Infinity Drain TDB User Manual [en, es]

Bonded Flange
Center Drain Series
Installation Instructions
LTD 5 B
TDB 15
RTDB 15
TDB 20
The Bonded Flange Center Drain Series are intended for use
with the following waterproong methods:
Liquid Waterproofing ° Fabric Waterproofing
°
Made in the U.S.A.
Infinity Drain • 18 Secatoag Avenue, Port Washington, New York 11050
Phone 516.767.6786 • Fax 516.740.3066 • www.InfinityDrain.com
Las dimensiones están su jetos a la tolerancia del fabricante y cambio s in prev io aviso. No po demos a sumir n inguna
responsabilidad por el us o de dato s a sustituir lo s nulos .
use of su pers eded or void dat a.
Series Components:
LTD 5 B Series
LT5-2 SS 5" x 5" Strainer Only with Satin Stainless Finish
LT5-2 PS 5" x 5" Strainer Only wit h Polishe d Stainl ess Finish
BFA 22 Bonde d Flange ABS Drain
BFP 22 Bonded Flange PVC Drain
TDB 15 Series
T15 A SS 5" x 5" Strainer Only with Satin St ainless Finish
T15 A PS 5" x 5" Strainer Onl y with Polished Stainless Finish
BFA 42 Bonde d Flange ABS Drain
BFP 42 Bonded Flange PVC Drain
TKE Y Lif t Out Key
HS 4 4" Hair Strainer
RTDB 15 Series
RT 15 B 5" Round Tile Drain St raine r
BFA 42 Bonde d Flange ABS Drain
BFP 42 Bonded Flange PVC Drain
TDB 20 Series
T20 A SS 8" x 8" Strainer Only with Satin Stainless Finish
T20 A PS 8" x 8" Strainer Only with Polished Stainless Finish
BFA 42 Bonde d Flange ABS Drain
BFP 42 Bonded Flange PVC Drain
TKE Y Lif t Out Key
HS 4 4" Hair Strainer
Section A-A
LTD 5 B
Section A-A
TDB 15
Note: Installer must verify all rough-in
dimensions prior to installation and consult local and national codes. Conformit y and compliance to local and national codes are the responsibility of the installer.
Section A-A
RTDB 15
Section A-A
TDB 20
Tenga en cuenta: Instalador debe comprobar
todas las dimensiones en las partes previa a la instalación y consultar localmente y nacionalmente los códigos. La conformidad y el cumplimiento de códigos local y nacional es responsabilidad del instalador.
2
(C1)
(C2)
(A) Strainer
(B) Throat
Liquid/Fabric Waterproong
(C) Bonde d Flange Drain Body BFA/BFP
Installation
1. Set bonded ange into a wet pre laid bed of
mortar and allow bonded ange drain body (C) to recess into suboor. Connect the drain body (C) to existing waste line using PVC cement or ABS pipe cement. If no access to drain pipe is available from below, prep outlet of the bonded ange (C) with PVC or ABS primer and cement and push t into existing waste line as you set the bonded ange into the mortar. Ensure that drain assembly (C) is level. Remove top threaded ring (C1) from drain body (C2).
Suboor
Note: The outlet of the bonded ange drain body (C2) can be made to be used with a 2”, 3” OR 4” waste line by cutting the outlet section down to the desired section size.
(C2) Bonded Flan ge Drain Bo dy
Waste Line Pipe
Instalación
1. Coloque bonded ange en el húmedo
pre-establecido de mortero y permita el drenaje de bonded ange (C) que rebaje en el subsuelo. Conecte el drenaje (C) a la actual línea de desecho usando cemento de PVC o cemento de tubería de ABS. Si no hay acceso al tubo de desagüe de abajo, preparar la salida del bonded ange en el mortero. Asegure que la ensamble para desagüe (C) este nivelado. Elimine la parte superior del anillo roscador (C1) del desagüe (C2).
4” Section
Flange
Tenga en cuenta: La salida del bonded
ange desagüe (C2) se puede hacer para ser utilizado con 2”, 3” U 4” línea de desechos cortando la sección de salida al tamaño de la sección deseada.
3” Section
2” Section
2.Install backer board, cement board, or other desired backing material on to framed walls as per local code.
3. Spread a mortar bed across the intended shower area. Ensure the starting height of the mortar bed at the drain is ush with the ange of the drain body (C2) at the drain. Pitch this mor tar bed in four directions towards the drain body (C2).
2. Instale los paneles, tablero de cemento, u otro material de soporte deseada a los marcos de paredes según las normas locales.
3. Propagación el mortero a través de la zona de ducha prevista. Asegure que la altura inicial del mortero en el drenaje este a ras con el desagüe (C2). Inclina esta capa de mortero en cuatro direcciones hacia el cuerpo de desagüe (C2).
