TECHNIP PROJ. N° : 2544-MIDOR REFINERY EXPANSION
MR : 1541-104
SUBJECT : STEM DOWN VALVES
VENDOR JOB N° : Y20516CZ
VENDOR DOCUMENT N° : Y20516CZ – INDEX FOR VDB
REVISION N° : C
FILENAME NUMBER : Y20516CZ – Index for VDB _C
DOCUMENT NAME : Index for VDB
Space for Technip Review Code,
Specialist Signature and Review
Date
PROJ.: MIDOR REFINERY EXPANSION
OWNER: MIDDLE EAST OIL REFINERY (MIDOR)
MA T ERI AL REQ UIS I TIO N No .
PURCHASE ORDER N.: 2544A0179
APPROVED BY
(name & visa)
REVISE AND RESUBMIT
TO BE ISSUED AS FINAL PROVIDED
COMMENTS ARE INCORPORATED
NO COMMENT – FINAL ISSUE
1
2
3
FOR INFORMATION ONLY
4
Y20516CZ – LIST OF VENDOR’S
DOCUMENTS AND DWGS
List of Vendor's documents and dwgs
A0002
Y20516CZ – LIST OF MATERIALS
Y20516CZ – PAINTING
SPECIFICATION
Y20516CZ – Pressure vessel and heat
exch. construction dwgs
Pressure vessel and heat exch. construction
dwgs
Calcul sh (actuators, safety dev,flow measuring
dev)
Y20516CZ – 01 – Y20516CZ – 02 –
Y20516CZ – 03 – Y20516CZ – 04
Outline dimens.dwgs & cross sect.assembly
dwgs
Y20516CZ – 01 – Y20516CZ – 02 –
Y20516CZ – 03 – Y20516CZ – 04
Overall Dimensional Drawing for 3D Model
Electr power/instr air/consumption,heat dissip
data sh
Electrical pneumatically hydraulic connect block
diagr
Declaration provided by CCI
Y20516CZ – Welding Repair
Procedure
Y20516CZ – Special precautions &
Recommendations for storage
Special precautions for handling prior & during
erect. And Recommendations for storage prior
and after erection
Y20516CZ – List of spare parts for
erection,commiss. & start – up
List of spare parts for erection,commiss. & start
– up
Installation, start – up and commissioning
manuals and Operation and maintenance
manuals
Y20516CZ – List of spare parts for
two years operation
List of spare parts for two years operation
B1002
Fabrication and quality control plan