Immergas VICTRIX 24 TT 2 ERP Instruction And Warning Book

Page 1
Instruction and
*1.039151ENG*
warning book
IE
VICTRIX
24 TT 2 ERP
Page 2
Page 3
Dear Customer,
Our compliments for having chosen a top-quality Immergas product, able to assure well-being and safety for a long period of time. As an Immergas customer you can also count on a qualied aer-sales service, prepared and updated to guarantee constant eciency of your boiler. Read the following pages carefully: you will be able to draw useful suggestions regarding the correct use of the appliance, the respect of which, will conrm your satisfaction for the Immergas product.
For assistance and scheduled maintenance contact Authorised Aer-Sales centres: they have original spare parts and are specically trained directly by the manufacturer.
General recommendations
All Immergas products are protected with suitable transport packaging. e material must be stored in dry environments protected against bad weather. e instruction book is an integral and essential part of the product and must be consigned to the new user also in the case of transfer or succession of ownership. It must be stored with care and consulted carefully, as all of the warnings provide important safety indications for installation, use and maintenance stages. is instructions manual provides technical information for installing Immergas boilers. As for the other issues related to boiler installation (e.g. safety in the work
site, environment protection, injury prevention), it is necessary to comply with the provisions specied in the regulations in force and principles of good practice. In compliance with legislation in force, the systems must be designed by qualied professionals, within the dimensional limits established by the Law. Installation
and maintenance must be performed in compliance with the regulations in force, according to the manufacturer's instructions and by an authorised company, which has specic technical expertise in the system sector, as required by Law.
Improper installation or assembly of the Immergas appliance and/or components, accessories, kit and devices can cause unexpected problems to people, animals and objects. Read the instructions provided with the product carefully to ensure a proper installation.
Maintenance must be carried out by an authorised company. e Authorised Aer-sales Service represents a guarantee of qualication and professionalism. e appliance must only be destined for the use for which it has been expressly declared. Any other use will be considered improper and therefore potentially
dangerous. If errors occur during installation, operation and maintenance, due to non compliance with technical laws in force, standards or instructions contained in this
book (or however supplied by the manufacturer), the manufacturer is excluded from any contractual and extra-contractual liability for any damages and the appliance warranty is invalidated.
e company IMMERGAS S.p.A., with registered oce in via Cisa Ligure 95 42041 Brescello (RE), declares that the design, manufacturing and aer-sales assistance processes comply with the requirements of standard UNI EN ISO 9001:2008.
For further details on the product CE marking, request a copy of the Declaration of Conformity from the manufacturer, specifying the appliance model and the language of the country.
Immergas S.p.A. declines all liability due to printing or transcription errors, reserving the right to make any modications to its technical and commercial documents without prior notice.
Page 4
INDEX
USER page INSTALLER page MAINTENANCE TECHNICIAN page
1 Boiler installation ................................................5
1.1 Installation recommendations. ......................... 5
1.2 Main dimensions. ..............................................6
1.3 Anti-freeze protection. .......................................6
1.4 Boiler connection unit. ...................................... 7
1.5 Gas connection. ...................................................7
1.6 Hydraulic connection. ........................................7
1.7 Electric connection. ........................................... 8
1.8 Remote controls and room chrono-
thermostats (Optional). .....................................8
1.9 External temperature probe (Optional). ..........9
1.10 Immergas ue systems. .................................... 10
1.11 Tables of resistance factors
and equivalent lengths......................................10
1.12 Outdoor installation in a
partially protected area. ...................................12
1.13 Concentric horizontal kit installation. ........... 13
1.14 Concentric Vertical kit installation. ...............14
1.15 Separator kit installation. ................................. 15
1.16 Adaptor C9 kit installation. ............................16
1.17 Ducting of ues or technical slots. ................. 17
1.18 Conguration type B, open chamber and
forced draught for indoors. .............................17
1.19 Flue exhaust to ue/chimney. ..........................17
1.20 Flues, chimneys, chimney pots and
terminals. ........................................................... 17
1.21 Water treatment system lling. ....................... 18
1.22 System lling. .................................................... 18
1.23 Condensate trap lling. .................................... 18
1.24 Gas system start-up. ......................................... 18
1.25 Boiler start up (ignition). .................................18
1.26 Circulation pump. .............................................19
1.27 Kits available on request. .................................19
1.28 Boiler components. ...........................................20
2 Use and maintenance instructions .................21
2.1 Cleaning and maintenance. .............................21
2.2 General warnings. ............................................. 21
2.3 Control panel. ....................................................21
2.4 Using the boiler. ................................................22
2.5 Troubleshooting. ...............................................23
2.6 Information menu. ...........................................25
2.7 Boiler shutdown ................................................25
2.8 Restoring central heating system pressure. ...25
2.9 System draining................................................25
2.10 Anti-freeze protection. ..................................... 25
2.11 Case cleaning. .................................................... 25
2.12 Decommissioning. ............................................25
3 Boiler commissioning
(initial check).....................................................26
3.1 Boiler Hydraulic diagram. ...............................26
3.2 Wiring diagram. ................................................27
3.3 Removable memory..........................................28
3.4 Troubleshooting. ...............................................28
3.5 Converting the boiler to
other types of gas. .............................................28
3.6 Checks following conversion
to another type of gas. ......................................28
3.7 Calibration type involving
the replacement of a component. ...................29
3.8 Complete calibration function. .......................29
3.9 Adjusting the air gas ratio ................................30
3.10 Fast calibration. ................................................. 30
3.11 Flue test. ............................................................. 31
3.12 Programming the P.C.B....................................31
3.13 Solar panels coupling function. ...................... 34
3.14 “Chimney Sweep” function..............................34
3.15 Pump anti-block function. .............................. 34
3.16 ree-way anti-block function. .......................34
3.17 Radiators antifreeze function. .........................34
3.18 P.C.B. periodic self-check. ...............................34
3.19 Automatic vent function. .................................35
3.20 Yearly appliance check and maintenance. .....35
3.21 Casing removal. .................................................36
3.22 Variable heat output. ........................................38
3.23 Combustion parameters. .................................38
3.24 Technical data. ...................................................39
3.25 Key for Data nameplate. ...................................40
3.26 Technical parameters for combination boilers (in compliance with Regulation
813/2013). .......................................................... 41
3.27 Product che (in compliance with
Regulation 811/2013). ......................................41
3.28 Parameters for lling in
the package che. ..............................................42
Page 5
BOILER
1
INSTALLATION
1.1 INSTALLATION RECOMMENDATIONS.
e Victrix TT boiler has been designed for wall mounted installation only; for heating and production of domestic hot water for domestic use and similar purposes. e place of installation of the appliance and relative Immergas accessories must have suitable features (technical and structural) such to allow (always in safety, efficiency and comfortable conditions):
- installation (according to the provisions of the
technical legislation and technical regulations);
- maintenance operations (including scheduled,
periodic, routine and special maintenance);
- removal (to outdoors in the place for loading
and transporting the appliances and compo­nents) as well as their eventual replacement with appliances and/or equivalent components.
e wall surface must be smooth, without any protrusions or recesses enabling access to the rear part. ey are not designed to be installed on plinths or oors (Fig. 1-1). By varying the type of installation the classica­tion of the boiler also varies, precisely:
- Type B23 or B53 boiler if installed using the
relevant terminal for air intake directly from the room in which the boiler has been installed.
- Type C boiler if installed using concentric
pipes or other types of pipes envisioned for sealed chamber boilers for air intake and ex­pulsion of ue gas.
Note: appliance classication is provided in the depictions of the various installation solutions shown on the following pages.
Only professionally enabled companies are authorised to install Immergas gas appliances. Installation must be carried out according to regulation standards, current legislation and in compliance with local technical regulations and the required technical procedures.
Attention: Immergas declines all liability for damages caused by boilers removed from other systems or for any non-conformities of such equipment.
Before installing the appliance, ensure that it is delivered in perfect condition; if in doubt, contact the supplier immediately. Packing materials (sta­ples, nails, plastic bags, polystyrene foam, etc.) constitute a hazard and must be kept out of the reach of children. If the appliance is installed in­side or between cabinets, ensure sucient space for normal servicing; therefore it is advisable to leave clearance of at least 3 cm between the boiler casing and the vertical sides of the cabinet. Leave adequate space above the boiler for possible water and ue removal connections. Keep all amma­ble objects away from the appliance (paper, rags, plastic, polystyrene, etc.).
Do not place household appliances underneath the boiler as they could be damaged if the safety valve intervenes, if the drain trap is blocked, or if there are leaks from the hydraulic connec­tions; otherwise, the manufacturer cannot be held responsible for any damage caused to the household appliances. For the aforementioned reasons, we recommend not placing furnishings, furniture, etc. under the boiler. In the event of malfunctions, faults or incorrect operation, turn the appliance o immediately and contact an authorised company (e.g. the Authorised Technical Assistance centre, which has specically trained sta and original spare parts). Do not attempt to modify or repair the appliance alone. Failure to comply with the above implies personal responsibility and invalidates the warranty.
Installation regulations:
- this boiler can be installed outdoors in a partially protected area. A partially protect­ed area is one in which the appliance is not exposed to the direct action of the weather (rain, snow, hail, etc..).
NOTE: this type of installation is only possible when permitted by the laws in force in the appliance’s country of destination.
- Installation of gas appliances, ue exhaust pipes and combustion air intake pipes is forbidden in places with a re risk (for ex­ample: garages, closed parking stalls), and in potentially dangerous places.
- Installation is prohibited on the vertical projection of cooking hobs.
- Installation is forbidden in places/rooms that constitute public areas of apartment buildings, internal stairways or other escape routes (e.g. oor landings, entrance halls, etc.).
- Installation is also forbidden in places/rooms that constitute public areas of apartment buildings such as cellars, entrance halls, attics, los, etc., unless otherwise provided for by local regulations in force.
Attention: wall mounting of the boiler must guarantee stable and ecient support for the generator.
e plugs (standard supply) are only to be used to x the appliance to the wall; they only ensure
adequate support if inserted correctly (according to technical standards) in walls made of solid or semi-hollow brick or block. In the case of walls made from hollow brick or block, partitions with limited static properties, or in any case walls other than those indicated, a static test must be carried out to ensure adequate support.
ese boilers are used to heat water to below boiling temperature in atmospheric pressure. ey must be connected to a central heating system and hot water circuit suited to their performance and capacity.
YES NO
SI
1-1
INSTALLERUSER
NO
MAINTENANCE TECHNICIAN
5
5
Page 6
1.2 MAIN DIMENSIONS.
INSTALLERUSER
1-2
Key: V - Electrical connection G - Gas supply AC - Domestic hot water outlet ACV - Solar valve kit D.H.W. inlet
(optional) AF - Domestic cold water inlet SC - Condensate drain (minimum
internal diameter Ø 13 mm) M - System ow R - System return
1.3 ANTIFREEZE PROTECTION. Minimum temperature -5°C. e boiler comes
standard with an anti-freeze function that ac­tivates the pump and burner when the system water temperature in the boiler falls below 4°C.
In these conditions the boiler is protected against freezing to an ambient temperature of -5°C.
Minimum temperature -15°C. In the event the boiler is installed in a place where the temper­ature falls below -5°C, the appliance can freeze.
To prevent the risk of freezing follow the instruc­tions below:
- protect the central heating circuit from freezing by inserting a good-quality antifreeze liquid into this circuit, which is specially suited for central heating systems and which is manu­facturer guaranteed not to cause damage to the heat exchanger or other components of the boiler. e antifreeze liquid must not be harmful to one's health. e instructions of the
MAINTENANCE TECHNICIAN
manufacturer of this liquid must be followed scrupulously regarding the percentage neces­sary with respect to the minimum temperature at which the system must be kept. An aqueous solution must be made with potential pollution class of water 2 (EN 1717:2002 or local regula­tions in force).
e materials used for the central heating circuit
of Immergas boilers withstand ethylene and propylene glycol based antifreeze liquids (if the mixtures are prepared perfectly).
For life and possible disposal, follow the sup-
plier's instructions.
- Protect the domestic hot water circuit against freezing by using an accessory that is supplied on request (anti-freeze kit) comprising two electric heating elements, the relevant cables and a control thermostat (carefully read the installation instructions contained in the ac­cessory kit pack).
In these conditions the boiler is protected against freezing to temperature of -15°C.
Boiler antifreeze protection (both -5°C and -15°C) is thus ensured only if:
- the boiler is correctly connected to gas and elec­tricity power supply circuits;
- the boiler is powered constantly;
- the boiler is not in “o” mode;
- the boiler is not in anomaly conditions (par. 2.5);
- the essential components of the boiler and/or antifreeze kit are not faulty.
e warranty does not cover damage due to inter­ruption of the electrical power supply and failure to comply with that stated on the previous page.
NOTE: if the boiler is installed in places where the temperature falls below 0°C the domestic hot water and central heating attachment pipes must be insulated.
Height
(mm)
748 440 280
GAS
G AC AF R M
3/4” 1/2” 1/2” 3/4” 3/4”
Width
(mm)
CONNECTIONS
DOMESTIC
WATER
Depth
(mm)
SYSTEM
6
6
Page 7
1.4 BOILER CONNECTION UNIT.
e connection unit, which is composed of all the required accessories to connect the appliance's hydraulic and gas system, is furnished as an optional kit. Execute connections as indicated in the relative instructions sheet by using the connections represented in g. 1-3.
1.5 GAS CONNECTION.
Our boilers are designed to operate with methane gas (G20) and LPG. Supply pipes must be the same as or larger than the 3/4”G boiler tting. Before connecting the gas line, carefully clean inside all the fuel feed system pipes to remove any residue that could impair boiler eciency. Also make sure the gas corresponds to that for which the boiler is prepared (see boiler data name plate). If dierent, the appliance must be convert­ed for operation with the other type of gas (see converting appliance for other gas types). e dynamic gas supply (methane or LPG) pressure must also be checked according to the type used in the boiler, which must comply with the tech­nical standards in force, as insucient levels can reduce generator output and cause malfunctions. Ensure correct gas cock connection. e gas sup­ply pipe must be suitably dimensioned according to current regulations in order to guarantee cor­rect gas ow rate to the burner even in conditions of maximum generator output and to guarantee appliance eciency (technical specications). e coupling system must conform to technical standards in force.
Fuel gas quality. e appliance has been de­signed to operate with combustible gas free of impurities; otherwise it is advisable to t special lters upstream of the appliance to restore the purity of the fuel.
Storage tanks (in case of supply from LPG depot).
- New LPG storage tanks may contain residual inert gases (nitrogen) that degrade the mixture delivered to the appliance casing functioning anomalies.
- Due to the composition of the LPG mixture, layering of the mixture components may occur during the period of storage in the tanks. is can cause a variation in the heating power of the mixture delivered to the appliance, with subsequent change in its performance.
1.6 HYDRAULIC CONNECTION.
Attention: in order not to void the condensa-
tion module warranty, before making the boiler connections, carefully wash the heating system (pipes, radiators, etc.) with special pickling or descaling products to remove any deposits that could compromise correct boiler operation.
A treatment of the heating and water system water is required, in compliance with the tech­nical standards in force, in order to protect the system and the appliance from deposits (e.g. scale), slurry or other hazardous deposits. In order not to void the heat exchanger warranty, you are required to comply with what has been prescribed in paragraph 1.21.
Water connections must be made in a rational way using the couplings on the boiler template.
Attention: Immergas declines all liability in the event of damage caused by the inclusion of auto­matic lling that is not its own brand.
In order to meet the system requirements estab­lished by the regulations in force in relation to the pollution of drinking water, we recommend installing the IMMERGAS anti-backow kit to be used upstream of the cold water inlet connection of the boiler. It is also recommended that the heat transfer uid (e.g. water + glycol) entered in the primary circuit of the boiler (heating circuit), complies with the local regulations in force.
Attention: to preserve the duration and the e­ciency features of the appliance, in the presence of water whose features can lead to the deposit of scale, installation of the “polyphosphate dispenser” kit is recommended.
3-bar safety valve. Discharge of the safety valve has been conveyed to the condensate drain trap. Consequently, in the event of valve intervention, the discharged liquid will end up in the sewer system through the drainpipe of the condensate drain trap. e appliance has anyhow been provided with a drain tting (ref. 3 g. 1-3) with a relative cap to check the presence of liquid in the drainage circuit and to check the 3-bar safety valve.
