Interion 240224EBL User Manual

OFFICE PARTITIONS
Power Box Opening
Assembly Instructions1-800-645-2986
Rear View
N
STEP 1
Remove opening blanks on raceway cover for power and data. If panel contains no electric or data and is used as a pass-thru, leave opening blanks in place.
O
Rear view
Data Port Openings
Front View
STEP 2
Insert data ports and data cables before installing raceway cover. (Phone connectors, data connectors and cables not included.) Removable, hinged raceway cover allows easy access to receptacles and cables
Use twist ties or zip ties to fasten cables under panels as needed.
P
Notch
Use cable tie bracket to dress data cables under panels.
TIP
Push or pull magnetic tabs in or out
for a better fit. Adjust as needed.
Rear
Panel
Lip
Notch
Lip
Notch
Place notches in raceway
STEP 1
cover over the lips
located on raceway leg.
12
Lip
STEP 2
Swing panel upward until
magnet snaps into place.
Adjust accordingly.
globalindustrial.com
Customer Service
1
2
IG
4
1-800-645-2986
Assembly
Instructions
Office Partitions With Electric
ASSEMBLY
• Configurations require the corresponding steps needed for proper assembly.
• Attach appropriate brackets or legs on the ends of the panels as needed.
• Do not attach bolts or brackets into the outermost edge of a panel that will be last in line.
• Starter panel should use a corner, 3-way, 4-way, or wall bracket.
• Insert bolt cap into unused threaded insert to finish your project.
• Level each panel as you go along.
HARDWARE
H1 H2
H9 H10
H3 H4
Straight Connector 3-way ConnectorWall Bracket Corner Connector 4-way Connector
H11 H12
Adjust all levelers to
approximately 1-1/4”
WARNING
In order to prevent structural failure, instability, tip­over, and/or serious injury, please follow instructions carefully.
• Use only the instructions, parts and hardware included
• Maximum span for connected panels without support is 12 feet
• Do not move panels while they are connected together
• Maximum span for connected panels using overhead cabinets or shelves without support is 12 feet
• Consult licensed electrician for proper installation
H5
H13
12’
12’
Overhead
Cabinets
H6 H8
Bracket
H14 H15
12’
12’
Overhead
Shelves
90˚ Connector
H16 H17
H22 H23
H29 H30
Extended/Corner
Cable
Circuit Tool Circuit 3 (IG) Circuit 4 Blank
H36 H37
Screw Toggle BoltT-Bracket Straight Extension Hex Bolt
H18
Aluminum PlatePanel Filler Post Bolt Cap Screw
H24 H25
Raceway Cover 72” Starter Cable60” Power Box Panel Raceway 144” Starter Cable
H31 H32
Circuit 1 Circuit 2
H19
H26
H33
H38
Threaded Stud
Panel Filler Cap
H20 H21
36” Power Box
48” Power Box
H27 H28
20 AMP Plug 15 AMP Plug
H34 H35
3-Way CapEnd Cap Corner Cap
1
1-800-645-2986
Assembly Instructions
OFFICE PARTITIONS
Go To
“A”
Go To
“D”
Go To
“B”
Go To
“E”
Go To
“C”
Go To
“F”
Go To
“G”
Go To
“I”
Go To
“H”
2
OFFICE PARTITIONS
Assembly Instructions1-800-645-2986
I
STEP 2
Attach raceway
to bottom of
panels. Add feet
and bottom
bracket.
STEP 1
Remove feet from panel.
Attach connectors to
top and bottom.
STEP 3
Attach aluminum
plate(s) to bottom
of raceway.
P1
H18
STEP 4
Insert panel studs.
P2
H14
H13
H9
STEP 5
Loosely attach
top bolts
P3
P1
P2
H13
P3
H9
H16
H19
STEP 6
Insert panel filler caps
into panel filler post
top and bottom
H9
H15
P1
P3
P2
H11
STEP 7
Insert post into bottom bracket
first. Fit panel studs into bottom
bracket then attach bracket to
panel 2. Tighten bolts.
