![](/html/4e/4e42/4e42b84661f52ea16659d8d5f007fc3f7c086318dd920777ea0a10ce66d5615b/bg1.png)
IntaKlean
Installation & Servicing Instructions
IKMF22 and IKMF28
In this procedure document we have endeavoured to make the
information as accurate as possible.
We cannot accept any responsibility should it be found that in
any respect the information is inaccurate or incomplete or
becomes so as a result of further developments or otherwise.
© Intatec Ltd. 2012
Intatec Ltd
Airfield Industrial Estate
Hixon
Staffordshire
ST18 0PF
Tel: 01889 272 180
Fax: 01889 272 181
email: sales@intatec.co.uk
web: www.intatec.co.uk
![](/html/4e/4e42/4e42b84661f52ea16659d8d5f007fc3f7c086318dd920777ea0a10ce66d5615b/bg2.png)
B
A
BB
Return
Return
Combi/Sealed System
Open Vented System
Header Tank
Vent
Pipe
û
ü
ü
In both diagrams, position A is best practice
whilst B is suitable
A
INSTALLATION
The IntaKlean triple action filter is suitable for installation on any central heating system
and can be fitted anywhere in any orientation.
For best performance and filter protection however, we recommend that the IntaKlean
is installed on the return leg of the circuit, between the last radiator and the boiler to
gain the maximum advantage of the IntaKlean’s vortex technology.
© Intatec Ltd 2012
1
![](/html/4e/4e42/4e42b84661f52ea16659d8d5f007fc3f7c086318dd920777ea0a10ce66d5615b/bg3.png)
INSTALLATION
Ø22 Size =216 Ø28 Size = 231
Ensure that the system is suitably drained down and all system pressure has been
released.
On open vented systems, make sure that the feed and expansion tank is either isolated
or “tied up”.
When siting the IntaKlean ensure that the collection vessel is positioned to allow access
and removal of the bottom cover, withdrawl of the magnetic element and venting air.
Having removed the prescribed section of pipework, make sure that the open ends of
both pieces are free of debris and ready to receive the nut and olive. Fit both isolation
valves but do not tighten fully.
© Intatec Ltd 2012
2