Condensate drain. To drain the condensate produced by the appliance, it is necessary to connect to the drainage system by means of acid condensate resistant pipes, with an internal Ø of at least 13 mm. e system connecting the appliance to the drainage system must be carried out in such a way as to prevent freezing of the liquid contained in it. Before appliance ignition, ensure that the condensate can be correctly re­moved. Aer rst ignition, check that the drain trap is lled with condensate (para. 1.22). Also, comply with national and local regulations on discharging waste waters. In the event condensate is not discharged into the wastewater drainage system, a condensate neutraliser must be installed to ensure com­pliance with the parameters established by the legislation in force.
INSTALLERUSER
1-3
MAINTENANCE TECHNICIAN
Key: V - Electrical connection G - Gas supply AC - Domestic hot water outlet AF - Domestic cold water inlet SC - Condensate drain (minimum internal diame-
M
3
2
1
7
7
AC
R
AF
V
SC
G
M - System ow R - System return
1 - System lling valve 2 - System draining valve 3 - 3-bar safety valve drain tting signal
ter Ø 13 mm)
Page 8
1.7 ELECTRIC CONNECTION.
e appliance has an IPX5D protection degree, electrical safety of the appliance is reached only when it is connected properly to an ecient earthing system as specied by current safety standards.
Attention: Immergas S.p.A. declines any respon­sibility for damage or physical injury caused by failure to connect the boiler to an ecient earth system or failure to comply with the reference standards.
INSTALLERUSER
• Open the control panel connections compart­ment (Fig. 1-4).
To carry out electrical connections, all you have
to do is open the connections compartment as follows.
- Remove the front panel (Fig. 3-15b).
- Remove the cover (b g. 1-4).
1) Loosen the two screws (a).
2) Press the two hooks on the cover (b).
3) Remove the cover (b) from the control
panel (c).
- At this point, it is possible to access the terminal board (d).
Also ensure that the electrical installation cor­responds to maximum absorbed power speci­cations as shown on the boiler data nameplate. Boilers are supplied complete with an “X” type power cable without plug. e power supply cable must be connected to a 230V ±10% / 50Hz mains supply respecting L-N polarity and earth connection; , this network must also have a multi-pole circuit breaker with class III over-voltage category. To protect from possible dispersions of DC voltage one must provide a type A dierential safety device. When replacing the power supply cable, contact a qualied company (e.g. the the Authorised Aer-Sales Technical Assistance Service). e power cable must be laid as shown (Fig. 1-3). In the event of mains fuse replacement on the P.C.B., use a 3.15A quick-blow fuse. For the main power supply to the appliance, never use adapters, multiple sockets or extension leads.
Installation with system operating at direct low temperature. e boiler can directly supply
a low-temperature system by setting the ow temperature adjustment range “t0” and “t1” (Par. 3.12). In this situation it is good practice to insert a relevant safety kit (optional) made up from a thermostat (with adjustable temperature). Execute connection to terminal boards 14 and 15, eliminating jumper X70 (Fig. 3-2). e thermo­stat must be positioned on the system ow pipe at a distance of at least 2 metres from the boiler.
1.8 REMOTE CONTROLS AND ROOM CHRONOTHERMOSTATS OPTIONAL.
e boiler is prepared for the application of room chrono-thermostats or remote controls, which are available as optional kits (Fig. 1-5). All Immergas chrono-thermostats are connected with 2 wires only. Carefully read the user and assembly instructions contained in the acces­sory kit.
On/O Immergas digital chrono-thermostat.
e chrono-thermostat allows:
- set two room temperature value: one for
daytime (comfort temperature) and one for nighttime (reduced temperature);
- set a weekly program with four daily switch
on and switch o times;
- select the required operating mode from the
various possible alternatives:
manual operation (with adjustable tempera-
ture).
automatic operation (with set programme).
forced automatic operation (momentarily
changing the temperature of the automatic programme).
e chrono-thermostat is powered by two 1.5V
LR 6 type alkaline batteries.
Comando Amico Remoto Remote Control De-
vice V2 (CARV2) with climate chrono-thermostat function. In addition to the functions described in the previous point, the CARV2 panel enables the user to control all the important informa­tion regarding operation of the appliance and the heating system with the opportunity to easily intervene on the previously set parame­ters, without having to go to where the appli­ance is installed. e panel is provided with
self-diagnosis to display any boiler functioning anomalies. The climate chrono-thermostat incorporated into the remote panel enables the system ow temperature to be adjusted to the actual needs of the room being heated, in order to obtain the desired room temperature with extreme precision and therefore with evident saving in running costs. e CARV2 is fed directly by the boiler by means of the same 2 wires used for the transmission of data between the boiler and device.
Important: if the system is subdivided into zones using the relevant kit, the CARV2 must be used with its climate thermostat function disabled, i.e. it must be set to On/O mode.
Comando Amico Remoto Remote Control V2 or On/O chrono-thermostat electrical con­nections (Optional). e operations described
below must be performed aer having removed the voltage from the appliance. Any thermostat
or On/O environment chrono-thermostat must be connected to clamps 40 and 41 eliminating jumper X40 (Fig. 3-2). Make sure that the On/ O thermostat contact is of the “clean” type, i.e. independent of the mains voltage, otherwise the P.C.B. would be damaged. Any Comando Amico Remoto Remote Control V2 must be connected to clamps 44 and 41 eliminating jumper X40 on the P.C:B., paying attention not to invert the polarity in the connections (Fig. 3-2).
Important: if the Comando Amico Remo­to Remote Control V2 or any other On/Off chrono-thermostat is used, arrange two separate lines in compliance with current regulations regarding electrical systems. No boiler pipes must ever be used to earth the electric system or telephone lines. Ensure elimination of this risk before making the boiler electrical connections.
MAINTENANCE TECHNICIAN
c
2
2
1
1
a
a
3
b
d
1-4
8
8
1-5
Page 9
1.9 EXTERNAL TEMPERATURE PROBE OPTIONAL.
e boiler is designed for the application of the external temperature probe (Fig. 1-6), which is available as an optional kit. Refer to the relative instruction sheet for positioning of the external probe. e probe can be connected directly to the boiler electrical system and allows the max. system ow temperature to be automatically decreased when the external temperature increases, in order to adjust the heat supplied to the system according to the change in external temperature. e ex­ternal probe always operates when connected, regardless of the presence or type of room chrono-thermostat used and can work in combi­nation with Immergas chrono-thermostats. e correlation between system ow temperature and external temperature is determined by the position of the central heating selector switch on the boiler control panel (or on the CARV2 control panel if connected to the boiler) according to the curves shown in the diagram (Fig. 1-7). e electric connection of the external probe must be made on clamps 38 and 39 on the terminal board in the boiler control panel (Fig. 3-2).
INSTALLERUSER
31
45
58
Correction law of the ow temperature depending on the external temperature
1-6 1-7
and user adjustments of the central heating temperature.
9
9
EXTERNAL PROBE
Position of the central heating temperature user adjustment central heating temperature
MAINTENANCE TECHNICIAN
Page 10
1.10 IMMERGAS FLUE SYSTEMS.
Immergas supplies various solutions separately from the boilers regarding the installation of air intake terminals and ue exhaust, which are fundamental for boiler operation.
Attention: the boiler must be installed ex­clusively with an original Immergas “Green Range” inspectionable air intake system and fumes extraction system made of plastic, with the exception of the C6 conguration, as re­quired by the regulations in force.
INSTALLERUSER
e plastic pipes cannot be installed outdoors, for tracts longer than 40 cm, without suitable protection from UV rays and other atmos­pheric agents.
is system can be identied by an identi­cation mark and special distinctive marking bearing the note: “only for condensing boilers”.
Resistance factors and equivalent lengths. Each
ue component has a Resistance Factor based on experimental tests and specied in the table below. e Resistance Factor for individual components is independent from the type of boiler on which it is installed and has a dimen­sionless size. It is however, conditioned by the temperature of the uids that pass through the pipe and therefore, varies according to applica­tions for air intake or ue exhaust. Each single component has a resistance corresponding to a certain length in metres of pipe of the same diameter; the so-called equivalent length, can be obtained from the ratio between the relative Resistance Factors. All boilers have an
experimentally obtainable maximum Resistance Factor equal to 100. e maximum Resistance
Factor allowed corresponds to the resistance encountered with the maximum allowed pipe length for each type of Terminal Kit. This information allows calculations to be made to verify the possibility of setting up various ue congurations.
Positioning the gaskets (black) for “green
range” ue systems. Position the gasket cor-
rectly (for bends and extensions) (Fig. 1-8):
- gasket (A) with notches, to use for bends;
- gasket (B) without notches, to use for exten-
sions;
N.B.: if necessary, to ease the push-fitting,
spread the elements with commonly-used talc.
Coupling extension pipes and concentric elbows. To install push-tting extensions with other elements of the ue, proceed as follows: Install the concentric pipe or elbow with the male side (smooth) on the female side (with lip seal) to the end stop on the previously installed element in order to ensure sealing eciency of the coupling.
Attention: if the exhaust terminal and/or
concentric extension pipe needs shortening, consider that the internal duct must always protrude by 5 mm with respect to the external duct.
N.B.: for safety purposes, do not obstruct the boiler intake/exhaust terminal, even temporar­il y.
N.B.: when installing horizontal pipes, a min- imum inclination of 3% must be maintained and a section clip with pin must be installed every 3 metres.
1.11 TABLES OF RESISTANCE FACTORS
AND EQUIVALENT LENGTHS.
TYPE OF DUCT
1-8
Resistance
Factor
(R)
(A)
(B)
Equivalent length
in m of concentric
pipe Ø 80/125
MAINTENANCE TECHNICIAN
Concentric pipe Ø 80/125 m 1
Concentric bend 90° Ø 80/125
Concentric bend 45° Ø 80/125
Terminal complete with concentric horizontal intake-exhaust Ø 80/125
Terminal complete with concentric vertical intake-exhaust Ø 80/125
Concentric bend 90° Ø 80/125 with inspection
Stub pipe with inspection Ø 80/125
10
10
2.1
3.0
2.1
2.8
3.6
3.4
3.4
1
1.4
1
1.3
1.7
1.6
1.6
Page 11
TYPE OF DUCT
Resistance
Factor
(R)
Equivalent length
in m of concentric
pipe Ø 60/100
Equivalent
length in metres
of pipe Ø 80
Equivalent length
in metres of pipe
Ø 60
Equivalent length
in m of concentric
pipe Ø 80/125
Concentric pipe Ø 60/100 m 1
Concentric bend 90° Ø 60/100
Concentric bend 45° Ø 60/100
Terminal complete with concentric horizontal intake-exhaust Ø 60/100
Concentric horizontal intake- exhaust terminal Ø 60/100
Terminal complete with concentric vertical in­take-exhaust Ø 60/100
Concentric vertical intake-exhaust terminal Ø 60/100
Pipe Ø 80 m 1
Complete intake terminal Ø 80 m 1
Intake terminal Ø 80 Exhaust terminal Ø 80
Bend 90° Ø 80
Bend 45° Ø 80
Pipe Ø 60 m 1 for ducting Exhaust 3.3 m 0.5
Bend 90° Ø 60 for ducting
Reduction Ø 80/60
Intake and
Exhaust 6.4
Intake and
Exhaust 8.2
Intake and
Exhaust 6.4
Intake and Exhaust 15
Intake and Exhaust 10
Intake and
Exhaust 16.3
Intake and
Exhaust 9
Intake 0.87 m 0.1 Intake m 1.0
Exhaust 1.2 m 0.2 Exhaust m 1.0
Intake 3 m 0.5 Intake m 3.4 Exhaust m 0.9 m 1.4
Intake 2.2 m 0.35 Intake m 2.5
Exhaust 1.9 m 0.3 Exhaust m 1.6
Intake 1.9 m 0.3 Intake m 2.2
Exhaust 2.6 m 0.4 Exhaust m 2.1
Intake 1.2 m 0.2 Intake m 1.4
Exhaust 1.6 m 0.25 Exhaust m 1.3
Exhaust 3.5 m 0.55
Intake and
Exhaust 2.6
m 1
m 1.3
m 1
m 2.3
m 1.5
m 2.5
m 1.4
m 0.4
Intake m 7.3
Exhaust m 5.3
Intake m 9.4
Exhaust m 6.8
Intake m 7.3
Exhaust m 5.3
Intake m 17.2
Exhaust m 12.5
Intake m 11.5
Exhaust m 8.3
Intake m 18.7
Exhaust m 13.6
Intake m 10.3
Exhaust m 7.5
Intake 3.8
Exhaust 2.7
Intake 4.0
Exhaust 2.9
Intake m 3.0
Exhaust m 2.1
Exhaust m 1.9 m 3.0
Exhaust m 2.5 m 3.9
Exhaust m 1.9 m 3.0
Exhaust m 4.5 m 7.1
Exhaust m 3.0 m 4.7
Exhaust m 4.9 m 7.7
Exhaust m 2.7 m 4.3
m 0.4
Exhaust m 0.4
m 0.5
m 1
Exhaust m 0.6
m 0.9
m 0.9
Exhaust m 0.8
m 1.2
m 0.5
Exhaust m 0.5
0.7
Exhaust m 1.0 m 1.5
Exhaust m 1.1 m 1.6
Exhaust m 0.8 m 1.2
INSTALLERUSER
MAINTENANCE TECHNICIAN
Terminal complete with exhaust vertical Ø 60 for ducting
Exhaust 12.2 m 1.9
1111
Intake m 14
Exhaust m 3.7 m 5.8
Exhaust m 10.1
Page 12
1.12 OUTDOOR INSTALLATION IN A PARTIALLY PROTECTED AREA.
N.B.: a partially protected area is one in which the
appliance is not exposed to the direct action of the weather (rain, snow, hail, etc..).
NOTE: this type of installation is only possible when permitted by the laws in force in the ap­pliance’s country of destination.
• Conguration type B, open chamber and
forced draught.
Using the special coverage kit one can achieve
INSTALLERUSER
direct air intake (Fig. 1-9) and fumes exhaust in a single ue or directly outside. In this congura­tion it is possible to install the boiler in a partially protected place. In this conguration the boiler is classied as type B23. With this conguration:
- air intake takes place directly from the envi-
ronment in which the appliance is installed (outside);
- the fumes exhaust must be connected to its own
single ue (B23) or ducted directly outside via a vertical terminal for direct exhaust (B53) or via an Immergas ducting system (B53).
The technical regulations in force must be respected.
Coverage kit assembly (Fig. 1-10). Remove
the two plugs and the gaskets present from the two lateral holes with respect to the central one. Now cover the right intake hole using the relevant plate, xing it onto the le side using the 2 previously-removed screws. Install the Ø 80 outlet ange on the central hole of the boiler, taking care to insert the gasket supplied with the kit and tighten by means of the screws provided. Install the upper cover, xing it using the 4 screws present in the kit, positioning the relevant gaskets. Engage the 90° Ø 80 bend with the male end (smooth) in the female end (with lip seal) of the Ø 80 ange unit until it stops. Introduce the gasket, making it run along the bend. Fix it using the sheet steel plate and tighten by means of the straps present in the kit, making sure to block the 4 gasket aps. Fit the male end (smooth) of the exhaust terminal
into the the female end of the bend 90° Ø 80, making sure that the relevant wall sealing plate is already tted; this will ensure hold and joining of the elements making up the kit.
Max. length of exhaust duct. e ue pipe (both vertical or horizontal) can be extended to a max. length of 30 linear metres.
Coupling of extension pipes. To install push-t-
ting extensions with other elements of the ue, proceed as follows: Couple the pipe or elbow with the male side (smooth) in the female side (with lip seal) to the end stop on the previously installed element. This will ensure sealing eciency of the coupling.
• Conguration without cover kit in a partially protected location (type C boiler)
By leaving the side plugs tted it is possible
to install the appliance externally without the cover kit. Installation takes place using the Ø60/100, Ø 80/125 and separator Ø 80/80 concentric intake/ exhaust kits. Refer to the paragraph relative to indoor installation. In this conguration the upper cover kit guaran­tees additional protection for the boiler. It is recommended but not compulsory.