H4 H9 H11 H13 H14 H15 H16 H18 H19
(2) (1) (2) (12) (4) (2) (1) (3/6)* (6/12)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
Align panel 1 to bracket
and screw in self tapping
screws and washers H11
9
STEP 8
into side of panel 1.
H16
H - Right
Remove feet from panel.
bottom of panels. Add
feet and bottom bracket.
aluminum plate(s) to
of raceway.
STEP 1
Attach connectors to
top and bottom.
STEP 2
Attach raceway to
H13
STEP 3
Attach
bottom
H18
H19
STEP 4
Insert panel
H7
studs.
OFFICE PARTITIONS
H16
P1
STEP 5
Loosely
attach top
H14
bolts.
Align panel to
bracket and screw
in using 2 self
tapping screws
and washers (H11)
until tight (do not
overtighten).
P2
STEP 7
Assembly Instructions1-800-645-2986
H15
P1
STEP 6
Insert panel filler caps into panel filler post top and bottom. Insert post into bottom bracket first, then into top bracket. Then tighten all bolts firmly
H11
P2
H - Left
Remove feet from panel.
bottom of panels. Add
feet and bottom bracket.
aluminum plate(s) to
of raceway.
STEP 1
Attach connectors to
top and bottom.
STEP 2
Attach raceway to
H13
STEP 3
Attach
bottom
H18
H19
H7
P2
P1
STEP 4
Insert panel
studs.
H14
P1
H16
STEP 5
Loosely attach
top bolts.
H15
P2
STEP 6
Insert panel filler caps into panel filler post top and bottom. Insert post into bottom bracket first, then into top bracket. Then tighten all bolts firmly
H11
P1
P2
H2 H7 H11 H13 H14 H15 H16 H18 H19
(1) (2) (2) (8) (2) (2) (1) (2/4)* (4/8)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
8
STEP 7
Align panel to bracket and
screw in using 2 self tapping
screws and washers (H11) until
tight (do not overtighten).
OFFICE PARTITIONS
Assembly Instructions1-800-645-2986
H13
A
Remove feet from panel.
STEP 1
Attach connectors to
top and bottom.
STEP 2
Attach raceway
to bottom of
panel. Add feet
and bottom
bracket.
H1 H13 H18 H19
(2) (6) (1/2)* (2/4)*
P1
H13
Foam seal may
need to be trimmed
to fit panel.
Note: Hardware to anchor wall bracket to wall is not provided.
STEP 3
Attach aluminum
plate(s) to bottom
of raceway.
H18
H19
H1
P1
STEP 4
Attach to wall
STEP 1
B
STEP 2
Attach raceway
to bottom of
panels. Add feet
and bottom
bracket.
Remove feet from panel.
Attach connectors to
top and bottom.
H2
P1
H13
P2
STEP 3
H18
H2 H13 H14 H15 H16 H18 H19
(2) (10) (2) (2) (1) (2/4)* (4/8)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
Attach aluminum
plate(s) to bottom
H19
of raceway.
STEP 4
Insert panel studs.
3
Loosely attach top
H13
H14
STEP 5
bolts.
P2
P2
P1
P1
Insert panel
filler caps into
panel filler post
bottom. Insert
bottom bracket
first, then into
top bracket.
Then tighten all
H16
bolts firmly.
STEP 6
Fit panel
studs into
bottom
bracket,
then loosely
attach to top
bracket.
H15
STEP 7
top and
post into
1-800-645-2986
C
Remove feet from panel.
Attach connectors to
top and bottom.
STEP 2
Attach raceway
to bottom of
panels. Add feet
and bottom
bracket.
STEP 1
OFFICE PARTITIONS
H13
H3
P1
need to be trimmed
H13
STEP 3
Attach aluminum
plate(s) to bottom
of raceway.
Loosely attach
Foam seal may
to fit panel
STEP 4
top bolts
P1
Assembly Instructions
STEP 5
Insert panel
studs
P2
H14
P2
H3 H13 H14 H18 H19
H18
(2) (10) (2) (2/4)* (4/8)*
STEP 1
D
Remove feet from panel.
