![](/html/95/95f9/95f94768e4a974bddec1e2299ca57c317b65153a370cecbc0de2d69633f92012/bg1.png)
Interchangeable Art
Panel Insert
Installation and Care Instructions
Installation Instructions
• The Interchangeable Art Panel Insert should be right side up with the fi nished side facing toward
you.
• Insert the cleats located in the bottom of the insert into the slots located in the bottom edges of
the Interchangeable Art frame opening.
• Attach the safety strap to the top of notch located in the top of the insert.
• Push both top corners of the insert toward the latches in the frame until you hear them click.
• To remove, push the top corners of the insert until the latches click and release.
• Unhook the safety strap from the insert and lift it out of the frame.
Care Instructions
Non-Glass (Sintra Board) Inserts
• Use a slightly damp soft cloth and gently wipe away any dust or debris.
• You may also use a small amount of mild liquid dish detergent for heavily soiled areas.
• Dry immediately with a soft cloth.
Solid Glass Inserts
• Use a slightly damp soft cloth and gently wipe away any dust or debris. Be sure the cloth
is free of dirt and debris so you don’t scratch the glass.
• Standard glass cleaner is recommended. Do not use glass cleaners that are ammonia or
alcohol-based. These types of cleaners can leave streaks or produce a fi lm that attracts
moisture and dust.
• Do not use a razor blade to scrape off stubborn materials from the glass. Razor blades may
scratch the glass.
IMAGIO Interchangeable Art is formerly known as Kitchen Palette.
It is the same great system, we’ve just given it a new name.
Manufactured in the USA • All plastic is recycled • One year warranty on all parts
IMAGIO™ Glass Design
imagioglass.com •888-998-0010
![](/html/95/95f9/95f94768e4a974bddec1e2299ca57c317b65153a370cecbc0de2d69633f92012/bg2.png)
Interchangeable Art
™
System Installation Instructions
Included with System
• Frame
• Blank Panel
• Template
• 10 Anchor Screws
• 2 Latches
• 1 #6 Screw
• Safety Strap
Space Requirements:
The minimum space requirement: 26 1/16” w x 18 1/16” h
Installation takes approximately 30 minutes.
Step One
Before you begin, locate any electric lines, gas lines, plumbing or wiring
before cutting into the drywall. Take care to avoid cutting or damaging
these items. Shut off all electrical power and gas to the installation area.
• Measure and fi nd center point of the area to be installed.
• Mark center line of frame, both vertically and horizontally.
• Use your level to mark line on the wall.
Tools Required
• Pencil
• Level
• Drill with 1” bit
• Tape measure
• Drywall plunge saw or zip saw
• Cross thread screwdriver
Step Two
• Place the included cardboard template on your center line marks.
• Use your level to extend the line both vertically and horizontally if
needed.
• Use your pencil to draw a line around the template, marking the area
to be cut.
Step Three
• Use drywall plunge saw or zip saw to cut frame outline, taking care to
avoid cutting or damaging any electrical lines, gas lines, plumbing
or wiring.
• Remove the cut-out.
• Clear any debris from area.
Step Four
• Set frame (with latch slots on the top) into opening to check for fi t.
• If there is a stud located directly behind either latch hole, drill a 1”hole
in the stud to clear a space for the latch.