1-9
MAINTENANCE TECHNICIAN
e cover kit includes: N° 1 ermoformed cover N°1 Gasket clamping plate N°1 Gasket N°1 Gasket tightening strap N°1 Intake hole covering plate
e terminal kit includes: N° 1 Gasket N° 1 Discharge ange Ø 80 N° 1 Bend 90° Ø 80 N° 1 Drain pipe Ø 80 N° 1 Wall sealing plate
12
12
1-10
1-11
Page 13
1.13 CONCENTRIC HORIZONTAL KIT INSTALLATION.
Type C configuration, sealed chamber and fan assisted.
e position of the terminal (in terms of distanc­es from openings, overlooking buildings, oor, etc.) must be in compliance with the regulations in force.
is terminal is connected directly to the outside of the building for air intake and ue exhaust. e horizontal kit can be installed with the rear, right side, le side or front outlet. For installation with frontal outlet, one must use the xing plate and a concentric bend coupling in order to ensure sucient space to carry out the tests required by law upon commissioning.
External grid. Both the Ø 60/100 and Ø 80/125
intake/exhaust terminal, if properly installed, is pleasant to look at on the outside of the build­ing. Make sure that the external silicone wall sealing plate is properly inserted in the wall.
N.B.: for proper system operation the terminal
with grid must be installed correctly ensuring that, the “high” indication on the terminal is observed during installation.
Horizontal intake-exhaust kit Ø 60/100. Kit assembly (Fig. 1-12): install the bend with ange (2) on the central hole of the boiler, positioning gasket (1) with the circular projections down­wards in contact with the boiler flange, and tighten using the screws present in the kit. Fit the Ø 60/100 (3) concentric terminal pipe with the male side (smooth) to the female side of the bend (2) up to the end stop; making sure that the internal and external wall sealing plate have been tted, this will ensure sealing and joining of the elements making up the kit.
Extensions for Ø 60/100 horizontal kit (Fig. 1-13). e kit with this conguration can be extended up to a max. 12.9 horizontal m in- cluding the terminal with grid and excluding the concentric bend leaving the boiler. is conguration corresponds to a resistance factor of 100. In this case the special extensions must be requested.
Immergas also provides a Ø 60/100 simplied terminal, which in combination with its ex­tension kits allows you to reach a maximum extension of 11.9 metres.
Horizontal intake-exhaust kit Ø 80/125. Kit assembly (Fig. 1-14): to install the kit Ø 80/125 one must use the anged adapter kit in order to install the ue system Ø 80/125. Install the anged adaptor (2) on the central hole of the boiler, positioning gasket (1) with the circular projections downwards in contact with the boiler ange, and tighten using the screws contained in the kit. Engage the bend (3) with the male side (smooth) to the end stop on the adapter (1). Fit the Ø 80/125 (5) concentric terminal pipe with the male side (smooth) to the female side of the bend (4) (with lip seals) up to the end top; making sure that the internal (6) and external wall sealing plate (7) have been tted, this will ensure sealing and joining of the elements making up the kit.
Extensions for horizontal kit Ø 80/125 (Fig. 1-15). e kit with this conguration can be extended up to a max. length of 32 m, includ­ing the terminal with grid and excluding the concentric bend leaving the boiler. If addi­tional components are assembled, the length equivalent to the maximum allowed must be subtracted. In this case the special extensions must be requested.
INSTALLERUSER
2
1
3
4
e kit includes: N° 1 - Gasket (1) N° 1 - Concentric bend Ø 60/100 (2) N° 1 - Int./exhaust concentric terminal Ø 60/100 (3) N° 1 - Internal wall sealing plate (4) N° 1 - External wall sealing plate (5)
5
3
2
1
e adaptor kit includes: N° 1 - Gasket (1) N° 1 - Adaptor Ø 80/125 (2)
1-14
4
5
6
e Kit Ø 80/125 includes: N° 1 - Concentric bend Ø 80/125 a
87° (3)
N° 1 - Int./exhaust concentric termi-
nal Ø 80/125 (4) N° 1 - Internal wall sealing plate (5) N° 1 - External wall sealing plate (6) e remaining kit components must not be used
C
13
Max. 12900 mm
Max. 12790 mm
1-12 1-13
C
13
Max. 32000 mm
Max. 31956 mm
C
C
1-15
13
MAINTENANCE TECHNICIAN
13
13
13
Page 14
1.14 CONCENTRIC VERTICAL KIT INSTALLATION.
Type C configuration, sealed chamber and fan assisted.
Concentric vertical intake and exhaust kit. is vertical terminal is connected directly to the out­side of the building for air intake and ue exhaust.
N.B.: the vertical kit with aluminium tile enables installation on terraces and roofs with a maxi­mum slope of 45% (approx 25°) and the height between the terminal cap and half-shell (374 mm
INSTALLERUSER
for Ø 60/100 and 260 mm for Ø 80/125) must always be observed.
Vertical kit with aluminium tile Ø 60/100.
Kit assembly (Fig. 1-16): install the concentric ange (2) on the central hole of the boiler, posi­tioning gasket (1) with the circular projections downwards in contact with the boiler ange, and tighten using the screws contained in the kit. Installation of the fake aluminium tile: replace the tiles with the aluminium sheet (4), shaping it to ensure that rainwater runs o. Position the xed half-shell (6) on the aluminium tile and in­sert the intake-exhaust pipe (5). Fit the Ø 60/100
(3) concentric terminal pipe with the male end (5) (smooth) into the ange (2) up to the stop; making sure that the wall sealing plate has been tted (3), this will ensure sealing and joining of the elements making up the kit.
NOTE: when the boiler is installed in areas where very cold temperatures can be reached, a special anti-freeze kit is available that can be installed as an alternative to the standard kit.
Extensions for vertical kit Ø 60/100 (Fig. 1-17). e kit with this conguration can be extended to a max. straight vertical length of 14.4 m, including the terminal. This configuration corresponds to a resistance factor of 100. In this case specic extensions must be requested.
Vertical kit with aluminium tile Ø 80/125.
Kit assembly (Fig. 1-18): to install the kit Ø 80/125 one must use the anged adapter kit in order to install the ue system Ø 80/125. Install the anged adaptor (2) on the central hole of the boiler, positioning gasket (1) with the circular projections downwards in contact with the boiler ange and tighten using the screws contained in the kit. Installation of the fake aluminium
tile: replace the tiles with the aluminium sheet (4), shaping it to ensure that rainwater runs o. Position the xed half-shell (5) on the aluminium tile and insert the intake-exhaust pipe (7). Fit the Ø 80/125 concentric terminal pipe with the male side (smooth) to the female side of the adapter (1) (with lip gaskets) up to the end stop; making sure that the wall sealing plate (3) has been tted, this will ensure sealing and joining of the elements making up the kit.
Extensions for vertical kit Ø 80/125 (Fig. 1-19). e kit with this conguration can be extended up to a max. length of 32 m including the ter­minal. If additional components are assembled, the length equivalent to the maximum allowed must be subtracted. In this case specic exten­sions must be requested.
MAINTENANCE TECHNICIAN
1-16
C
5
4
3
2
1
7
6
e Kit includes: N° 1 - Gasket (1) N° 1 - Female concentric ange (2) N° 1 - Wall sealing plate (3) N° 1 - Aluminium tile (4) N° 1 - Int./exhaust concentric pipe Ø
60/100 (5) N° 1 - Fixed half-shell (6) N° 1 - Mobile half-shell (7)
C
e adaptor kit includes:
7
6
5
4
3
N° 1 - Gasket (1) N° 1 - Adaptor Ø 80/125 (2)
e Kit Ø 80/125 includes: N° 1 - Wall sealing plate (3) N° 1 - Aluminium tile (4) N° 1 - Fixed half-shell (5) N° 1 - Mobile half-shell (6) N° 1 - Int./exhaust concentric
pipe Ø 80/125 (7) e remaining kit components must not be used
1-17
33
C
33
Max. 14400 mm
1-191-18
33
C
33
Max. 32000 mm
2
1
14
14
Page 15
1.15 SEPARATOR KIT INSTALLATION. Type C configuration, sealed chamber and fan assisted.
Separator kit Ø 80/80. is kit allows air to come
in from outside the building and the exhaust to exit from the chimney, ue or intubated duct through divided ue exhaust and air intake pipes. Combustion products are expelled from pipe (S) (in plastic, so as to resist acid condensate). Air is taken in through duct (A) for combustion (this is also in plastic). e intake pipe (A) can be installed either on the right or le hand side of the central exhaust pipe (S). Both ducts can be routed in any direction.
Kit assembly (Fig. 1-20): install ange (4) on the central hole of the boiler, positioning gasket (1) with the circular projections downwards in contact with the boiler ange, and tighten using the hex screws with at tip contained in the kit. Remove the at ange present in the lateral hole with respect to the central one (according to needs) and replace it with the ange (3), positioning the gasket (2) already present in the boiler and tighten using the supplied self-threading screws. Fit the male end (smooth) to the bends (5) in the female end of the anges (3 and 4). Fit the intake terminal (6) with the male side (smooth) in the female side of the bend (5) up to the end stop, ensuring that the internal and external wall sealing plates are tted. Fit the exhaust pipe (9) with the male side (smooth) to the female side of the bend
(5) up to the end stop; making sure that the internal wall sealing plate has been tted, this will ensure sealing and joining of the elements making up the kit.
Installation clearances (Fig. 1-21). e mini­mum installation clearance measurements of the Ø 80/80 separator terminal kit have been stated in some limit conditions.
Extensions for separator kit Ø 80/80. The maximum vertical straight length (without bends) that can be used for Ø 80 intake and exhaust pipes is 41 metres, regardless from whether they are used for intake or exhaust. e maximum horizontal straight length (with bend in suction and in exhaust) that can be used for Ø 80 intake and exhaust pipes is 36 metres, regardless from whether they are used for intake or exhaust.
N.B.: to favour the removal of possible conden­sate forming in the exhaust pipe, tilt the pipes towards the boiler with a minimum slope of
1.5% (Fig. 1-22).
INSTALLERUSER
C53* - C
5
5
7
S
9
4
1
e kit includes: N° 1 - Exhaust gasket (1) N° 1 - Flange seal gasket (2) N° 1 - Female intake ange (3) N° 1 - Female drain ange (4)
* to er complete C53 conguration also provide for a roof discharge termi-
nal.
6
7
8
A
3
2
N° 2 - Bend 90° Ø 80 (5) N° 1 - Intake terminal Ø 80 (6) N° 2 - Internal wall sealing plates (7) N° 1 - External wall sealing plate (8) N° 1 - Drain pipe Ø 80 (9)
1-211-20
83
C
43
MAINTENANCE TECHNICIAN
C
83
minimum slope 1.5%
15
15
1-22
Page 16
1.16 ADAPTOR C9 KIT INSTALLATION.
is kit allows to install an Immergas boiler in conguration "C93", achieving the combustion air intake directly from the sha featuring the fumes exhaust, obtained by means of a ducting system.
System composition.
e system must be combined with the following components (sold separately) to be functional and complete:
- kit C93 version Ø 100 or Ø125
- ducting kit Ø 60 or Ø 80
INSTALLERUSER
- fumes exhaust kit Ø 60/100 or Ø 80/125 con­gured according to the installation and type of boiler.
Kit Assembly.
- Mount the components of kit "C9" on the door (A) of the ducting system (Fig. 1-24).
- (Version Ø 125 only) mount the anged adap- tor (11) interposing the concentric gasket (10) on the boiler, tting it with the screws (12).
- Mount the ducting system as described in the relative instructions sheet.
- Calculate the distances between the boiler drain and the bend of the ducting system.
- Prepare the boiler ue system, making sure that the internal pipe of the concentric kit is tted properly in the bend of the ducting system (quota "X" g. 1-25), while the external pipe must be tted on the adaptor until it stops (1).
N.B.: to encourage the removal of possible
condensate forming in the exhaust pipe, tilt the pipes towards the boiler with a minimum slope of 1.5%.
- Mount the cover (A) complete with adaptor (1) and caps (6) on the wall and assemble the ue system to the ducting system.
N.B.: (version Ø 125 only) before assembly check the gaskets are in the right position. In the event component lubrication (already carried out by the manufacturer) is not sucient, remove the residual lubricant using a dry cloth, then to ease tting coat the parts with common or industrial talc.
Once all components have been assembled prop­erly, the exhaust fumes will be expelled via the ducting system; the combustion air for normal boiler operation will be aspirated directly by the sha (Fig. 1-25).
Technical data.
- e dimensions of the shas must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the sha: 30 mm for circular section shas and 20 mm in the event of a square section sha (Fig. 1-23).
- Maximum 2 changes of direction are allowed on the vertical section of the ue system with a maximum clearance angle of 30° with respect to the vertical.
- e maximum vertical extension using a Ø 60 ducting system is 13 m, the maximum extension includes 1 bend Ø 60/10 at 90°, 1 m of horizontal pipe 60/100, 1 90° ducted bend Ø 60 and the roof terminal for ducting.
To determine the C93 ue system in congu-
rations other than that described (Fig. 1-25) one must consider that 1 metre of ducted pipe according to the indications described has a resistance factor equal to 4.9.
- e maximum vertical extension using a Ø 80 ducting system is 28 m, the maximum exten­sion includes 1 adapter 60/100 to 80/125, 1 87° bend Ø 80/125, 1 m of horizontal pipe 80/125, 1 90° ducted bend Ø 80 and the roof terminal for ducting.
To determine the C93 ue system in congura-
tions other than that described (Fig. 1-25) one must consider the following pressure drops:
- 1 m of concentric pipe Ø 80/125 = 1 m of
ducted pipe;
- 1 87° bend = 1.4 m of ducted pipe;
Consequently one must subtract the equivalent
length of the part added to the 28 m available.
1-23
A
B
Kit composition:
Ref. Qty Description
MAINTENANCE TECHNICIAN
1 1 Door adaptor Ø 100 or Ø 125 2 1 Door gasket made of neoprene 3 4 Screws 4.2 x 9 AF 4 1 Hex headed screw M6 x 20 5 1 Flat nylon washer M6 6 2 Door hole closure metal-sheet plate
7 1 Plug gasket made of neoprene 8 1 Toothed washer M6
9 1 Nut M6 10 1 (kit 80/125) Concentric gasket Ø 60-100 11 1 (kit 80/125) Flanged adapter Ø 80-125) 12 4 (kit 80/125) Hex headed screws M4 x 16 slotted
- 1 (kit 80/125) Bag of lubricating talc
Supplied separately:
Ref. Qty Description
A 1 Ducting kit door
plug
1
4
Rigid Ø 80
ducting (A)
mm
86 126 146
Flexible Ø 80
ducting (A)
mm
90 130 150
2
3
6
5
SHAFT (B) mm
SHAFT (B) mm
7
SHAFT
(C) mm
SHAFT
(C) mm
A
6
8
1-24
9
Rigid Ø 60
ducting (A)
mm
66 106 126
A
C
SHAFT (B) mm
Installation drawings key:
Unique identication of the component in
1
the kit Identication of the component not supplied
in this kit
A
12
SHAFT
(C) mm
3
3
12
11
10
16
16
Page 17
C
93
X
C
53
INSTALLERUSER
1.17 DUCTING OF FLUES OR TECHNICAL SLOTS.
Ducting is an operation through which, via the introduction of one or more relevant pipes, one achieves a system for the evacuation of the combustion products of a gas appliance, made up from the coupling of an existing or new ducting pipe with a chimney, ue or technical slot (also in new buildings) (Fig. 1-26). Ducting requires ducts declared to be suitable for the purpose by the manufacturer, following the installation and user instructions provided by the manufacturer and the requirements of the local standards in force.
Immergas ducting system. e Ø 60 rigid and Ø 80 exible “Green Range” ducting systems must only be used for domestic use and with Immergas condensing boilers.
In any case, ducting operations must respect the provisions contained in the standard and in current technical regulations; in particular, the declaration of conformity must be compiled at the end of work and on commissioning of the ducted system. e instructions in the project or technical report must likewise be followed, in cases provided for by the standard and current technical regulations. e system or components of the system have a technical life complying with current standards, provided that:
- it is used in average atmospheric and envi-
ronmental conditions, according to current regulations (absence of fumes, dusts or gases that can alter the normal thermophysical or chemical conditions; existence of temperatures coming within the standard range of daily variation, etc.).