Attach connectors to
top and bottom.
H13
H19
H4
P1
H13
Foam seal
STEP 2
Attach raceway
to bottom of
panels. Add feet
and bottom
bracket.
STEP 3
Attach aluminum
plate(s) to bottom
of raceway.
H4 H13 H14 H15 H16 H18 H19
(2) (14) (4) (2) (1) (3/6)* (6/12)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
H18
may need to
be trimmed
to fit panel
H19
P2
Fit panel studs into
bottom bracket, then
loosely attach to top
4
Loosely attach
P1
STEP 6
bracket
STEP 6
Fit panel studs into
bottom bracket, then bolt
and tighten top bracket
STEP 4
top bolts
STEP 5
Insert panel
studs
P2 P3
H14
H16
H15
P3
P1
P2
P3
STEP 7
Insert panel filler caps into panel filler post top and bottom. Insert post into
bottom bracket first, then into top
bracket. Then tighten all bolts firmly
1-800-645-2986
Assembly Instructions
OFFICE PARTITIONS
G
Remove feet from panel.
STEP 2
Attach raceway
to bottom of
panels. Add feet
and bottom
bracket.
STEP 7
Assembled panels
P1 and P2.
P1
STEP 1
Attach connectors to
top and bottom.
STEP 3
Attach aluminum
plate(s) to bottom
of raceway.
P2
P3
H13
H8
P1
H18
H13
STEP 9
Bolt on top
bracket H8 to
short panel 3.
H19
STEP 4
Loosely attach
top bolts.
H16
STEP 6
Insert panel filler
caps into filler
post top and
bottom. Insert
post into bottom
bracket. Fit panel
studs into bottom
bracket, then bolt
and tighten top
bracket.
H15
P2
STEP 5
Insert panel
studs.
P2 P3
H14
P2
P1
STEP 10
Drill holes where
marked from
previous Step 5.
H16
P1
P3
STEP 8
Fit panel studs into bottom
bracket first, then mark position
of vertical holes on filler post.
TOGGLE BOLT (H12) ASSEMBLY INTO FILLER POST
31 2
H4 H8 H10 H12 H13 H14 H15 H16 H18 H19
(1) (1) (1) (2) (14) (4) (2) (1) (3/6)* (6/12)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
7
WARNING
DO NOT FORCE DRILL
STEP 11
Follow toggle bolt assembly
diagram.
H8
H16
H12
OFFICE PARTITIONS
Assembly Instructions1-800-645-2986
E
STEP 2
Attach raceway
to bottom of
panels. Add feet
and bottom
bracket.
STEP 1
Remove feet from panel.
Attach connectors to
top and bottom.
STEP 3
Attach aluminum
plate(s) to bottom
of raceway.
H13
P1
H18
H19
H13
H5
Foam seal may
need to be trimmed
to fit panel
STEP 4
Loosely attach
top bolts
STEP 5
Insert panel
studs
P2 P3 P4
H14
STEP 6
Fit panel studs from panel 2 and 3
into bottom bracket on panel 1,
then loosely attach to top bracket
P1
P2
P3
P1
P3
P2
P4
H5 H13 H14 H18 H19
(2) (18) (6) (4/8)* (8/16)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
STEP 7
Fit panel studs into bottom bracket
first, then into top bracket. Then
tighten all bolts.
5
OFFICE PARTITIONS
Assembly Instructions1-800-645-2986
F
STEP 1
Remove feet from
panel. Attach connectors to
top and bottom.
STEP 2
Attach raceway
to bottom of
panel. Add feet
and bottom
bracket.
H3
P1
H13
STEP 3
Attach
aluminum
plate to bottom
of raceway.
STEP 4
Insert panel studs. Foam seal may need
to be trimmed to fit panel
P2
H14
H18
H19
P1
STEP 6
Fit panel studs into
panel bracket.
