Infinity Drain TDB 20 User Manual

Page 1
TDB 20 Series
TDB 20│Tile Drain Series
- 12 gauge 316 Stainless Steel Frame and Body
- ¾″ depth inside frame for material
- ¼″ drainage gap
- Indoor or outdoor use
- Residential grade bonded flange (PVC or ABS) with 4” throat
- Uses liquid and fabric sheet membrane waterproofing (not Hot Mop)
- Grate can be removed completely for cleaning
- Requires traditional 4-way floor pitch
- Flow rate 9 GPM with 2″ outlet
Finishes:
____
Satin Stainless
_
Polished Stainless
_____
Complete Kits:
TDB 20-A SS Bonded Flange ABS Drain TDB 20-A PS Bonded Flange ABS Drain TDB 20-P SS Bonded Flange PVC Drain TDB 20-P PS Bonded Flange PVC Drain
Components:
T 20 B 8″ x 8″ Tile Drain Strainer
BFA 42 Bonded Flange ABS BFP 42 Bonded Flange PVC TKEY Lift Out Key
Installation (TD) Center Drain
Infinity Drain
18 Secatoag Avenue Port Washington, NY 11050 Phone: 516.767.6786 Fax: 516.740.3066 www.InfinityDrain.com
Dimension are subject to Manufacturers tolerance and change without notice. We can assume no responsibility for use of superseded or void data.
Note: Installer must verify all rough-in
dimensions prior to installation and consult local and national codes. Conformity and compliance to local and national codes are the responsibility of the installer.
Page 1 of 2
REV. 08.01.2013
Page 2
TDB 20 Specifications
TDB 20-A
8″ x 8″ Kit with ABS Bonded Flange Drain Body, fits 2″, 3″ and 4″ Outlet
(8″ L x 8″ W x 1 5/16″ H) 1 - T 20 B Tile Drain Strainer 1 - BFA 42 Bonded Flange ABS Drain
TDB 20-P
8″ x 8″ Kit with PVC Bonded Flange Drain Body, fits 2″, 3″ and 4″ Outlet
(8″ L x 8″ W x 1 5/16″ H) 1 - T 20 B Tile Drain Strainer 1 - BFP 42 Bonded Flange PVC Drain
Infinity Drain
18 Secatoag Avenue Port Washington, NY 11050 Phone: 516.767.6786 Fax: 516.740.3066 www.InfinityDrain.com
Dimension are subject to Manufacturers tolerance and change without notice. We can assume no responsibility for use of superseded or void data.
Note: Installer must verify all rough-in
dimensions prior to installation and consult local and national codes. Conformity and compliance to local and national codes are the responsibility of the installer.
Page 2 of 2
REV. 08.01.2013
Loading...