- Installation and maintenance must be per-
formed according to the indications supplied by the manufacturer and in compliance with the regulations in force.
- e maximum length specied by the manu-
facturer must be respected; in this regard:
- the max. possible length of the Ø 60 exible
ducting vertical section is equal to 22 m. is length is obtained considering the complete Ø 80 exhaust terminal, 1m of Ø 80 pipe in exhaust, two 90° Ø 80 bends at boiler outlet.
1-25
- e max. possible length of the Ø 80 exi­ble ducting vertical section is equal to 30 m. is length is obtained considering the complete exhaust terminal, 1m of Ø 80 pipe in exhaust, two 90° Ø 80 bends at boiler outlet for connecting to the ducting system and two direction changes of the exible hose inside the chimney/technical slot.
- e maximum possible length of the Ø 80 rigid ducting vertical section is equal to 30 m. is length is obtained considering the complete Ø 80 exhaust terminal, 1m of Ø 80 pipe in exhaust, two 90° Ø 80 bends on the boiler outlet.
1.18 CONFIGURATION TYPE B,
OPEN CHAMBER AND FORCED DRAUGHT FOR INDOORS.
e appliance can be installed inside buildings in 23 or B53 mode; in this case, all technical rules and national and local regulations in force, must be complied with.
- type B open chamber boilers must not be
installed in places where commercial, artisan or industrial activities take place, which use products that may develop volatile vapours or substances (e.g. acid vapours, glues, paints, sol­vents, combustibles, etc.), as well as dusts (e.g. dust deriving from the working of wood, coal nes, cement, etc.), which may be harmful for the components of the appliance and jeopardise operation.
- in B23 and B53 conguration the boilers must
not be installed in bedrooms, bathrooms or bedsits, unless otherwise provided for by local regulations in force. They must neither be installed in rooms containing solid fuel heat generators nor in rooms communicating with said rooms.
- e installation of appliances in B23 and B53
congurations are only recommended in places that are not lived in and which are permanently ventilated.
e suitable kit referred to in paragraph 1.12 must be used for installation 1.12.
1-26
1.19 FLUE EXHAUST TO FLUE/CHIMNEY.
Flue exhaust does not necessarily have to be connected to a branched type traditional ue. e ue exhaust, for boiler clots installed in C configuration, can be connected to a special LAS type multiple ue. For B congurations, exhaust is only allowed into individual chimney or directly into the external atmosphere via a suitable terminal, unless otherwise provided for by local regulations in force. e multiple ues and the combined ues must also only be connected to type C appliances of the same type (condensing), having nominal heat inputs that do not dier by more than 30% less with respect to the maximum that can be attached and powered by the same fuel. The thermo-fluid dynamic features (ue ow rate, % of carbon dioxide, %
humidity etc....) of the appliances attached to
the same multiple ues or combined ues, must not dier by more than 10% with respect to the average boiler attached. Multiple and combined ues must be specially designed according to the calculation method and requirements of the technical standards in force, by a professionally qualied company. Chimney or ue sections for connection of the ue exhaust pipe must comply with requisites of technical standards in force.
1.20 FLUES, CHIMNEYS, CHIMNEY POTS AND TERMINALS.
e ues, chimneys and chimney pots for the evacuation of combustion products must be in compliance with applicable standards. Chimneys and roof-installed exhaust terminals must com­ply with the outlet height and with the distance from technical volumes set forth by the technical standards in force.
Positioning the wall ue exhaust terminals. e wall ue exhaust terminals must:
- be installed on external perimeter walls of the
building;
- be positioned according to the minimum dis-
tances specied in current technical standards.
MAINTENANCE TECHNICIAN
17
17
Page 18
Combustion products exhaust of natural draught or fan assisted appliances in open-top closed environments. In spaces closed on all
sides with open tops (ventilation pits, court­yards etc.), direct combustion product exhaust is allowed for natural draught or fan assisted gas appliances with a heat input range from 4 to 35 kW, provided the conditions as per the current technical standards are respected.
1.21 WATER TREATMENT SYSTEM
INSTALLERUSER
MAINTENANCE TECHNICIAN
FILLING.
As already mentioned in the previous para­graphs, a treatment of the thermal and domestic system water is required, in compliance with the local standards in force.
e parameters that inuence the duration and proper operation of the heat exchanger are the water's PH, hardness, conductivity, and oxygen, together with the system's processing residues (any welding residues), any oil present and cor­rosion products that can, in turn, cause damage to the heat exchanger.
In order to prevent this from happening, you are recommended to:
- Before installation on new systems as well as old ones, clean the system with clean water to eliminate solid residues contained therein.
- Clean the system with a chemical treatment:
- Cle an the new system with a suitable cleaning
device (for example Sentinel X300, Fernox Cleaner F3 or Jenaqua 300) combined with thorough washing.
- Clean the old system with a suitable cleaning
device (for example Sentinel X400 or X800, Fernox Cleaner F3 or Jenaqua 400) combined with thorough washing.
- Check the maximum hardness and quantity of lling water referring to the graphics (Fig. 1-27). If the contents and hardness of the wa­ter are below the indicated curve, no specic treatment is required; otherwise, to limit the content of calcium carbonate, you must provide for water-lling treatment.
- For lling, you are not allowed to use water soened with the use of ionic-exchange resins or distilled water.
- Should you be required to provide for water treatment, this should be carried out by completely desalinating the lling water. As opposed to the complete soening process, desalinating the water completely not only removes hardening agents (Ca, Mg), but also eliminates all other minerals to reduce wa­ter-lling conductivity up to 10 microsiemens/ cm. Given its low conductivity, desalinated water does not only prevent the formation of lime scale, but also serves as protection against corrosion.
- Insert a suitable inhibitor / passivator (for example Sentinel X100, Fernot Protector F1, or Jenaqua 100); if required, also insert appro­priate antifreeze (such as for example Sentinel X500, Fernox Alphi 11 or Jenaqua 500).
- Check electrical conduction of the water, which should not be lower than 2000 µs/cm in the case of treated water and lower than 600 µs/cm in the case of non-treated water.
- To prevent corrosion, the water system's PH should be between 6.5 and 8.5.
- Check the maximum content of chlorides, which should be less than 250 mg/l.
N.B.: for quantities and methods of use of wa­ter-treatment products, refer to the instructions provided by their manufacturer.
1.22 SYSTEM FILLING.
Once the boiler is connected, proceed with system lling via the lling cock (Fig. 1-29 and 1-3). Filling is performed at low speed to ensure release of air bubbles in the water via the boiler and heating system vents. e boiler has a built-in automatic venting valve on the circulator. Check if the cap is loose. Open the radiator vent valves. Close radiator vent valves when only water escapes from them. Close the lling cock when the boiler pressure gauge indicates approx. 1.2 bar.
N.B.: during these operations, enable the au­tomatic vent functions on the boiler (active on rst ignition). Vent the boiler circulation pump
by loosening the front cap and keeping the motor running. Tighten the cap aer the operation.
1.23 CONDENSATE TRAP FILLING.
On rst lighting of the boiler, ue gas may come out the condensate drain; aer a few minutes’ operation check that this no longer occurs. is means that the drain trap is lled with conden­sate to the correct level preventing the passage of ue gas.
1.24 GAS SYSTEM STARTUP.
To start up the system, refer to the technical standard in force. In particular, for new gas systems:
- open windows and doors;
- avoid presence of sparks or open ames;
- bleed all air from the pipelines;
- check that the internal system is properly sealed according to the specications set forth by technical regulations in force.
System water litres
1.25 BOILER START UP IGNITION.
To commission the boiler (the operations listed below must only be performed by a qualied rm and without any unauthorised persons):
- check that the internal system is properly sealed according to the specications set forth by technical regulations in force;
- ensure that the type of gas used corresponds to the boiler settings (the type of gas appears on the display on rst electrical supply voltage, or by checking the relative parameter “G”);
- check connection to a 230V-50Hz power mains, correct L-N polarity and earthing con­nection;
- check that there are external factors that may cause the formation of fuel pockets;
- switch the boiler on and check correct ignition;
- make sure that the gas ow rate and relevant pressure values comply with those given in the manual (Par. 3.22);
- ensure that the safety device intervenes in the event of gas supply failure and check the relative intervention time;
- check the intervention of the main switch located upstream from the boiler and in the boiler;
- check that the intake and/or exhaust terminals (if tted) are not blocked.
- Carry out the flue test and set the relative parameter “F0”.
e boiler must not be started up even if only one of the checks should be negative.
N.B.: the graph refers to the entire life cycle of the system. erefore, also consider sched­uled and unscheduled mainte­nance, which involves emptying and lling the said system.
Water hardness °F
18
18
1-27
Page 19
1.26 CIRCULATION PUMP.
e boilers are supplied with a variable speed circulator pump.
During the heating stage the Auto and Fixed operating modes are available.
• Auto (default): Automatic circulator pump
speed and proportional head: e automatic circulator pump speed varies according to the power emitted by the burner; the greater the power, the greater the speed. Moreover, within the parameter, one can also adjust the circulator pump operating range by setting the maximum speed “A3” parameter (adjustable from 5 to 9) and the “A4” minimum speed parameter (adju­stable from 5 to the max. set speed).
Fixed (5 ÷ 9): by setting parameters “A3” and
“A4” at the same value, the pump operates at constant speed.
N.B.: for the boiler to work properly, it is not allowed to drop below the minimum value indicated above.
In domestic hot water mode, the circulator pump always runs at full speed.
Pump release. If, aer a prolonged period of inactivity, the circulation pump is blocked, turn the motor sha using a screwdriver. Take great care during this operation to avoid damage to the motor.
By-pass Regulation (part. 26 Fig. 1-29). e boiler leaves the factory with the by-pass open. If necessary, the by-pass can be regulated to system requirements from minimum (by-pass closed) to maximum (by-pass open). Adjust using a at head screwdriver, turn clockwise and open the by-pass, anticlockwise it is closed.
1.27 KITS AVAILABLE ON REQUEST.
System shut-off valve kits with or without inspection lter (on request). e boiler is designed for installation of system interception cocks to be placed on ow and return pipes of the connection assembly. is kit is very useful for maintenance because it allows to empty just the boiler without having to empty the entire system. Moreover, the version with lter preserves the functioning characteristics of the boiler thanks to its inspectionable lter.
System zone control unit kit (on request). If the heating system is to be divided into several zones (max. three), in order to interlock them with separate adjustments and to keep water ow rate high for each zone, Immergas supplies zone system kits by request.
Polyphosphate dispenser kit (on request). e polyphosphate dispenser reduces the formation of lime-scale and preserves the original heat exchange and domestic hot water production conditions. e boiler is prepared for applica­tion of the polyphosphate dispenser kit.
Relay board (on request). e boiler is prepared for the installation of a relay card that allows to increase the features of the appliance and therefore functioning possibilities.
Cover kit (on request). If installed outdoors in a partially protected place with direct air intake,it is compulsory to mount the appropriate top protection cover for the correct functioning of the boiler and to protect it from adverse weather conditions.
Cycloidal lter kit (on request). e magnetic cycloidal filter is able to detect the ferrous residues present in the system's water. anks to the two cocks in the kit, it facilitates main­tenance by cleaning the lter without having to empty the circuit.
e above-mentioned kits are supplied complete with instructions for assembly and use.
INSTALLERUSER
Total head available to the system.
Head (kPa)
Speed 9
Speed 5
Speed 9
MAINTENANCE TECHNICIAN
Circulator pump absorbed power (W)
Flow rate (l/h)
A+B = Head available with by-pass closed B = Head available with by-pass open C+D = Power absorbed by the pump with by-pass open (dotted area) D = Power absorbed by the pump with by-pass closed (dotted area)
19
19
1-28
Page 20
1.28 BOILER COMPONENTS.
INSTALLERUSER
1-29
MAINTENANCE TECHNICIAN
Key: 1 - System lling valve 2 - System draining valve 3 - DHW heat exchanger 4 - Gas valve 5 - Domestic hot water probe 6 - Condensate drain trap 7 - Domestic hot water ow switch 8 - System expansion vessel 9 - Air / gas mixer 10 - Flow probe 11 - Manual air vent valve 12 - Ignition / detection electrode 13 - Sample points (air A) - (ue gas F)
20
20
14 - Flue probe 15 - Burner cover 16 - Safety ow probe 17 - Condensation module 18 - Fan 19 - System pressure switch 20 - Vent valve 21 - Boiler circulator pump 22 - 3 bar safety valve 23 - 3-way valve (motorised) 24 - By-pass 25 - 3-bar safety valve drain tting signal
Page 21
USE AND MAINTENANCE
2
INSTRUCTIONS
2.1 CLEANING AND MAINTENANCE. Attention: to preserve the boiler’s integrity and
keep the safety features, performance and relia­bility which distinguish it unchanged over time, maintenance operations must be carried out on a yearly basis in compliance with that stated in the “annual check and maintenance of the appliance” section, in compliance with national, regional, or local standards in force.
2.2 GENERAL WARNINGS.
Never expose the wall-mounted boiler to direct vapours from a cooking surface.
Use of the boiler by unskilled persons or children is strictly prohibited.
For safety purposes, check that the air intake/ ue exhaust terminals (if tted) are not blocked. If temporary shutdown of the boiler is required, proceed as follows: a) drain the heating system if antifreeze is not
used;
b) shut-o all electrical, water and gas supplies.
In the case of work or maintenance to structures near ducting or devices for ue extraction and the relative accessories, switch o the appliance and on completion of the operations make sure that an authorised company veries the eciency of the ducting or the devices. Never clean the appliance or connected parts with easily ammable substances. Never leave containers or ammable substances in the same environment as the appliance.
Attention: the use of components involving use
of electrical power requires some fundamental rules to be observed:
- do not touch the appliance with wet or moist parts of the body; do not touch when bare­foot;
- never pull electrical cables or leave the appli­ance exposed to weathering (rain, sunlight, etc.);
- the appliance power cable must not be re­placed by the user;
- if the cable is damaged, switch o the ap­pliance and solely contact an authorised company to replace it;
- if the appliance is not to be used for a certain period, disconnect the main power switch.
N.B.: the temperatures indicated by the display have a tolerance of +/- 3°C due to environmental conditions that cannot be attributed to the boiler.
At the end of its service life the appliance must not be disposed of like normal household waste nor abandoned in the environment, but must be removed by a professionally authorised company. Contact the manufacturer for disposal instructions.
INSTALLERUSER
2.3 CONTROL PANEL.
2-1
Key: 1 - Domestic hot water temperature selector 2 - Reset button 3 - Summer / Winter Button 4 - Central heating temperature selector 5 - Information button 6 - O / Stand-by / On button 7 - Boiler manometer 8 - DHW production phase operating mode
active
9 - Boiler in block requiring unblock via
“RESET” button
10 - Flame presence symbol and relative
power scale 11 - Functioning in summer mode 12 - Functioning in winter mode 13 - Room central heating phase operating
mode active 14 - Temperature indicator, boiler info and
error codes
MAINTENANCE TECHNICIAN
15 - Boiler in Stand-by mode 16 - Presence of external connected devices 17 - Solar function active 18 - Functioning with external temperature
probe active (optional)
19 - Boiler connected to remote control V2
(optional)
20 - Not used on this model
21
21
Page 22
2.4 USING THE BOILER.
Before ignition make sure the heating system is lled with water and that the manometer (7) indicates a pressure of 1 ÷ 1.2 bar.
- Open the gas cock upstream from the boiler.
- Press the button (6) until the display switches on. e boiler now returns to the state prior to switch-o.
- If the boiler is in stand-by, press the button (6) again to activate it. If this is not the case, go to the next point.
INSTALLERUSER
- en press the button (3) in sequence and set
the boiler in the summer ( ) or winter ( ) position.
Summer ( ): in this mode the boiler only works to produce DHW; the temperature is set via the selector (1) and the relative temperature is shown on the display via the indicator (14).
• Winter ( ): in this mode the boiler works both for producing domestic hot water and for central heating. e temperature of the DHW is always regulated via the selector (1), the heating temperature is regulated via selector (4) and the relative temperature is shown on the display via the indicator (14).
