof parapet. It swings the PTZ out from a building and in above a roof for a broader range of surveillance coverage and safer,
easier servicing.
Figure 1: Mount positions out from a building and in above a roof
2. Swing arm
3. Mounting plate (fasteners not provided)
4. Mounting socket
5. Safety U bracket
6. Chase nipple (0.75 in.
(fasteners provided)
8. Pivot locking screws
9. Junction box (fasteners provided)
10. Gasket

Product contents

The swing arm
Mounting plate (fasteners not provided)
Safety U bracket
Junction box (fasteners provided)
Chase nipple (3/4 in. conduit)
Gasket
Junction box cover (fasteners provided)

Installation

Installation involves installing the mounting plate, installing the swing arm, feeding the interconnect cables through the mount, and installing the junction box.
Figure 2: Package contents
Caution: For all installations, heed these cautions:
Complete all installation steps before supplying power to the PTZ.
To ensure proper operation of a PTZ, install the mount level.
For safety, the mounting surface, hardware, and procedure used for securing the PTZ must support the weight of the PTZ, mount, cables, and any structural or environmental vibration according to local codes.

Installing the mounting plate

1. Remove the junction box from the mounting plate (Figure 2 above).
2. Using the mounting plate as a template, place it level
against the mounting surface and mark the position of the mounting holes (Figure 3 on page 2). Use all six mounting holes, if extra support is needed for your installation.
© 2018 United Technologies Corporation. P/N 1053528-EN • REV A • ISS 16JUL18 Interlogix is part of UTC Climate, Controls & Security, a unit of United Technologies Corporation. All rights reserved.
Figure 3: Marking the mounting holes
1. Middle holes are for extra support.
1. Pivot locking screws
2. Following all local codes, drill and prepare the mounting
holes.
3. Orient the mounting plate such that the socket is up and the junction box is down (Figure 1 on page 1).
4. Securely fasten the mounting plate to the mounting
surface with the appropriate fasteners. Before installing anchors into the middle holes, place the safety U bracket on top of the mounting socket, aligning the holes in the safety U bracket with the middle holes on the mounting
plate.
5. If needed, seal all mounting holes so that no moisture can leak into the mounting surface.

Installing the swing arm

See Figure 4 below and do the following:
1. Slide the swing arm down into the mounting socket of the mounting plate.
2. Position the arm such that the collar is accessible from the rooftop for mounting the housing.
3. Temporarily tighten the pivot locking screws on the arm, while you continue installing the mount.
Figure 4: Installing the swing arm

Installing the interconnect cables and junction box

1. Feed the interconnect cables through the junction box, the chase nipple of the junction box, and up through the swing arm (Figure 5 on page 3).
Pull enough extra cable to make connections. You
can always cut off unneeded length later.
Do not terminate the cables yet. Otherwise, they will
not fit through the dust seal of the housing.
2. Ensure that the parallel sides of the chase nipple are aligned with the front and back of the top of the junction box (Figure 5 on page 3). Otherwise, the chase nipple may catch on the lower lip of the mounting socket.
2 / 3 P/N 1053528-EN • REV A • ISS 16JUL18
Loading...
+ 1 hidden pages