3
4. When mortar layer is dry, perform necessary waterproofing (Liquid /Fabric Waterproofing) as per local code. Ensure waterproofing layer reaches the edge of the hole in the drain body (C2).
4. Cuando el mortero este seco, realice necesario impermeabilización (Liquida/ Tela impermeabilización) según las normas locales. Asegure que la capa de impermeabilización alcance el borde del agujero en el cuerpo del desagüe (C2).
4
Backer Board
(C2) Bonded Flan ge Drain Bo dy
Suboor
Motar Bed
Liquid/Fabric
Waterproong
Waste Line Pipe
5. Set top threaded ring (C1) onto the bonded ange drain body (C2) using thinset and position to desired location within the drain body (C2).
Note: When overall build up greater than ¼” above waterproong is needed (excluding nished oor material thickness) use mortar to set top threaded ring (C1).
6. Once the thinset/mortar is dr y, thread the throat (B) into top threaded ring (C1). Adjust to the desired height. Turn clockwise to lower, counter-clockwise to raise. When determining desired height, include thickness of thinset and nishing material.
5
(C1) Top Threaded Ring
(C2) Bonded Flange Drain Bo dy
Waste Line Pipe
Liquid/Fabric
Waterproong
Thinset/Motar
Motar Bed
5. Fijar la parte superior roscada (C1) en el bonded ange desagüe (C2) usando thinset y
posiciónelo a la ubicación deseada dentro del
desagüe (C2).
Tenga en cuenta: Cuando construya más que ¼” arriba impermeabilización es necesaria (excluyendo material de piso terminado) Utilice mortero para jar el anillo roscado.
6. Una vez el thinset/mortero este seco, rosca el cuello (B) en la parte superior del anillo roscado (C1). Ajustar a la altura deseada. Gire hacia la derecha para bajar, hacia la izquierda para subir. Cuando determine la altura, incluya espesor del thinset y material terminado.
6
(C1)
Bonded Flange Drain Body
(C2)
(B) Throat
Waste Line Pipe
Model Overall Minimum Height Overall Maximum Height*
LTD 5 B 1” 2”
RTDB 15 ¹³⁄¹⁶” 1 ⁷⁄¹⁶”
TDB 15 1 ⁵⁄¹⁶” 1 ¹⁵⁄¹⁶”
TDB 20 1 ⁵⁄¹⁶” 2 ¹⁄¹⁶”
4
7. Using desired oor material, mark the thickness of the material along the outside of the throat (B), so that it will nish 1/16” above the channel. Spread thinset/mortar bed up to the marked thickness. Ensure this bed is pitched all directions toward the center drain. If using a mortar build up, apply a bead of silicone caulk around the throat af ter mortar is dr y. Lay nishing material, and have material nish to the edge of the throat (B). DO NOT allow nishing material to nish on top of the stainless steel channel edge.
7. Usando el material del suelo deseado, marque el espesor del material a lo largo de la parte exterior del el cuello (B), de modo que termine 1/16” arriba del canal. Propagación thinset/mortero hasta el espesor marcada. Asegure que esto esté lanzado en todas las direcciones hacia el drenaje del centro. Si se construye mortero, aplique un cordón de silicona alrededor del cuello después del mortero cuando este seco. Coloque material terminado, y tenga el material hasta el borde de cuello (B). NO PERMITA que el material termine en la parte superior del borde del canal de acero.
Thinset
Sub-oor
Mort ar Bed
Liquid/Fabric
Waterproong Membrane
Before nishing
material
Antes que el material
esté terminado
8. Remove the strainer (A) from the throat (B).
LTDB 5 : Set nishing material of a thickness
up to 3/8” direc tly into strainer using thinset.
RTDB15/TDB15/TDB20: Set nishing material of a thickness 3/4” direc tly into strainer using thinset. If nishing material is less than 3/4”, spread a layer of mor tar into the top frame of the strainer (A), allowing for thinset and nishing material to nish 1/16” above the metal frame. Allow to dry, spread thinset and lay material. Place top frame of strainer (A) back into the throat (B).
Assu renishing material is NOT inst alled
After nishing
material
over edge of throat
Después que el material
esté terminado
8. Remueva la parte (A) del cuello (B).
LTDB 5: Coloque el material terminado al
espesor de 3/8” directamente en la parte (A) usando thinset.
RTDB15/TDB15/TDB20: Coloque material terminado al espesor de 3/4” directamente a la parte (A) usando thinset. Si el material esta menos de 3/4”, propagación una capa de mortero en el marco superior de la parte (A), permitiendo que el thinset y el material esté terminado a 1/16” arriba en el marco. Permita que se seque, propagación thinsey y colocar el material. Coloque el marco de la parte (A) de regreso al cuello (B).
Backer Board
Thinset
Finishing Material
Thinset/Mor tar
Liquid/Fabric Waterproong
Mort ar Bed
Suboor
Bonde d Flange Drain B ody
Waste Line Pipe
5