From this moment the boiler functions automat­ically. With no demand for heat (central heating or domestic hot water production) the boiler goes to “standby” function, equivalent to the boiler being powered without presence of ame. Each time the burner ignites, the relative ame present symbol is displayed (10) with relative output scale.
Operation with Comando Amico RemotoV2 (CARV2) (Optional). If the CARV2 is connected,
the ( ) symbol will appear on the display. e boiler regulation parameters can be set via the CARV2 control panel and the reset button (2) remains active on the boiler control panel, along with the switch-off button (6) (“off” mode only) and the display where the func­tioning state is shown.
Caution: if the boiler is switched “o” the
CARV2 will display the connection error symbol “ERR>CM”, the CARV2 is however powered constantly so as not to lose the stored programs.
Solar operating mode ( ). is function is activated automatically id the boiler detects a probe on the DHW inlet (optional) or if the
MAINTENANCE TECHNICIAN
“Solar ignition delay” parameter is more than 0 seconds.
During a withdrawal, if the outlet water is hot
enough or if there is “Solar ignition delay” time, the boiler does not switch on, the D.H.W. with-
drawal symbol ( ) appears on the display along with the ashing solar function symbol
( ).
When the water supplied by the solar system
is at a temperature lower than what is set, or if the “Solar ignition delay” time has elapsed, the boiler switches on. At this point, the solar function symbol will go o.
Operation with optional external probe ( ). In the case of a system with optional
external probe, the boiler ow temperature for room central heating is managed by the external probe depending on the external temperature measured (Par. 1.9). The flow
temperature can be modied by selecting the functioning curve via the selector switch (4) (or on the CARV2 control panel, if connected to the boiler) selecting a value from “0 to 9”.
With external probe present, the relative
symbol (18) will appear on the display. In the central heating phase, if the temperature of the water contained in the system is sucient to heat the radiators, the boiler can only function with the activation of the pump.
“Stand-by” mode. Press button (6) repeatedly
until the symbol ( ) appears. From now on the boiler remains inactive and the anti-freeze function, pump anti-block function and 3-way and signalling of any anomalies is guaranteed.
N.B.: in these conditions the boiler is still
powered.
“O” mode. By holding the button (6) down
for 8 seconds, only the central point remains lit on the display, and the boiler is o completely. e safety functions are not guaranteed in this mode.
N.B.: in these conditions the boiler is consid-
ered still live even if there are no functions active.
“Automatic vent” mode. When the function
is enabled, every time the boiler is electrically powered, the system automatic vent function is activated (lasting 8 minutes). is function is displayed via a countdown signalled by the indicator (14). During this period the DHW and CH functions are not active.
e “automatic vent” can be annulled by press-
ing the “reset” button (2).
Display operation. e display lights up while
the control panel is being used; aer a set in­activity period, the brightness drops until only the active symbols are displayed. e lighting mode can be varied via parameter t8 in the P.C.B. programming menu.
2222
Page 23
2.5 TROUBLESHOOTING.
e Victrix TT boiler reports any anomalies via a code shown on the boiler display (14) according to the following table:
Error Code
01 No ignition block
02
03
04
05 Flow probe anomaly e board detects an anomaly on the ow NTC probe. e boiler does not start (1)
06
08 Maximum N° of reset Number of allowed resets that have already performed.
10
15 Conguration error
16 Fan anomaly is occurs if the fan has a mechanical or electrical fault. Press the Reset button (1)
20 Parasite ame block
24
29 Flue probe anomaly e board detects an anomaly on the ue gas probe e boiler does not start (1)
31
36
37
38 Loss of ame signal
43
44
46
(1) If the shutdown or fault persists, contact an authorised company (e.g. Authorised Technical Aer-Sales Service). (2) e anomaly can only be veried in the list of errors in the “Information” menu
Anomaly signalled Cause Boiler status / Solution
In the event of request of room central heating or domestic hot
Safety thermostat block (over-temper­ature)
Flue safety thermostat block
Contacts resistance block
Domestic hot water probe anomaly
Insucient system pressure
Push button control panel anomaly
Loss of remote control communication
IMG Bus communica­tion loss
Low power supply voltage
Block due to loss of ame signal
Block for exceeding the maximum accumulat­ed time, close gas valve opening
Low temperature safety thermostat (optional)
water production, the boiler does not switch on within the preset time. Upon appliance commissioning or aer extended downtime, it may be necessary to eliminate the block.
During normal operation, if a fault causes excessive overheating internally, the boiler goes into overheating block.
During normal operation, if a fault causes excessive ue gas overheat­ing, the boiler blocks
e P.C.B. detects an anomaly on the gas valve supply. Check the connection. (the anomaly is detected and displayed only in the event of a request).
e board detects an anomaly on the domestic hot water NTC probe. In this case the antifreeze function is also inhibited
Water pressure inside the central heating circuit that is sucient to guarantee the correct operation of the boiler is not detected.
If the board detects an anomaly or incongruity on the electric wiring, the boiler will not start.
is occurs in the event of a leak on the detection circuit or anomaly in the ame control unit.
e board detects an anomaly on the pushbutton panel.
is occurs if an incompatible remote control is connected, or if communication between the boiler and the remote control is lost.
Communication between the various components is interrupted due to an anomaly on the boiler control unit, on the zone control unit or on the IMG Bus.
is occurs when the power supply voltage is lower than the allowed limits for the correct boiler operation.
is occurs when the boiler is ignited correctly and the burner ame switches o unexpectedly; a new attempt at ignition is performed and if normal conditions are restored, the boiler does not have to be reset.
is occurs if the ''Flame signal loss'' error occurs many times in a row within a preset period (38).
is occurs if the gas valve remains open for longer than required for normal operation, without the boiler switching on.
During normal operation, if an anomaly causes excessive overheating of the ow temperature in low temperature conditions, the boiler blocks.
Press the Reset button (1)
Press the Reset button (1)
Press the Reset button (1)
Press the Reset button (1)
In this case the boiler continues to produce domestic hot water but not with optimal performance (1)
Attention: the anomaly can be reset 5 times consecutively, aer which the function in inhibited for at least one hour. One attempt is gained every hour for a maximum of 5 attempts. By switching the appliance on and o again, the 5 attempts are re-acquired.
Check on the boiler pressure gauge (1) that the system pressure is between 1÷1.2 bar and restore the correct pressure if necessary.
If normal conditions are restored the boiler restarts without having to be reset. Check that the boiler is congured correctly (1)
Press the Reset button (1)
If normal conditions are restored the boil­er restarts without having to be reset (1).
Power cycle the boiler. If the Remote Con­trol is still not detected on re-starting the boiler will switch to local operating mode, i.e. using the controls on the control panel. In this case the “Central Heating” (1) mode cannot be activated.
e boiler does not satisfy the room heating requests (1).
If normal conditions are restored the boiler restarts without having to be reset (1)
If normal conditions are restored the boiler restarts without having to be reset (1) (2)
Press the Reset button, before restarting, the boiler will run a post-ventilation cycle. (1)
Press the Reset button (1)
In this case, after suitable cooling, it is possible to reset the thermostat (see relative instructions sheet). (1).
INSTALLERUSER
MAINTENANCE TECHNICIAN
2323
Page 24
Error Code
47
51
59
INSTALLERUSER
60
61 Air in circulator pump Air is detected inside the pump; the pump cannot work.
62
72
73
74
77
78
79
80
84
87 Block - gas valve control
88 Block - gas valve control
89
90
MAINTENANCE TECHNICIAN
91 Incorrect ignition block
92
93
94 Combustion anomaly
95
96 Clogged ue
98
99 General block A boiler anomaly has been detected Press the Reset button (1)
(1) If the shutdown or fault persists, contact an authorised company (e.g. Authorised Technical Aer-Sales Service). (2) e anomaly can only be veried in the list of errors in the “Information” menu
Anomaly signalled Cause Boiler status / Solution
Burner power limi­tation
CAR Wireless commu­nication failure
Main supply voltage frequency block
Anomaly pump blocked
Complete calibration required
Fast calibration re­quired
High ow probe and safety ow probe devi- ation detected.
Safety ow probe anomaly
Combustion control anomaly
Combustion control anomaly
Combustion control anomaly
P.C.B. malfunction block
Combustion anomaly
- power reduction in progress
Combustion signal un­stable
Combustion signal be­yond limit
Fan revs correction limit
Combustion signal be­yond limit
Combustion signal dis­continuous
Block - maximum no. of soware errors
Should ue high temperature be detected, the boiler reduces power supplied so as not to damage it.
If there is no communication between the boiler and Wireless version CAR, an anomaly is signalled. From this moment, it is only possible to control the system by means of the control panel of the boiler itself.
e board detects a main supply voltage frequency anomaly e boiler does not start (1)
e pump is stopped due to one of the following causes:
Impeller blocked, electrical fault.
Missing calibration is detected by the P.C.B. It may occur in the event the P.C.B. is replaced or if the parameters are altered in the air / gas section, thus requiring “complete calibration”.
e P.C.B. detects that some parameters have been altered, thus requiring “fast calibration”.
e board detects an anomaly in the temperature readings of the NTC ow probes; the causes may be: faulty probe, incorrect position, poor system circulation, or clogging of the water side primary heat exchanger.
e board detects an anomaly on the NTC safety ow probe e boiler does not start (1)
Out of range current is detected on the gas valve. e boiler does not start (1)
High current on the gas valve is detected e boiler does not start (1)
Reduced current on the gas valve is detected e boiler does not start (1)
is occurs in the event of malfunctions of the P.C.B. that controls the valve.
A low supply pressure is detected on the gas line. As a result the appliance power is limited and the anomaly is reported.
A malfunction of one of the components that controls the gas valve has been detected
A malfunction of one of the components that controls the gas valve has been detected
e ame is unstable due to: presence of ue gas recirculation, wind, unstable gas pressure, unstable fan speed, or due to system malfunction
e combustion signal is beyond the adjustment range required for an extended period of time
e board has exhausted all possible actions in order to obtain optimal ignition of the burner
e system has exhausted all possible corrections of the number of fan revs
e combustion signal is beyond the adjustment range required for a limited period of time.
A problem is detected on the combustion control, which may be due to: gas low pressure, ue recirculation, defective gas valve or P.C.B.
e system detects a discontinuous combustion signal. e boiler keeps working (1) (2)
is occurs in the event an obstruction is detected in the ue system.
e maximum number of soware errors possible has been reached.
(1)
Check operation of the Wireless CAR, check the battery charge (refer to the relative instructions booklet).
Try to unblock the pump as described in the relative section. If normal conditions are restored the boiler restarts without having to be reset (1)
Vent the pump and the central heating cir­cuit. If normal conditions are restored the boiler restarts without having to be reset (1)
e boiler does not start (1)
e boiler does not start (1)
If normal conditions are restored the boiler restarts without having to be reset (1)
Press the Reset button (1)
If normal conditions are restored the boiler restarts without having to be reset (1) (2)
e boiler does not start (1)
e boiler does not start (1)
e boiler keeps working (1) (2)
e boiler keeps working (1) (2)
Press the Reset button (1)
e boiler keeps working (1) (2)
e boiler keeps working (1) (2)
If normal conditions are restored the boiler restarts without having to be reset (1) (2)
e boiler does not start (1)
If normal conditions are restored the boiler restarts without having to be reset
Press the Reset button (1)
2424
Page 25
2.6 INFORMATION MENU.
By pressing the "Info" button (5), the “Infor­mation menu” is activated for at least 1 second, displaying some boiler operating parameters.
Press the "Info" button (5) to scroll the various parameters.
To exit the menu, press the “Info” button (5) up to the end of the list, or by pressing the “Reset” button (2) or by waiting for 15 minutes.
With the menu active, the indicator (14) will alternately show the indication of the parameter via the letter “d” plus the number of the param­eter that is being displayed and the value of the parameter itself.
Id
Parameter
d 0.0 Not used d 0.1 Displays the combustion signal d 0.2 Displays the primary exchanger output instant heating ow temperature d 0.3 Displays the instant output temperature from the DHW exchanger d 0.4 Displays the values set for central heating set d 0.5 Displays the values set for DHW set
d 0.6
d 0.7 Displays the temperature of the inlet DHW (with optional DHW inlet probe present) d 0.8 Not used
d 1.0 Anomaly list reset. Once “d 1.0” is displayed, press the Reset button; deletion is conrmed via the “88” symbols ashing for two seconds. d 1.1 Displays the temperature read on the safety ow probe d 1.2 Displays the pump operating speed d 1.3 Not used d 1.4 Displays the pump ow rate (lh/100) d 1.5 Displays the fan operating speed (rpm/100) d 1.6 Displays the temperature read on the ue probe
2.7 BOILER SHUTDOWN
Switch the boiler o by putting it in “o” mode, disconnect the onmipolar switch outside of the boiler and close the gas cock upstream from the appliance. Never leave the boiler switched on if le unused for prolonged periods.
2.8 RESTORING CENTRAL HEATING
Periodically check the system water pressure. e boiler pressure gauge should read a pressure between 1 and 1.2 bar.
If the pressure falls below 1 bar (with the circuit cold) restore normal pressure via the valve located at the bottom of the boiler (Fig. 1-3).
N.B.: close the cock aer the operation. If pressure values reach around 3 bar the safety valve may be activated. In this case, remove water from an air vent valve of a radiator until 1 bar is reached or ask for assistance from an authorised company.
In the event of frequent pressure drops, contact a qualied rm for assistance to remove any system leakage.
2.9 SYSTEM DRAINING.
To drain the boiler, use the special draining valve (Fig. 1-3). Before draining, ensure that the lling cock is closed.
Displays the external environment temperature (if optional external probe present) If the temperature is below zero, the value is displayed ashing.
Displays the list of the last ve anomalies.
d 09
(to scroll the list, turn the CH temperature selector (4))
2.10 ANTIFREEZE PROTECTION.
The “Victrix TT” series boiler features an antifreeze function that lights the burner auto­matically when the temperature falls below 4°C (standard protection down to min. temperature of -5°C). All information relative to the an­ti-freeze protection is stated in Par. 1.3. In order
SYSTEM PRESSURE.
to guarantee the integrity of the appliance and the domestic hot water heating system in zones where the temperature falls below zero, we rec­ommend the central heating system is protected using anti-freeze liquid and installation of the Immergas Anti-freeze Kit in the boiler. In the case of prolonged inactivity (second case), we also recommend that:
- disconnect the electric power supply;
- the central heating circuit and boiler domestic hot water circuit must be drained. In systems that are drained frequently, lling must be car­ried out with suitably treated water to eliminate hardness that can cause lime-scale.
2.11 CASE CLEANING.
Use damp cloths and neutral detergent to clean the boiler casing. Never use abrasive or powder detergents.
2.12 DECOMMISSIONING.
In the event of permanent shutdown of the boiler, contact an authorised company for the suitable procedures and also ensure the electri­cal, water and fuel supply lines are shut o and disconnected.
Description
INSTALLERUSER
MAINTENANCE TECHNICIAN
2525
Page 26
BOILER COMMISSIONING
3
INITIAL CHECK
To commission the boiler:
- ensure that the type of gas used corresponds to the boiler settings (the type of gas appears on the display on rst electrical power supply, or by checking the relative parameter “G”);
- check connection to a 230V-50Hz power mains, correct L-N polarity and the earthing connection;
INSTALLERUSER
- make sure the central heating system is lled with water and that the pressure gauge indicates a pressure of 1-1.2 bar.
3.1 BOILER HYDRAULIC DIAGRAM.
MAINTENANCE TECHNICIAN
- switch the boiler on and check correct ignition;
- check the CO2 ow rate in the ue:
- maximum (100%)
- intermediate (50%)
- minimum (0%) the values must comply with what is indicated
in the relative tables (Fig. 3-14);
- check activation of the safety device in the event of no gas, as well as the relative activation time;
- check the intervention of the main switch located upstream of the boiler and in the boiler;
- check that the intake and/or exhaust terminals are not blocked;
- ensure activation of all adjustment devices;
- check the production of domestic hot water;
- check sealing eciency of water circuits;
- check ventilation and/or aeration of the instal­lation room where provided.
If even only a single safety check oers a negative result, do not commission the system.