STEP 5
Bolt and tighten top
bracket H8 onto panel 2.
H8
H13
P2
STEP 6
Align panel to bracket and screw
in using 2 self tapping screws
and washers (H11) until tight
(do not overtighten).
H11
P1
P2
H3 H8 H11 H13 H14 H18 H19
(2) (1) (2) (8) (2) (2/4)* (4/8)*
*1 plate, 2 screws per 36" panel. 2 plates, 4 screws per 48" or 60" panel.
6
OFFICE PARTITIONS
Assembly Instructions1-800-645-2986
J
INSTALLATION OF POWER BOX
WARNING
Fire Risk. Connection to the power source, by a licensed electrician, and quantity of receptacles
used for a given circuit, must be in compliance
with all national and local electrical codes. Failure
to observe this warning could result in a fire.
Risk of electrical shock. Be sure in-feed power
is disconnected to prevent personal injury.
No more than 16 simplex receptacles may be
supplied by one 15 AMP circuit.
No more than 20 simplex receptacles may be
supplied by one 20 AMP circuit.
Electrical connections between panels must
be disconnected prior to removal of a
mechanical connection.
Insert power box to rail under panel. No tools required.
Move power box under panel/raceway and align notches on top of power box(es) with openings on aluminum plate on bottom of raceway. Push up to connect the two parts and move left or right approximately 1 inch until power box feels snug.
H20
Single 36" Panel
Power Box
H21
Double 48" Panel
Power Box
H22
Double 60" Panel
Power Box
1
36” PANEL
CABLE INSTALLATION
L
Push cable into power box until cable
is fully inserted. This will be evident
when the power box latch is
fully engaged and flat against
the cable end. Failure to
ensure the cable is
fully inserted may
result in power
interruption.
48” & 60” PANEL
2
Extended/Corner
Cable
When connecting around a 90° corner or across a 3 way
or 4 way, discard the panel to panel cable and use the
Extended/Corner
Cable
extended/corner cable.
Extended/
Corner
Cable
Cables run between panels as needed
Panel 1 Panel 2 Panel 3
Pass Thru Application
10
1
2
4
IG
L
Each power box
accepts up to 6
simplex receptacles;
3 per side.
SIMPLEX RECEPTACLE TYPES
Assembly Instructions1-800-645-2986
OFFICE PARTITIONS
Receptacle
Removal Tool is
required when
removing
receptacles from
power box.
Circuit 1 Circuit 2 Circuit 3 Circuit 4
Isolated
WARNING
Maximum 16 simplex receptacles per 15 amp circuit. Maximum 20 simplex receptacles per 20 amp circuit.
M
CONNECTING POWER SOURCE
Connect starter
cable to power box
Use blank to fill
“empty” simplex
locations on
power box.
Blank
STEP 1
Installation using
power pole.
Power pole not
included.
OR
(15 AMP CIRCUIT 1)
STEP 2
(20 AMP CIRCUIT 1)
Use either a 15
or 20 AMP
circuit to
supply power
(20 AMP STARTER)
OR
11
Have a
licensed
electrician
install a hard
wired
connection.
The power system is an eight wire system consisting of four circuits. Each circuit is rated at 20 amps/120 volts maximum. Circuit 1 (black), Circuit 2 (red) and Circuit 4 (pink) share a common neutral (white) and ground (green) while Circuit 3 (blue) has an individual neutral (gray) and ground (green/yellow). Circuits rated at 20 amps/120 volts, or as permitted by local codes.
Q
Assembly Instructions1-800-645-2986
OFFICE PARTITIONS
STEP 1
Depending on where your power
source comes from, remove opening
blank from End Cap, Three Way or
Corner Cap. Place over starter cable
and attach to bottom of panel
raceway. Adjust accordingly.
Finished End panel with power
source exiting raceway.
If power source does not exit from
STEP 2
End, Corner or Three Way, leave
opening blank in place and attached
cap as needed.
Finished Three Way
with power source
exiting raceway.
Finished Corner with power
source exiting raceway.
13
Loading...