Ver 0.5 2008. 04. 21 ▶ Changed Installation Bracket
▶ Updated System Block
▶ Changed DIP S/W control method
▶ Appendix C. System Block
▶ Appendix D. Troubleshooting for the MPE25K
Added information
Added material name of each image
2
▶Safety Precautions:
Î Use the power plug at the adaptor to turn the power on and off.
Î Please make sure that a ground wire is installed to connect the Antenna Unit to an appropriate
earth ground.
Î Refer servicing to a qualified technician who is familiar with NEC (National Electrical Code) and
a related regulation for installation to reduce the risk of electrical damage when the unit does not
appear to operate normally or exhibits a marked change in performance.
Radio Regulation Conformance
This equipment has been tested and found to comply with the limits for a Class B digital
device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable
protection against harmful interference in a residential installation. This equipment
generates, uses and can radiate radio frequency energy and, if not installed and used in
accordance with instructions, may cause harmful and, if not installed and used in accordance
with instructions, may cause harmful interference to radio communications. However, there is
no guarantee that the interference will not occur in a particular installation.
This device complies with Part 15 of the FCC rules. Operation is subject to the following two
conditions: (1) this device may not cause harmful interference. And (2) this device must
accept any interference received, including interference that may cause understand operation.
FCC RF Radiation Exposure Statement
The antenna(s) used for this transmitter must be installed to provide a separation distance
of at least 80 cm for LINK Antenna and 20 cm for Coverage Antenna from all persons and must
not be co-located or operating in conjunction with any other antenna or transmitter.
WARNING
Any changes or modifications not expressly approved by the manufacturer could void
the user’s authority to operate the equipment.
Fig. 2 List of all the Components in the System...................................오류! 책갈피가 정의되어 있지 않습니다.
Fig. 3 LINK ANT.......................................................................................................................................................10
Fig. 15 POLE MOUNTING .....................................................................................................................................21
Fig. 16 POWER PORT Connection Diagram.........................................................................................................22
Fig. 17 Verifying Reception Status ..........................................................................................................................23
Fig. 18 LINK ANT Tilting ........................................................................................................................................23
Fig. 19 MTG BRACKET – CU SET Connection Image.................................................................................. ...... 24
Fig. 20 MTG BRACKET – CU Con nection Image................................................................................................25
Fig. 21 MTG Bracket – CU SET Connection Seque nce.........................................................................................26
Fig. 28 Coverage Unit LED...................................................................................................... ................................30
Fig. 29 System Configuration...................................................................................................................................32
Table 1 Band Setting.................................................................................................................................................15
Table 2 Cellular Frequency....................................................................오류! 책갈피가 정의되어 있지 않습니다.
This document will provide details on how to successfully install the Juni JR-10 SOHO
Repeater system. The flow chart below shows the main steps involved in setting up the
equipment.
3. Locating
4. Band Setting
5. Link Ant
6. Power / Optimization
1. Start
2. Package Check
7. CU
8. Status Check
9. End
Fig. 1 Installation Flow Chart
8
2. Package Check
The first step when installing the repe ater is to check if all components are present and that
the parts do not contain any visible faults.
the JR-10 SOHO Repeater Kit.
The figure below illustrates the items included in
Fig. 2 List of all the Components in the System
9
2.1 LINK ANT
Î The role of the Antenna Unit is to communicate with the BTS. It is usually located
outside the building where service is to be improved. The Antenn a Unit can be mounted
onto a wall or a pole, depending on the specific installation needs.
2.2 COVERAGE UNIT (CU)
Î The role of the Coverage Unit is to communicate with the mobiles within the building
where needs improved coverage. It is intended for wall mounting.
Fig. 3 LINK ANT
Fig. 4 COVERAGE UNIT (CU)
10
3. Preparing for Antenna Unit and Coverage Unit Installation
Determining the installation location of the unit is viewed as one of the most important
choices, as the place of choice of the unit will heavily impact the overall performance of the
repeater.
The first selection that needs to be made by the user is to determine if the units will be
mounted to a wall or a pole. Once this decision has been confirmed, the choice of location
can be arranged.
When determining the position of the Antenna Unit, the following points should be considered.
Î Will the Antenna Unit be mounted on a Wall or a pole?
Î Is a BTS visible near site location?
Î Avoid areas where may possibly hinder the communication between the Antenna Unit and
the BTS such as large walls.
Î The Antenna Unit should be installed less than than10 feet away from the wall penetration
or window which will provide access to the inside of the building.
The following points should be considered when determining the location of the Coverage
Unit
Î Attempt to position the Coverage Unit at the center of desired service region
Î Attempt to position the Coverage Unit so that it is clearly visible.
Î Make sure that the distance from the Coverage Unit to its power source is less than 20feet.
11
4. Frequency Band Setting
Once the location and positioning of the Antenna Unit and Coverage Unit are finalized, the
authorized installer should proceed with installing the Antenna Unit and Coverage Unit. But
first, the installer should set the appropriate operating frequency band(s) for the repeater,
based on Verizon Wireless licenses. The figure and table below show the DIP Switch settings.
Usually both PCS and Cellular bands have to be set up.
Î DIP Switch Functions
Fig. 5 DIP S/W 기본 Setting
PIN NO. FUNC TION STATUS
1 Cellular Band Selection
2
3
4
PCS Band Selection See the next tables below
5
6
7
8 PCS EVDO OFFSET
9 Cellular EVDO OFFSET
10 Band Selection Mode
11 Uplink RF OFF
12 Hardware Reset
PIN NO. FUNC TION STATUS
1 PCS PATH HARDWARE ON/OFF
2 CELLULAR PATH HARDWARE ON/OFF
ON : PCS Gain OFFSET 3dB(increase) ON
OFF : PCS Gain OFFSET 3dB(reduction) OFF
ON : Cellular Gain OFFSET 3dB(increase )ON
OFF : Cellular Gain OFFSET 3dB(reduction) OFF
OFF : Hardware Band Selection Mode
ON : PCS UL/DL PATH HARDWARE ON
OFF : PCS UL/DL PATH HARDWARE OFF
ON : CELLULAR UL/DL PATH HARDWARE ON
OFF : CELLULAR UL/DL PATH HARDWARE OFF
ON : Cellular B Band
OFF : Cellular A Band
ON : Software Band Selection Mode
ON : Reverse RF Power OFF
OFF : Reverse RF Power ON
ON : Reset
OFF : Normal Operation
12
Loading...
+ 27 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.