Key: 1 - Gas valve 2 - Domestic hot water ow switch 3 - Flow limiter 4 - Domestic hot water probe 5 - Condensate drain trap 6 - System lling valve 7 - DHW heat exchanger 8 - System expansion vessel 9 - Condensation module 10 - Air / gas mixer 11 - Fan 12 - Ignition / detection electrode 13 - Air sample point 14 - Flue sample point 15 - Flue probe 16 - Manual vent valve 17 - Flow probe 18 - Safety ow probe 19 - Vent valve 20 - Boiler circulator pump 21 - System pressure switch 22 - ree-way valve (motorised) 23 - By-pass 24 - System draining valve 25 - 3 bar safety valve 26 - 3 bar safety valve drain tting signal
3-1
26
26
G - Gas supply AC - Domestic hot water outlet AF - Domestic cold water inlet SC - Condensate drain M - System ow R - System return
Page 27
3.2 WIRING DIAGRAM.
3-2
Connections 230 V
Connections
very low voltage
INSTALLERUSER
mer
M20 - Fan
M30 - ree-way valve
R5 - Domestic hot water temperature trim-
R6 - Central heating temperature trimmer
S4 - Domestic hot water ow switch
S5 - System pressure switch
S20 - Room thermostat (optional)
T1 - Boiler PCB transformer
T2 - Ignition transformer
X40 - Room thermostat jumper
X70 - B.T. safety thermostat jumper
Y1 - Gas valve
4
5
(optional)
V2
- Comando Amico Remoto remote control
V2
Key:
A19 - Removable memory
B1 - Boiler ow probe
B2 - Domestic hot water probe
B4 - External probe (optional)
B9 - Domestic hot water inlet probe (optional)
B10 - Flue probe
B24 - Safety ow probe
CAR
E3 - Ignition and detection electrode
M1 - Boiler circulator pump
2
MAINTENANCE TECHNICIAN
3
1
(optional)
V2
Colour code key:
BK - Black
BL - Blue
BR - Brown
G - Green
GY - Grey
OR - Orange
P - Purple
PK - Pink
R - Red
W - White
Y - Yellow
1 - 230 Vac 50 Hz power supply
2 - CAR
3 - Status signal
4 - Low voltage connections
5 - 230 V connections
27
27
Page 28
Comando Amico RemotoV2: the boiler is prepared for the application of the Comando Amico Remoto remote control V2 (CARV2), which must be connected to clamps 41 and 44 of the terminal board (located in the boiler control panel) respecting the polarity and eliminating jumper X40.
Room thermostat: the boiler is prepared for the application of the room thermostat (S20), which must be connected to clamps 40 and 41 of the terminal board (located in the boiler control panel) eliminating jumper X40.
INSTALLERUSER
e connector X5 is used for the connection to the relay board.
e connector X6 is for connection to a personal computer.
e connector X8 is used for soware updating operations.
3.3 REMOVABLE MEMORY
e P.C.B. is equipped with a removable memory (2 Fig. 3-4), which records all operation param­eters and system customisations. Should the P.C.B. be replaced, you can use the memory of the replaced board again, so it is not necessary to recongure the appliance.
Attention: replacing the memory must be carried out aer disconnecting all electrical connection of the P.C.B.
GAS valve SGV 100 B&P
Key: 1 - Gas valve outlet pressure point 2 - Coil 3 - Wiring connector 4 - Gas valve inlet pressure point
3.4 TROUBLESHOOTING. N.B.: maintenance interventions must be carried
out by an authorised company (e.g. Authorised Aer-Sales Technical Assistance Service).
- Smell of gas. Caused by leakage from gas circuit pipelines. Check sealing eciency of gas intake circuit.
- Repeated ignition blocks. No gas, check the presence of pressure in the network and that the gas adduction cock is open.
- Irregular combustion or noisiness. It may be caused by: a dirty burner, incorrect combustion parameters, intake-exhaust terminal not cor­rectly installed. Check the above components.
- Non-optimal ignition of rst ignition of the burner: even if the burner is perfectly calibrat­ed, rst ignition of the burner (aer calibration) can be sub-optimal; the system automatically regulates ignition until it nds optimal ignition of the said burner.
- Frequent interventions of the overheating safety thermostat. It can depend on the lack of water in the boiler, little water circulation in the system or blocked pump. Check on the manometer that the system pressure is within established limits. Check that the radiator valves are not closed and also the functionality of the pump.
- Drain trap clogged. is may be caused by dirt or combustion products deposited inside. Check that there are no residues of material blocking the ow of condensate.
1
2
- Heat exchanger clogged. is may be caused by the drain trap being blocked. Check that there are no residues of material blocking the ow of condensate.
- Noise due to air in the system. Check opening of the special air vent valve cap (Part. 20 Fig. 1-29). Make sure the system pressure and expansion vessel pre-charge values are within the set limits; e factory-set pressure values of the expansion vessel must be 1.0 bar, the value of system pressure must be between 1 and 1.2 bar.
- Noise due to air inside the condensation module. Use the manual air vent valve (Part. 11 Fig. 1-29) to eliminate any air present in the condensation module. When the operation has been performed, close the manual vent valve.
- Poor production of D.H.W. If a drop in per­formance is detected during supply of D.H.W., it is possible that the condensation module or D.H.W. heat exchanger is clogged. In this case, contact Immergas Aer-Sales Assistance Service that has procedures to clean the module or D.H.W. heat exchanger.
3.5 CONVERTING THE BOILER TO
OTHER TYPES OF GAS.
If the boiler has to be converted to a dierent type of gas to that specied on the data nameplate, proceed as follows: e gas conversion operation must be carried out by an authorised company (e.g. Authorised Technical Aer-Sales Service). To convert to another type of gas the following operations are required:
- Select, via programming menu “G”, the type of gas by selecting “nG” for methane gas and “LG” for LPG gas. (See par. 3.12).
- Carry out complete calibration (see par. 3.8); during the procedure check and, if necessary, correct the air - gas ratio.
- Upon completing the conversion, apply the sticker regarding the modied gas content onto the data nameplate in the connection box.
ese adjustments must be made with reference to the type of gas used, following that given in the table (Par. 3.22).
MAINTENANCE TECHNICIAN
3-3
P.C.B.
Key: 1 - Fuse 3.15 AF 2 - Removable memory
(A19)
3-4
28
28
3
4
3.6 CHECKS FOLLOWING
CONVERSION TO ANOTHER TYPE OF GAS.
Aer having made sure that the conversion is complete and that the calibration has been suc­cessful, you must make sure that:
- there is no ame in the combustion chamber
- the burner ame is not too high or low and that it is stable (does not detach from burner)
- the pressure testers used for calibration are perfectly closed and there are no leaks from the gas circuit.
N.B.: all boiler adjustment operations must be carried out by a qualied company (e.g. Author­ised Aer-Sales Assistance).
Page 29
3.7 CALIBRATION TYPE INVOLVING THE REPLACEMENT OF A COMPONENT.
When performing extraordinary maintenance on the boiler, involving the replacement of a component, such as the P.C.B. (if the removable memory is not put into the replacement board) or components in the air, gas and ame control circuits, the boiler will need to be calibrated. Select the type of calibration to be carried out according to the table below.
Replaced
component
Gas valve Quick calibration Fan Quick calibration
Burner
Ignition/detection electrodes
P.C.B. (New virgin P.C.B. without removable memory recovery)
P.C.B. (Recovery of the removable memory with the boiler parameters set from the replaced board)
3.8 COMPLETE CALIBRATION FUNCTION.
N.B.: before carrying out complete calibration,
ensure that all the requirements indicated in paragraphs 1.23 and 1.24 have been fullled.
N.B.: to access this function it is crucial that there are no active requests for central heating or DHW production. In the event of anomaly “62” or “72” (see parag.
2.6) the boiler cancels any requests by itself.
N.B.: during the various calibration stages, the air
- gas ratio can be checked and possibly corrected
as described in par. 3.8.
The energy produced is dissipated via the heating circuit; alternatively, the energy can be released from the DHW circuit by opening any hot water tap.
Caution: in this case the only active temperature control is the ow probe that limits the maximum temperature exiting the boiler at 90°C, therefore be careful not to get burned.
- The calibration procedure involves various
stages:
- nominal heat output calibration;
- intermediate heat output ignition calibration;
- minimum heat output calibration;
- calibration self-check.
Type of calibration
required
Complete calibration with air-gas ratio check
Complete calibration with air-gas ratio check
Restore the param­eters as described in the paragraph "P.C.B. programming" Complete calibration with air-gas ratio check
No calibration re­quired.
Each calibration procedure, if carried out without altering the parameters, lasts 5 minutes at the most, aer which it switches automatically to the next parameter until the calibration process is complete.
In order to access the complete calibration stage, you must switch the boiler on, set the DHW selector in the “6 o' clock” position and the heating selector in the “9 o' clock” position, (Fig. 3-5) and press the “Reset” button for about 8 seconds until the “chimney sweep” function is activated; then press the “summer / winter” button within 3 seconds.
3-5
Nominal heat output: with the function active,
the boiler carries out the procedures required to calibrate the appliance at the nominal heat output.
At this stage the display features flashing
icons: “summer”, “winter”, “stand-by” and the operating temperature alternated with the current operating heat output (99%); once the parameters are detected and stabilised, the frame of the ame presence symbol (ref. 10 g. 2-1) will start ashing (this procedure may last a few minutes), meaning that the nominal heat output parameters have been set.
3-6
e air - gas ratio can only be corrected aer
the ame presence frame has ashed (see parag.
3.9) or switch to the next heat output parameter by pressing the “info” button.
Intermediate heat output ignition: once the
nominal heat output calibration is conrmed, the boiler is calibrated with the intermediate heat output (or ignition heat output).
At this stage the display features flashing
icons: “summer”, “winter”, “stand-by” and the operating temperature alternated with the cur­rent operating heat output (typically 41% but variable according to the boiler model); once the parameters are detected and stabilised, the frame of the ame presence symbol will start ashing, meaning that the intermediate heat output parameters have been set.
3-7
e air - gas ratio can only be corrected aer the ame presence frame has ashed (see parag.
3.9) or switch to the next heat output parameter by pressing the “info” button.
Minimum heat output: aer having calibrated
the boiler with the intermediate heat output, it is calibrated with the minimum heat output.
At this stage the display features flashing
icons: “summer”, “winter”, “stand-by” and the operating temperature alternated with the current operating heat output (0%); once the parameters are detected and stabilised, the frame of the ame presence symbol will start flashing, meaning that the minimum heat output parameters have been set.
3-8
e air - gas ratio can only be corrected aer
the ame presence frame has ashed (see parag.
3.9) or exit the calibration mode by pressing the “summer / winter” button.
Calibration self-check: once calibration opera-
tions are complete, the boiler runs a self-check for about one minute. During this check, the boiler can run at dierent powers and it is not possible to apply modications to the operating parameters or to delete the operation in pro­gress. Moreover, it is important not to cut the boiler’s power.
INSTALLERUSER
MAINTENANCE TECHNICIAN
2929
Page 30
3.9 ADJUSTING THE AIR GAS RATIO
During complete calibration (par. 3.8), you can modify the values of the air - gas ratio.
To have an exact value of CO2 in the ue, the technician must insert the sampling probe to the bottom of the sample point, then check that the CO2 value is that specied in the table in (Par.
3.23), (with maximum tolerance equal to ± 0.2
%). If otherwise, change the value as described hereunder:
- During calibration, when the frame of the
INSTALLERUSER
ame presence starts ashing (indicating the correct acquisition of the parameters) it is possible to alter the CO2 value by pressing the “Reset” button. At this stage the display features ashing icons: “summer”, “winter”, “stand-by”, “ame presence”, “external connected devices presence” and the operating temperature is displayed, alternated with the combustion setting.
- To increase the combustion setting, press the
“Stand-by” button; to decrease it, press the “Info” button. As the combustion setting in­creases, the CO2 value decreases and vice-versa.
- Once the parameter has been altered wait for
the value to be saved (displayed via the frame of the ame presence symbol ashing).
- To confirm the set value press the “Reset”
button.
3.10 FAST CALIBRATION.
is function allows you to calibrate the boiler automatically without requiring or giving the possibility to alter the parameters. Typically “fast calibration” is used aer having set the type of ue in menu “F”, which once altered causes anomaly “72”.
N.B.: before carrying out complete calibration, ensure that all the requirements indicated in paragraphs 1.21 and 1.22 have been fullled.
N.B.: to access this function it is crucial that there are no active requests for central heating or DHW production.
In the event of anomaly “62” or “72” (see parag.
2.6) the boiler cancels any requests by itself.
The energy produced is dissipated via the heating circuit; alternatively, the energy can be released from the DHW circuit by opening any hot water tap.
Caution: in this case the only active temperature control is the ow probe that limits the maximum temperature exiting the boiler at 90°C, therefore be careful not to get burned.
In order to access the fast calibration stage, set the DHW selector in the “6 o' clock” position and the heating selector in the “9 o' clock” position, (Fig. 3-10) and press the “Reset” button for about 8 seconds until the “chimney sweep” function is
3-9
activated; then press the “info” button within 3 seconds.
At this stage the display features ashing icons: “summer”, “winter”, “stand-by”, “external probe”, “solar probe” and the operating temperature is displayed, alternated with the current operating heat output.
e calibration stages (nominal, intermediate and minimum) progress automatically and you must wait until calibration is complete.
3-11
3-10
MAINTENANCE TECHNICIAN
Once the function is active, the boiler sequential­ly carries out the procedures required to calibrate the appliance with the nominal, intermediate and minimum heat output values.
3030
Page 31
3.11 FLUE TEST.
To dene the value to set in the ”ue length” “F0” parameter, detect the parameters during the “ue test”.
Attention: Ensure that the condensate drain trap has been lled correctly before carrying out the test.
To activate this mode, the boiler must be in “stand-by” mode, which is visible when the
( ) symbol appears. N.B.: if the boiler is connected to the CARV2 the
“stand-by” function can only be activated via the remote control panel.
To activate the function, press the “Reset” (2) and “on/o” (6) buttons simultaneously until func­tion activation, which is displayed by indicating the fan operation speed (in hundreds of revs) and ignition of the ashing “D.H.W.” (8) and central heating symbols.
3-12
e appliance remains in this mode for a max­imum period of 15 minutes, keeping the fan speed constant.
is function ends once 15 minutes have elapsed, or by disconnecting supply voltage to the boiler, or by pressing the “on/o” (6) button for approx­imately 8 seconds.
Check the ΔP between the test pressures (g. 1-29 Ref. 13), in compliance with the values indicated in the following table:
Parameter F0 Pressure
0 < 145 Pa
1 146 ÷ 178 Pa
2 179 ÷ 205 Pa
Detected Value
(Upon rst check)
N.B.: examinations are carried out by sealing the holes provided to analyse the ues, making them pneumatically sealed.
Attention: should there be a boiler malfunction, you can carry out a ue test to check that there are no obstructions in the ue system. Dierent values to those indicated in the previous tables indicate a ue system malfunction, especially a ue system with excessive load losses or ob­structed system.
3.12 PROGRAMMING THE P.C.B.
e boiler is prepared for possible programming of several operation parameters. By modifying these parameters as described below, the boiler can be adapted according to specic needs.
To access the programming stage, set the DHW selector in the “6 o' clock” position and the heating selector in the “9 o' clock” position and press the “Reset” and “Summer/Winter” buttons for about 8 seconds (Fig. 3-13).
Once the programming mode has been accessed, scroll through the ve menus (G, P, t, A, F) by pressing the “Summer / Winter” button for 1 second.
Use the ''D.H.W. regulator'' selector to select the parameter (within the same sub-menu) and rotate the ''C.H. regulator'' selector to alter the value. Press the "Reset" button for 1 second to store the altered parameters. If the parameters are stored successfully, "88" appears on the indicator (Ref. 14 g. 2-1) for 2 seconds.
Exit the programming mode by waiting for 15 minutes or by pressing the “Reset” and "Summer/ Winter" buttons at the same time.
Attention: if necessary the default values relating to parameters “S” and “P0 ÷ P2” can be altered by temporarily modifying the type of gas (parameter “G”) and by restoring it according to the actual operating conditions (wait for approximately 10 seconds between the gas change and the when it is restored). e restored values will be those relating to the type of boiler set in parameters “n” and “F”. At the end of this operation, anomaly “E62” will appear and complete calibration will be required.
