Imagine selenio Quick Start Manual

1 Prepare
Selenio™ Broadcast Network Processor Quickstart for BNP 3xr
Attach the rear mounting shelf to the rack
Rear view of rack
Front view of rack
1
345
6
2
SLOT ASLOT C
SLOT BSLOT D
Rear of BNP 3xr (AC Power)
ASI Ports
Rear of BNP 3xr (AC Power)
Eight GigE Ports
10/100 Ethernet
Front of BNP 3xr
Mgmt Port
Compact Flash
Cfg/Power
Fault
Backup
Port SFP
10/100 Ethernet
LEDs
Dual Redundant Hot-Swappable Fans
Mgmt Pot
Supplies listed in the following table are required for this installation.
Provided in your shipping carton You provide
BNP 3xr chassis with installed modules.
AC power cord, for AC system, or DC connector cables, for DC system.
Front and rear rack-mount brackets. Ethernet cable: for connectivity between the
One M4 grounding nut. One or more GigE copper or optical SFP
Phillips screwdriver
Eight rack-mount screws.
BNP and the Management workstation.
modules.
2 Rackmount the BNP 3xr
1. Use the rack-mount screws to attach the front rack-mount bracket to one side of the chassis. Repeat on the other side of the chassis.
2. Secure the front of the chassis to the rack.
3. Slide the mounting brackets to the correct distance and secure them.
4. Seat the chassis on the rear mounting shelf.
5. Ground the chassis.
The BNP 3xr can be used with one to four modules, depending on your requirements.
4 Connect the Ports
Use the correct cable for the port type and your network configuration:
10/100BaseT Ethernet port, used to communicate with the management network.
ASI ports, located on the rear of the chassis. Use a push/twisting motion to ensure proper seating of the cables.
The Gigabit Ethernet ports must have approved SFPs before cabling.
5 Power Up
1. Connect all ports before applying power.
2. Connect power to the chassis:
For AC power: plug one end of the AC power cable into the
BNP 3xr power connector. If using two power supplies, plug the second AC power cable into the other AC power connector. Plug the other end of the power cable(s) into the input power source. The unit should now have power.
For DC power, cut the provided DC connector cables to the
correct length to reach the BNP3xr from the power source. Attach the connector cables from the power source to the BNP3xr power connectors. Attach the other end of the power connector cables into the input power source. Toggle the external circuit breaker to the ON position. The unit should now have power.
3. Verify power: at the BNP 3xr, check to ensure that the Cfg/Pwr LED is solid green. The PSU1 and/or PSU2 LEDs on the front of the chassis should also be solid green.
3 Recommended SFPs
Install approved SFPs according to the manufacturer’s instructions:
Manufacturer Part Number Description
Finisar FTLF1519P1BCL
Finisar FCMJ-8521-3 1000BaseT Copper SFP Transceiver
Avago ABCU-5710RZ SFP 1550nm GigE optical module
Fiberdyne FGE-SFP-T 1000BaseT Copper SFP Transceiver
a. These are some of the units being qualified; Imagine Communications continues
to qualify units to the specification. Please contact Imagine Communications for an update on current SFPs.
SFP 1550nm GigE optical module
a
6 Launch BNP 3xr Element Manager
Copyright 2005-2016 Imagine Communications, Inc. All Rights Reserved 250-3077-01 Rev A Quickstart Guide BNP 3xr, printed 2/20/16
1. Open a browser session on the management workstation. NOTE: When accessing the BNP 3xr for the first time, the address
of the computer being used to access the BNP 3xr must be on the same subnet as the BNP 3xr.
2. Enter the IP address of the BNP 3xr into the browser’s address field (Default IP address:10.1.1.1).
3. Click Launch BNP Element Manager.
If necessary and when prompted, install the correct Java
JDK/JRE VERSION (5.0 or higher).
At the Login dialog, select a user account and enter the
password. Default login: Administrator. Default password: Admin.
7 Go to Configuration > Global
Set global BNP parameters, then click Apply Configuration.
8 Go to Configuration > Ethernet Control
Port
11 Go to Grooming > Mapping
1. At the Inputs panel, right-click on a port, and select Create Transport Stream from the popup menu.
2. At the Create GigE Transport Stream dialog, set input stream parameters, then click OK.
3. At the Outputs panel, right-click on a port and select Create Transport Stream from the popup menu.
4. At the Create Output Transport Stream dialog, set output stream parameters, then click OK
5. Create a new Output Program by using either of the following methods:
Right-click on a Output TS and select Create Program,
or
Groom a program: drag an existing program from a specific
transport stream of the Inputs panel to a specific transport stream on the Outputs panel.
•Set Ethernet Port 1 parameters, then click Apply
Configuration.
9 Go to Configuration > GigE Ports
.
For each applicable GigE port: enable and set the IP address,
subnet, and gateway, then click Apply Configuration.
10 Go to Configuration > ASI Ports
For each applicable ASI port: select a data flow direction, then
click Apply Configuration.
For more details, refer to the Selenio™ BNP Element Manager User Guide.
Imagine Communications, Inc.
www.ImagineCommunications.com
Loading...