Intergas Compact HRE 18 SB, Compact HRE 30 SB, Compact HRE 40 SB, Compact HRE 24 SB Operating Instructions Manual

1
Compact HRE 18 SB 24 SB 30 SB 40 SB
Operating Instructions
Installation of the appliance may only be carried out by an installer/competent person. Ple
ase ask your installer to instruct you on how to fill and bleed the appliance and the installation and on their operation. Strictly abide by all the instructions and warnings. Always use the appliance in accordance with the Operating Instructions. It is forbidden to interfere with a sealed component.
CONTENTS 1 Operation of the appliance 2
1.1 Operation of the central heating ................................................................. 2
1.2 Operation of domestic hot water supply (in combination with an indirectly
heated hot water storage cylinder ............................................................. 2
2 Operation and display read-out 2-3
2.1 Operating mode on the service display ...................................................... 3
2.2 Changing the settings of the various functions ........................................... 3
3 Start-up 3
4 Faults 3-4
5 Filling and bleeding appliance and installation 4
5.1 Central heating system ............................................................................... 4
5.3 Frost protection ........................................................................................... 4
6 Maintenance 4
©
2012 Intergas Heating Ltd Subject to change.
2
Intergas Heating Ltd is a licensed member of the Benchmark Scheme which aims to improve the standards of installation and commissioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety, efficiency and performance. Benchmark is managed and promoted by the Heating and Hotwater Industry Council. For more information visit www.centralheating.co.uk.
Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation. The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations (England and Wales).
All Installations must be notified to Local Aerea Building Control either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer who should, on receipt, write the Notification Number on the Benchmark Checklist.
This product should be serviced regularly to optimise its safety, efficiency and performance. The service engineer should complete the relevant Service Record on the Benchmark Checklist after each service. The Benchmark cheklist may be required in the event of any warrranty work and as supporting documentation relating to home improvements in the optional documents section of the Home Information Pack.
1 OPERATION OF THE APPLIANCE
The purpose of the Intergas Compact HRE SB wall mounted gas fired boiler is to heat water and to supply it to the central heating (CH) sy
stem and when an indirectly heated domestic hot water storage cylinder is installed, apply heat to the domestic hot water (DHW)
installation.
The appliance is fitted with a modulating control. This means that the power is adjusted in line with the required heat. The boiler controller responds to each call for heat from the heating or the DHW system by igniting the burner and monitoring the flame.
1.1 Operation of the central heating
The call for heat arises as a result of the room temperature being lower than the temperature set on the room thermostat. If at that time the appliance does not have a call for DHW, the appliance comes on in central heating mode. The central heating temperature control modulates on the basis of the set central heating supply temperature. This means that when the desired central heating supply temperature is approached the appliance adjusts the power. The pump for the central heating has a post purge period of 1 minute. The post purge period may be changed if desired. The pump runs automatically for 10 seconds once every 24 hours to prevent blocking.
1.2 Operation of domestic hot water supply
By connecting the Compact HRE SB to a DHW storage cylinder the DHW circuit can be heated. The built-in regulation ensures that the DHW demand takes preference over a CH demand. During delivery of hot tap water no heat is supplied by the appliance to the central heating system.
2 OPERATION AND DISPLAY READ-OUT
Read-out Operation
1
On / off
A On / Off button
2
CH operation or setting maximum CH temperature
B DHW / CH b
utton, for setting desired temperature
3
DHW operation or setting DHW temperature
C - button
4
Desired temperature of CH or DHW in °C / CH water pressure (bar) / Fault code/ Time
D + button
5
Clock “on” CH enabled
E Clock function setting
6
Clock “off” CH disabled
F DHW comfort function off/eco/on (
not applicable for Compact HRE SB
)
7
DHW comfort function eco (
not applicable for Compact HRE SB)
G Service button
8
DHW comfort function on ((
not applicable for Compact HRE SB)
H Reset
button
9
Operating code
10
Flashes to indicate fault
Loading...
+ 2 hidden pages