- Menu “G”. is menu is reserved for the air-gas
control settings and it features two sub-menus (n and S), relating to fan and gas valve control settings. Every time these parameters are al­tered, the complete calibration function must be activated (see par. 3.8). In order to access parameters “n” and “S” press the “Reset” button sequentially. In order to exit this part of the menu and access other parts (categories P, t, A, F) press the “Summer / winter” button.
INSTALLERUSER
3-13
Id
Parameter
G
In the event of an alteration, anomaly “E62” appears and complete calibration is required.
Id
Parameter
n Boiler model Dene the boiler model 0 ÷ n
Caution: only use the parameter relating to the boiler installed. In the event of an alteration, anomaly “E62” appears and complete calibration is required.
Parameter Description Range Default
Denes operation with methane gas nG
Denes operation with LPG gas LG
Parameter Description Range Default
3131
MAINTENANCE TECHNICIAN
Personali-
zed value
nG
Personali-
zed value
02 = Victrix 24
TT 2 ErP
Page 32
Id
Parameter
S0 Min output
S1 Max output
S2 Ignition output
In the event of an alteration, anomaly “E62” appears and complete calibration is required.
Parameter Description Range Default
e P.C.B. denes the operating mode and the boiler output according to the combination of several parameters. e proper operating output of the appliance is dened according to the combination of the parameters of menus “n” and “F”. For this reason it is recommended not to alter the parameters of this menu in order not to compromise the proper operation of the boiler.
750 ÷ 1700
rpm
S0 ÷ 6900
rpm
2000 ÷ 4500
rpm
Personali-
zed value
According
to the boiler
model
INSTALLERUSER
MAINTENANCE TECHNICIAN
Id
Parameter
P0 DHW max
P1 Min output
P2 Heating max
P3
P4
P5
P6
P7
P8 - Not used on this boiler model - -
Parameter Description Range Default
Relay 1
(optional)
Relay 2
(optional)
Relay 3
(optional)
Pump function-
ing
External probe
correction
Denes the maximum heat output percentage of the boiler during the D.H.W. phase compared to the maximum heat output available
Denes the minimum heat output percentage of the boiler compared to the minimum heat output available
Denes the maximum heat output percentage of the boiler during the central heating mode compared to the maximum heat output available
e boiler is set-up for functioning with the relay P.C.B. (optional), which can be congured
0 = O 1 = Main zone control 2 =General alarm 3 = CH phase active 4 = External gas valve power supply 5 = (Do not use on this boiler model) 6 = (Do not use on this boiler model) 7 = (Do not use on this boiler model)
e boiler is set-up for functioning with the relay P.C.B. (optional), which can be congured
0 = O 1 =General alarm 2 = CH phase active 3 = External gas valve power supply 4 = Secondary zone control (from TA on relay P.C.B. contact) 5 = Heat pump 6 = (Do not use on this boiler model) 7 = (Do not use on this boiler model)
e boiler is set-up for functioning with the relay P.C.B. (optional), which can be congured
0 = O 1 = Chiller remote activation 2 =General alarm 3 = CH phase active 4 = External gas valve power supply 5 = heat pump 6 = (Do not use on this boiler model) 7 = Main zone control 8 = (Do not use on this boiler model) 9 = (Do not use on this boiler model).
e pump can function in two ways. 0 intermittent: in winter "mode" the circulator is managed by the room
thermostat or by the remote control
1 continuous: in "winter" mode the circulator is always powered and is
therefore always in operation
If the reading of the external probe is not correct it is possible to correct it in order to compensate any environmental factors. (Over the value of +9 the display shows “CE”, which enables an external con­trol function of the boiler for coupling of the same with a system supervisor)
0 - 99 % 99%
0 - P2 0%
0 - 99%
0 - 7 1
0 - 7 0
0 - 9 0
0 - 1 0
-9 ÷ 9 K 0
Personali-
zed value
according
to the boiler
model
3232
Page 33
Id
Parameter
t0
t1
t2 DHW thermostat
t3
t4
t5
t6
t7
t8 Display lighting
t9 Display
Parameter Description Range Default
Central heating
set point min­imum temper-
ature
Central heating
set point max­imum temper-
ature
Solar delay
timing
Domestic hot water priority
timing
Central heating
ignitions timer
Central heating
ramp timer
CH ignition de­lay from TA and
CR request
Denes the minimum ow temperature. 20 ÷ 50 °C 25
Denes the maximum ow temperature.
Establishes the switch-o method in DHW mode.
1 and 3 Correlated: the boiler switches o according to the temperature
set.
0 and 2 Fixed: the switch-o temperature is xed at the maximum value
regardless of the value set on the control panel.
e boiler is set to switch-on immediately aer a request. for DHW In the case of coupling with a solar storage tank positioned upstream from the boiler, it is possible to compensate the distance between the storage tank and the boiler in order to allow the water to reach the boiler. Set the time neces­sary to verify that the water is hot enough (see par. Solar panels coupling)
In winter mode the boiler, at the end of a domestic hot water request, is ready to switch to central heating mode if there is an active request. Timing sets a time period in which the boiler waits before changing the operating mode, in order to quickly and comfortably satisfy an additional request for domestic hot water.
e boiler has electronic timing, which prevents the burner from ignit­ing too oen in central heating mode
In the heating stage, the boiler performs an ignition ramp in order to reach the maximum output set
e boiler is set to switch-on immediately aer a request. In the event of particular systems (e.g. area systems with motorised thermostatic valves etc.) it may be necessary to delay ignition
Establishes the display lighting mode. 0 Automatic: the display lights up during use and dims aer 15 seconds
of inactivity. In the event of an anomaly the display ashes.
1 Low: the display is always lit with low intensity 2 High: the display is always lit with high intensity.
Establishes what the indicator displays 14 (Fig. 2-1). "Summer" mode: 0: the indicator is always o 1: circulator active, it displays the ow temperature pump o the indicator is o
"Winter" mode: 0: it always displays the value set on the central heating selector 1: circulator active, it displays the ow temperature pump o always displays the value set on the CH selector
(t0+5) ÷ 85
°C
0 - 3 2
0 - 30 seconds 0
0 - 100 sec-
onds
(step 10 sec)
0 - 600 sec-
onds
(step 10 sec)
0 - 840
seconds
(step 10 sec)
0 - 600 sec-
onds
(step 10 sec)
0 - 2 0
0 - 1 1
Personali-
zed value
85
INSTALLERUSER
2
18
18
0
3333
MAINTENANCE TECHNICIAN
Page 34
INSTALLERUSER
Id
Parameter
A0 Hydraulic model Denes the type of hydraulics in the boiler
A1 - Not used on this boiler model - -
A2
A3
A4
A5
A7
Parameter Description Range Default
Set
0
Model
Pump
Maximum pump
speed
Minimum pump
speed
Pump operating
mode
Ignition phase
automatic vent
Denes the type of circulator in the boiler
Sets the maximum pump operating speed 1 ÷ 9
Sets the minimum pump operating speed 1 ÷ A3
Sets the pump operating mode
Sets the activation mode of the automatic vent at each new electric powering phase of the boiler. is function lasts 8 minutes, and is displayed via a countdown signalled by the special indicator (Ref. 14 Fig. 2-1). During this period the DHW and CH functions are not active. e “automatic vent” function can be annulled by pressing the “reset” button. 1: the automatic vent is enabled at each new electric power supply.
0: the automatic vent is enabled only at the rst electric power supply
aer having set the parameter to “0”; once the function has ended, or is interrupted by pressing the “reset” button, it will not be enabled again unless the parameter is set to “1”.
Set
2
Set
0
0 - 1 1
Personali-
zed value
0
2
9
5
0
Id
Parameter
F0
F1 - Not used on this boiler model - -
In the event of an alteration, anomaly “E72” appears and fast calibration is required.
3.13 SOLAR PANELS COUPLING FUNCTION.
e boiler is set-up to receive pre-heated water from a system of solar panels up to a maximum temperature of 65°C. In all cases, it is always necessary to install a mixing vale on the hy­draulic circuit upstream from the boiler on the cold water inlet.
Note: in order for the boiler to work properly, the temperature selected on the solar valve must be 5°C greater than the temperature selected on the boiler control panel.
In this condition, parameter t2 (DHW ther­mostat) must be set at “1” and parameter t3 (solar delay time) must be set for a period that is sucient to receive water from a storage tank
MAINTENANCE TECHNICIAN
located upstream of the boiler. e greater the distance from the storage tank, the longer the stand-by time to be set. Once these adjustments have been made, when the temperature of the boiler inlet water is the same or greater than that set by the DHW selector switch, the boiler does not switch on.
Parameter Description Range Default
Equivalent length
ue
Denes the length of the ue (see par. 3.10) 0 - 2 0
3.14 "CHIMNEY SWEEP" FUNCTION.
When activated, this function forces the boiler to variable output for 15 minutes. In this state all adjustments are excluded and only the safety thermostat and the limit ther­mostat remain active. To activate the chimney sweep function, press the “Reset” button (2) until activation of the function in the absence of DHW requests.
Its activation on the boiler display is conrmed by the indicators ashing at the same time (11 and 12 Fig. 2-1), while on the CARV2 (optional) it is indicated as “ERR>07”.
is function allows the technician to check the combustion parameters. Once the function is activated, it is possible to select whether to make the chick in CH status or DHW status by opening any hot water cock and regulating the power by turning the "CH regulation" selector (6). e central heating or DHW operating mode is
displayed by the relative symbols or .
Aer the checks, deactivate the function switch­ing the boiler o and then on again.
Attention: the boiler needs a certain amount of time to stabilise itself before carrying out a com­bustion parameters check. It is thus necessary to wait for the boiler to carry out a self-diagnosis
test, which is signalled by the ( ) ashing symbol. Once the symbol stops ashing, it is possible to check the combustion parameters.
Personali-
zed value
3.15 PUMP ANTIBLOCK FUNCTION.
e boiler has a function that starts the pump at least once every 24 hours for the duration of 30 seconds in order to reduce the risk of the pump becoming blocked due to prolonged inactivity.
3.16 THREEWAY ANTIBLOCK FUNCTION.
Both in “domestic hot water” and in “domestic hot water-central heating” phase the boiler is equipped with a function that starts the three­way motorised group 24 hours aer it was last in operation, running it for a full cycle so as to reduce the risk of the three-way group becoming blocked due to prolonged inactivity.
3.17 RADIATORS ANTIFREEZE FUNCTION.
If the system return water is below 4°C, the boiler starts up until reaching 42°C.
3.18 P.C.B. PERIODIC SELFCHECK.
During functioning in central heating mode or with boiler in standby, the function activates every 18 hours aer the last boiler check/power supply. In case of functioning in domestic hot wa­ter mode the self-check starts within 10 minutes aer the end of the withdrawing in progress, for duration of approx. 10 seconds.
N.B.: during self-check, the boiler remains o.
3434
Page 35
3.19 AUTOMATIC VENT FUNCTION.
In the case of new central heating systems and in particular mode for oor systems, it is very important that dearation is performed correctly. e function consists of the cyclic activation of the pump (100 s ON, 20 s OFF) and the 3-way valve (120 s D.H.W., 120 s C.H.). e function is activated in two dierent ways:
- at each new boiler power supply, based on the setting of parameter “A7”;
- by pressing the buttons at the same time (3 and 5 Fig. 2-1) for 5 seconds with the boiler in stand-by.
N.B.: if the boiler is connected to the CARV2
the “stand-by” function can only be activated via the remote control panel.
In the rst case, the function has duration of 8 minutes and it can be interrupted by pressing the “reset” button (2). In the second case it has duration of 18 hours and it can be interrupted by simply switching the boiler on.
Activation of the function is signalled by the countdown shown on the indicator (14).
3.20 YEARLY APPLIANCE CHECK AND MAINTENANCE.
e following checks and maintenance should be performed at least once a year.
- Check that the system's water PH is between
6.5 and 8.5.
- Visually check for water leaks or oxidation
from/on fittings and traces of condensate residues inside the sealed chamber.
- Check contents of the condensate drain trap.
- Check that there are no residues of material
clogging the condensate passage; also check that the entire condensate drainage circuit is clear and ecient.
- Visually check that the water safety drain valve
is not clogged.
- Check that, aer discharging system pressure
and bringing it to zero (read on boiler pressure gauge), the expansion vessel pressure is at 1.0 bar.
- Check that the system static pressure (with
system cold and aer relling the system by means of the lling valve) is between 1 and 1.2 bar.
- Visually check that the safety and control
devices have not been tampered with and/or short-circuited.
- Check the condition and integrity of the elec-
trical system and in particular:
- supply voltage cables must be inside the
fairleads;
- there must be no traces of blackening or
burning.
- Check ignition and operation.
- Check correct calibration of the burner in
domestic hot water and central heating phases.
- Check the operation of the appliance control
and adjustment devices and in particular:
- system regulation probes intervention;
- domestic hot water control thermostat inter-
vention.
- Check sealing eciency of the gas circuit and the internal system.
- Verify the intervention of the ionisation ame control no gas device:
- Check the CO2 by using the chimney sweep function at the three reference heat outputs. Should values out of the indicated tolerance range be detected, check the integrity of the ignition / detection electrode and, if required, change it, also changing the relative gasket. At this point, activate the “complete calibration” function.
Attention: the burner does not need to be opened for normal maintenance of the appliance. However, should it be removed, you must change the gasket.
N.B.: in addition to yearly maintenance, you must also check the thermal system and energy eciency, with the frequency and procedures that comply with the technical regulations in force.
INSTALLERUSER
CO2 at nominal output
(99 %)
G 20 9.20 ± 0.80 9.00 ± 0.80 9.00 ± 0.80
G 31 10.20 ± 1.00 10.00 ± 1.00 10.00 ± 1.00
N.B.: measurements and calibration must be carried out by using regularly-calibrated instruments.
CO2 at intermediate output
(53 %)
35
35
CO2 at minimum output
(0 %)
MAINTENANCE TECHNICIAN
3-14
Page 36
3.21 CASING REMOVAL.
To facilitate boiler maintenance the casing can be completely removed as follows:
• Lower grid (Fig. 3-15a).
1) Loosen the two screws (a);
2) Press the hooks inwards, which block the lower grid (b).
3) Remove the grid (b).
• Front panel (Fig. 3-15b).
4) Remove the cover caps (c) and loosen screws
INSTALLERUSER
(d).
5) Pull the front panel (e) towards you and release it from its lower seat.
3
2
a
b
• Front (Fig. 3-15c).
6) Loosen the two screws (g).
7) Pull the front (f) slightly towards you.
8) Release front (f) from pins (h) pulling it towards you while pushing it upwards at the same time.
4
3
2
d
c
a
1
4
d
e
5
c
MAINTENANCE TECHNICIAN
1
3-15a 3-15b
8
8
h
h
7
6
7
6
g
f
36
36
g
3-15c
Page 37
Rif. X
• Control panel (Fig. 3-15d).
9) Press the hooks on the side of the control panel (i).
10) Tilt the control panel (i) towards you.
Sides (Fig. 3-15e).
11) Loosen screws (k) of side fastening (j).
12) Remove the sides by extracting them from their rear seat (Rif. X).
INSTALLERUSER
9
11
10
9
i
9
i
9
Ref. X
3-15d
X
k
X
X
11
11
12
X
k
MAINTENANCE TECHNICIAN
12
X
A
j
k
11
j
k
3-15e
37
37
Page 38
3.22 VARIABLE HEAT OUTPUT. N.B.: the power data in the table has been ob-
tained with intake-exhaust pipe measuring 0.5 m
INSTALLERUSER
THERMAL
POWER
(kW) (kcal/h) (%) (m3/h) (kg/h)
23,6 20296 23,0 19780 96 2,52 1,85 22,0 18920 92 2,41 1,77 21,0 18060 87 2,30 1,69 20,6 17716 19,0 16340 78 2,07 1,52 18,0 15480 73 1,96 1,44 17,0 14620 69 1,85 1,36 16,0 13760 64 1,74 1,28 15,0 12900 59 1,63 1,20 14,0 12040 54 1,52 1,12 13,0 11180 50 1,41 1,04 12,0 10320 45 1,30 0,96 11,0 9460 40 1,19 0,88 10,0 8600 35 1,08 0,80
9,0 7740 31 0,97 0,72 8,0 6880 26 0,87 0,64 7,0 6020 21 0,76 0,56 6,0 5160 16 0,65 0,48 5,0 4300 11 0,54 0,40 4,0 3440 6 0,43 0,32 3,0 2580 1 0,32 0,24
THERMAL
POWER
D.H.W.
