SECTION I – Receipt and Initial Installation
4 Receipt
4 Unpacking and Inspection
5 Handling and Installation
SECTION II – Product Line Specific Installation
5 Part 1 – Universal Hi-Rise Units (MUY)
6 Potential Unit Configurations
6 Unit Knockout Locations (Typical)
7 Supply, Return, and Drain Riser Installation
8 Riser to Unit Installation
8 Riser to Drain Installation
10 Supply Air Installation
10 Part 2 – Ditto and Siamese Ditto ( MAY/MBY)
12 Part 3 – High Rise, Ditto, and Siamese Ditto (MPY, MAY/
MBY, MMY/MSY)
12 Supply, Return, and Drain Risers
13 Part 4 – Mega Mod Units (MGY)
14 Supply, Return, and Drain Risers
14 Riser to Unit Installation
15 Riser to Drain Installation
16 Unit Knockout Locations (Typical)
16 Supply Air Installation
17 Demolition
18 Installation
SECTION III – Finishing Installation (All Models)
18 Grille/Ductwork Installation
18 Outside Air Installation (if required)
18 Electrical Connections
19 Exposed Unit Touch-up and Repainting
19 Concealed Unit Enclosure
SECTION IV – Start-up (All Models)
20 Operating Conditions
20 Cooling/Heating System
20 Air System Balancing
21 Control Board Adjustment
22 Water Treatment
22 Water System Balancing
23 Controls Operation
SECTION V – Routine Maintenance (All Models)
23 Motor/Blower Assembly
23 Coil
24 Electric Resistance Heater Assembly
24 Electrical Wiring and Controls
24 Valves and Piping
24 Filters, Throwaway
25 Filters, Permanent
25 Drain
25 Replacement Parts
SECTION VI – Checklists
25 Receiving and Inspection
25 Handling and Installation
25 Cooling/Heating Connections
25 Ductwork Connections
25 Electrical Connections
26 Unit Start-up
26 Terms and Conditions