CEN.
HEAT.
+
D.H.W.
in length. Gas ow rates refer to net heating value below a temperature of 15°C and at a pressure of 1013 mbar.
METHANE (G20) PROPANE (G31)
MODULATION
99 2,60 1,91
85 2,25 1,65
BURNER GAS
FLOW RATE
BURNER GAS
FLOW RATE
3.23 COMBUSTION PARAMETERS.
G20 G31
Supply pressure mbar (mm H2O) 20 (204) 37 (377) Gas nozzle diameter mm 5.15 5.15
Flue ow rate at nominal heat output kg/h 40 41 Flue ow rate at min heat output kg/h 5 5 CO2 at Q. Nom./Min. % ±0,2 9.20 / 9.00 10.20 / 10.00 CO with 0% O2 at Nom./Min. Q. Nom./Min. ppm 115 / 10 205 / 10 NOX at 0% of O2 at Q. Nom./Min. mg/kWh 35 / 20 30 / 25 Flue temperature at nominal output °C 69 84 Flue temperature at minimum output °C 53 56
Combustion parameters: measuring conditions of useful eciency (ow temperature/return
MAINTENANCE TECHNICIAN
temperature= 80/60 °C), ambient temperature reference = 15°C.
3838
Page 39
3.24 TECHNICAL DATA.
Domestic hot water nominal heat input kW (kcal/h) 24,6 (21156) Central heating nominal heat input kW (kcal/h) 21,3 (18318) Minimum heat input kW (kcal/h) 3,1 (2630) Domestic hot water nominal heat output (useful) kW (kcal/h) 23,6 (20296) Central heating nominal heat output (useful) kW (kcal/h) 20,6 (17716) Minimum heat output (useful) kW (kcal/h) 3,0 (2580) (*) Eciency 80/60 Nom./Min. % 96,9 / 98,1 (*) Eciency 50/30 Nom./Min. % 101,2 / 108,6 (*) Eciency 40/30 Nom./Min. % 104,6 / 109,1 Casing losses with burner On/O (80-60°C) % 0,47 / 1,0 Heat loss at ue with burner On/O (80-60°C) % 0,01 / 2,4 Central heating circuit max. operating pressure bar 3 Maximum heating temperature °C 90 Adjustable heating temperature (max operation eld) °C 20 - 85 System expansion vessel total volume l 5,8 Expansion vessel factory-set pressure bar 1,0 Appliance water content l 1,9 Head available with 1000 l/h ow rate kPa (m H2O) 37,2 (3,8) Hot water production useful heat output kW (kcal/h) 23,6 (20296) Domestic hot water adjustable temperature °C 30 - 60 Domestic hot water circuit min. pressure (dynamic) bar 0,3 Domestic hot water circuit max. operating pressure bar 10 Flow rate capacity in continuous duty (T 30°C) l/min 12,2 Weight of full boiler kg 33,9 Weight of empty boiler kg 32,0 Electrical connection V/Hz 230 / 50 Nominal power absorption A 0,69 Installed electric power W 90 Pump absorbed power W 59 Fan power absorbed power W 22 Value EEI 0,20 - Part. 3 Equipment electrical system protection - IPX5D Temperature of combustion products °C 75 NOX class - 5 Weighted NO Weighted CO mg/kWh 20,0
Type of appliance
Category II 2H3P
X
mg/kWh 28,0
C13 / C13x / C33 / C33x / C43 / C43x / C53 / C63 /
C83 / C93 / C93x / B23 / B33
INSTALLERUSER
- e data relating to domestic hot water perfor­mance refer to a dynamic inlet pressure of 2 bar and an inlet temperature of 15°C; the values are measured immediately at the boiler outlet, considering that to obtain the data declared, mixing with cold water is required.
- (*) Yields refer to the lower heating value.
MAINTENANCE TECHNICIAN
3939
Page 40
3.25 KEY FOR DATA NAMEPLATE.
Md Cod. Md Sr N° CHK Cod. PIN
Type Qnw/Qn min. Qnw/Qn max.
Pn min. Pn max. PMS PMW D TM NOx Class
N.B.: the technical data is provided on the data plate on the boiler
IE
Md Model
Cod. Md Model code
Sr N° Serial Number
CHK Check
Cod. PIN PIN code
Typ e Type of installation (ref. CEN TR 1749)
Qnw min. Minimum DHW heat input
Qn min. CH minimum heat input
Qnw max. DHW maximum heat input
Qn max. CH maximum heat input
Pn min. Minimum heat output
Pn max. Maximum heat output
PMS Maximum system pressure
PMW Maximum domestic hot water pressure
D Specic ow rate
TM Maximum operating temperature
NOx Class NOx Class
CONDENSING Condensing boiler
CONDENSING
40
Page 41
3.26 TECHNICAL PARAMETERS FOR COMBINATION BOILERS IN COMPLIANCE WITH REGULATION 813/2013.
Eciencies in the following tables refer to the gross caloric value.
Model/s: Victrix 24 TT 2 ErP
Condensing Boilers: SI
Low temperature boiler: NO
Boiler type B1: NO
Co-generation appliance for central heating: NO Fitted with supplementary heating system: NO
Mixed heating appliance: SI
Element Symbol Va l u e Unit Element Symbol Va lue Unit
Nominal heat output P
n
21 kW
Seasonal energy eciency of central heating
η
s
93 %
For central heating only and mixed boilers: useful heat output For central heating only and mixed boilers: useful eciency At nominal heat output in high tempera-
ture mode (*) At 30% of nominal heat output in a low
temperature mode (**)
P
P
4
1
20.6 kW
6.9 kW
At nominal heat output in high tempera­ture mode (*)
At 30% of nominal heat output in a low temperature mode (**)
η
η
4
1
87.8 %
97.6 %
Auxiliary electricity consumption Other items
At full load el
At partial load el
In standby mode P
0.016 kW Heat loss in standby P
max
0.012 kW Ignition burner energy consumption P
min
0.005 kW Emissions of nitrogen oxides NO
SB
stby
ign
X
0.045 kW
0.000 kW
25
For mixed central heating appliances
mg / kWh
Stated load prole XL Domestic hot water production eciency η
Daily electrical power consumption Q
0.220 kWh Daily gas consumption Q
elec
WH
fuel
85 %
22.677 kWh
Contact information IMMERGAS S.p.A. VIA CISA LIGURE, 95 - 42041 BRESCELLO (RE) ITALY (*) High temperature mode means 60°C on return and 80°C on ow.
(**) Low temperature mode for condensation Boilers means 30°C , for low temperature boilers 37°C and for other appliances 50°C of return temper­ature.
3.27 PRODUCT FICHE IN COMPLIANCE WITH REGULATION 811/2013.
Parameter value
Annual energy consumption for the heating function (QHE) 36.6 GJ
Annual electricity consumption for the domestic hot water function (AEC) 48 kWh
Annual fuel consumption for the domestic hot water function (AFC) 17 GJ
VICTRIX 24 TT 2 ERP
Seasonal space heating energy eciency (ηs) 93 %
Water heating energy eciency ( ηwh) 85 %
XL
++
A
+
A
A
A
B C D E F G
D
E
F
G
A
B
C
A
For proper installation of the appliance refer to chapter 1 of this booklet (for the installer) and current installation regulations. For proper maintenance refer to chapter 3 of this booklet (for the maintenance technician) and adhere to the frequencies and methods set out herein.
48 dB
21
kW
41
Page 42
3.28 PARAMETERS FOR FILLING IN THE PACKAGE FICHE.
In case you should wish to install an assembly, starting from the Victrix 24 TT 2 ErP boiler, use the assembly charts in g. 3-18 and 3-21. To complete it properly, ll the relevant spaces (as shown in the assembly sheet facsimile Fig. 3-16 and 3-19) with the values shown in tables Fig. 3-17 and 3-20.
Facsimile for lling in the package che for preferential boiler space heaters.
Seasonal space heating energy efciency of boiler
e remaining values must be obtained from the technical data sheets of the products used to make up the assembly (e.g. solar devices, in­tegration heat pumps, temperature controllers). Use board Fig. 3-18 for “assemblies” related to the central heating mode (e.g.: boiler + temperature controller). Use board Fig. 3-21 for “assemblies” related to the domestic hot water function (e.g.: boiler + solar thermal system).
1
‘I’
%
Temperature control From che of
temperature control
Supplementary boiler From che of boiler
Solar contribution
From che of solar device
Collector size
(in m2)
( ‘III’ x + ‘IV’ x ) x (0.9 x ( / 100) x =
Supplementary heat pump
From che of heat pump
Solar contribution and Supplementary heat pump
Select smaller value
Seasonal space heating energy efciency of package
Class I = 1 %, Class II = 2 %, Class III = 1.5 %, Class IV = 2 %, Class V = 3 %, Class VI = 4 %, Class VII = 3.5 %, Class VIII = 5 %
Seasonal space heating energy efciency
( - ‘I’ ) x 0.1 =
Tank volume
(in m3)
0.5 x OR 0.5 x =
Collector efciency
Seasonal space heating energy efciency (in %)
( - ‘I’ ) x ‘II’ =
4 5
(in %)
(in %)
Tank rating A* = 0.95, A = 0.91, B = 0.86, C = 0.83, D-G = 0.81
+
±
+
+
-
2
%
3
%
4
%
5
%
6
%
7
%
Seasonal space heating energy efciency class of package
+++
++
G F E D C B A A
< 30 % ≥ 30 % ≥ 34 % ≥ 36 % ≥ 75 % ≥ 82 % ≥ 90 % ≥ 98 % ≥ 125 %≥ 150 %
Boiler and supplementary heat pump installed with low temperature heat emitters at 35°C?
From che of heat pump
The energy efciency of the package of products provided far in this che may not correspond to its actual energy efciency once installed in a building, as the efciency is inuenced by fur­ther factors such as heal loss in the distribution system and the dimensioning of the products in relation to building size and characteristics.
7
+ ( 50 x ‘II’ ) =
+
A
A
%
42
3-16
Page 43
Parameters for lling in the package che.
Parameter Victrix 24 TT 2 ErP
‘I’ 93
‘II’ * ‘III’ 1,27 ‘IV’ 0,49
* to be established by means of table 5 of Regulation 811/2013 in case of “assembly” including a heat
pump to integrate the boiler. In this case the boiler must be considered as the main appliance of the assembly.
Room heating system package che.
Seasonal space heating energy efciency of boiler
1
___
3-17
%
Temperature control From che of
temperature control
Supplementary boiler From che of boiler
Solar contribution
From che of solar device
Collector size
(in m2)
( ___ x + ___ x ) x (0.9 x ( / 100) x =
Supplementary heat pump
From che of heat pump
Solar contribution and Supplementary heat pump
Select smaller value
Seasonal space heating energy efciency of package
Class I = 1 %, Class II = 2 %, Class III = 1.5 %, Class IV = 2 %, Class V = 3 %, Class VI = 4 %, Class VII = 3.5 %, Class VIII = 5 %
Seasonal space heating energy efciency
( - ___ ) x 0.1 =
Tank volume
(in m3)
0.5 x OR 0.5 x =
Collector efciency
Seasonal space heating energy efciency (in %)
( - ___ ) x ___ =
4 5
(in %)
(in %)
Tank rating A* = 0.95, A = 0.91, B = 0.86, C = 0.83, D-G = 0.81
+
±
+
+
-
2
%
3
%
4
%
5
%
6
%
7
%
Seasonal space heating energy efciency class of package
+++
++
G F E D C B A A
< 30 % ≥ 30 % ≥ 34 % ≥ 36 % ≥ 75 % ≥ 82 % ≥ 90 % ≥ 98 % ≥ 125 %≥ 150 %
Boiler and supplementary heat pump installed with low temperature heat emitters at 35°C?
From che of heat pump
The energy efciency of the package of products provided far in this che may not correspond to its actual energy efciency once installed in a building, as the efciency is inuenced by fur­ther factors such as heal loss in the distribution system and the dimensioning of the products in relation to building size and characteristics.
7
+ ( 50 x ___ ) =
43
+
A
A
%
3-18
Page 44
Facsimile for lling in domestic hot water production system package che.
Water heating energy efciency of combination heater
Declared load prole:
Solar contribution From che of solar device
( 1,1 x ‘I’ - 10 % ) x ‘II’ - ‘III’ - ‘I’ =
Water heating energy efciency of package under average climate
Water heating energy efciency class of package under average climate
G F E D C B A A
M
L
XL
XXL
< 27 %
< 27 %
< 27 %
< 28 %
≥ 27 %
≥ 27 %
≥ 27 %
≥ 28 %
≥ 30 %
≥ 30 %
≥ 30 %
≥ 32 %
Auxiliary electricity
≥ 33 %
≥ 36 %
≥ 34 %
≥ 37 %
≥ 35 %
≥ 38 %
≥ 36 %
≥ 40 %
≥ 39 %
≥ 50 %
≥ 55 %
≥ 60 %
≥ 65 %
≥ 75 %
≥ 80 %
≥ 85 %
+
A
≥ 100 %
≥ 115 %
≥ 123 %
≥ 131 %
+
++
A
≥ 130 %
≥ 150 %
≥ 160 %
≥ 170 %
1
‘I’
2
3
+++
≥ 163 %
≥ 188 %
≥ 200 %
≥ 213 %
%
%
%
Water heating energy efciency under colder and warmer climate conditions
3 2
Colder: - 0.2 x =
3 2
Warmer: + 0.4 x =
The energy efciency of the package of products provided far in this che may not correspond to its actual energy efciency once installed in a building, as the efciency is inuenced by fur­ther factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size and characteristics.
%
%
3-19
44
Page 45
Parameters for lling in DHW package package che.
Parameter Victrix 24 TT 2 ErP
‘I’ 85
‘II’ * ‘III’ *
* to be determined according to Regulation 811/2013 and transient calculation methods
as per Notice of the European Community no. 207/2014.
Domestic hot water production system package che.
3-20
Water heating energy efciency of combination heater
Declared load prole:
Solar contribution From che of solar device
( 1,1 x ___ - 10 % ) x ___ - ____ - ____ =
Water heating energy efciency of package under average climate
Water heating energy efciency class of package under average climate
G F E D C B A A
M
L
XL
XXL
< 27 %
< 27 %
< 27 %
< 28 %
≥ 27 %
≥ 27 %
≥ 27 %
≥ 28 %
≥ 30 %
≥ 30 %
≥ 30 %
≥ 32 %
Auxiliary electricity
≥ 33 %
≥ 36 %
≥ 34 %
≥ 37 %
≥ 35 %
≥ 38 %
≥ 36 %
≥ 40 %
≥ 39 %
≥ 50 %
≥ 55 %
≥ 60 %
≥ 65 %
≥ 75 %
≥ 80 %
≥ 85 %
+
A
≥ 100 %
≥ 115 %
≥ 123 %
≥ 131 %
+
++
A
≥ 130 %
≥ 150 %
≥ 160 %
≥ 170 %
1
___
2
3
+++
≥ 163 %
≥ 188 %
≥ 200 %
≥ 213 %
%
%
%
Water heating energy efciency under colder and warmer climate conditions
3 2
Colder: - 0.2 x =
3 2
Warmer: + 0.4 x =
The energy efciency of the package of products provided far in this che may not correspond to its actual energy efciency once installed in a building, as the efciency is inuenced by fur­ther factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size and characteristics.
%
%
45
3-21
Page 46
46
Page 47
47
Page 48
Follow us
Immergas Italia
immergas.com
Immergas S.p.A. 42041 Brescello (RE) - Italy Tel. 0522.689011 Fax 0522.680617
Certied company ISO 9001
is instruction booklet is made of ecological paper Cod. 1.039151ENG - rev. ST.002102/003 - 10/16 - Inglese per IRLANDA (IE)
Loading...