IDS GeoRadar ALADDINSK2 User Manual

- PRO/010/M1 Rev 3 -
INGEGNERIA DEI SISTEMI S.p.A.
Rev. 1.2
Protocol: MN/2005/038
USER MANUAL
“ALADDIN SK2 ”
STRUCTURE KIT
User Manual
Pisa, 28/06/2006
Tot pag. N°. = 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
IDS will not be held responsible for the consequences of an improper use of the
IDS will not be r esp onsible for the consequences caused by the improp er use of the
“ALADDIN SK2 ” STRUCTURE KIT User Manual
Document Evolution
Revision Date Reason of change
Rev. 1.0 19/12/2005 First Edition
Rev. 1.1 28/06/2006 Upgrade of the survey kit
Rev. 1.2 25/07/2006 FCC information included
Versions covered by this document
K2 01.01.000, 01.02.000, 01.02.002.
GRED 3D 01.00.000, 01.00.001, 01.00.002, 01.03.016
Disclaimer
equipment
software.
Contacts
IDS Ingegneria dei Sistemi S.p.A. – GeoRadar Division
Via Sterpulino, 20 56121 Ospedaletto (PISA) - ITALIA
Tel: +39.050.967111 Fax: +39.050.967121
inforis@ids-spa.it
Customer Care Department:
customercare.gpr@ids-spa.it
Tel.: +39.050.967122
Sales & Marketing:
sales.gpr@ids-spa.it
Tel.: +39.050.967123/24
2 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
IMPORTANT NOTE FOR THE US CUSTOMERS
In the US this unit operates under FCC rules Part 15. According to these rules, the system includes a manually operated switch (“dead-man switch”) that causes the transmitter to cease operation within 10 seconds of being released by the operator. The use of this switch is further explained in this manual; specific instructions for
operating a system sold in the US are identified by the following label
This equipment complies with part 15 of the FCC rules. Any changes or modifications not expressly app roved by the manufacturer could void the user’s authority to op erate the
equipment.
3 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
INDEX
1. INTRODUCTION .......................................................................................................6
1.1 Purpose.................................................................................................................6
1.2 Field of application...............................................................................................6
1.3 Reference ..............................................................................................................6
1.3.1 Referenced Documents ............................................................................6
1.4 Acronyms and Definitions.....................................................................................6
1.4.1 Acronyms.................................................................................................6
1.4.2 Definitions................................................................................................6
1.5 How to use this manual.........................................................................................7
2. SYS TEM COMPONENTS .........................................................................................8
3. HOW TO SET UP THE SYS TEM.............................................................................9
3.1 Opening the case...................................................................................................9
3.2 Connecting up the system ...................................................................................13
3.2.1 How to assemble the frame to the antenna ............................................13
3.2.2 How to assemble the metric wheel to the frame....................................14
3.2.3 Assembly of the slide on the frame........................................................14
3.2.4 How to assemble the fork and the handle on the frame .........................15
3.3 Cable connection of the system...........................................................................15
3.3.1 Complete list of cables ...........................................................................15
3.4 Technical advice .................................................................................................20
4. HOW TO USE THE S YSTEM.................................................................................21
4.1 Main functions ....................................................................................................21
4.2 Work procedure using the Aladdin system .........................................................25
4.2.1 "Automatic" mode..................................................................................25
4.2.2 “Manual” M ode......................................................................................29
4.2.3 “Manual (no check)” Mode....................................................................30
PICTURES INDEX
FIG. 2-1 – “ ALADDIN SK2” ST RUCT URES KIT ..................................................................8
FIG. 3-1 – OPENING THE CASE...........................................................................................9
FIG. 3-2 – REMOVING T HE BATTERY ..............................................................................9
FIG. 3-3 – REMOVING T HE DAD AND T HE ANTENNA TROLLEY .................................10
4 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
FIG. 3-4 – REMOVING T HE BIPOLAR ANTENNA............................................................10
FIG. 3-5 – BOTT OM SECTION...........................................................................................11
FIG. 3-6 – UPPER SECTION ..............................................................................................11
FIG. 3-7 – INSERTING T HE SUPPORT LEGS.....................................................................12
FIG. 3-8 – FIXING T HE WORKT ABLE...............................................................................12
FIG. 3-9 – FINAL SET-UP OF THE WORKT ABLE .............................................................13
FIG. 3-10 – ASSEMBLY OF T HE FRAME ON THE ANT ENNA..........................................13
FIG. 3-11 – ASSEMBLY OF T HE METRIC W HEEL ON T HE FRAME................................14
FIG. 3-12 – ASSEMBLY OF T HE SLIDE ON T HE FRAME.................................................14
FIG. 3-13 – ASSEMBLY OF T HE HANDLE TO T HE FRAME.............................................15
FIG. 3-14 – FIXED CONNECT ION CABLE BETWEEN THE BIP OLAR ANTENNA
T RIGGER BOX...........................................................................................................16
FIG. 3-15 – CONNECTING THE REMOTE CONTROL CABLE ..........................................16
FIG. 3-16 – CONNECTING THE SERIAL CABLE...............................................................17
FIG. 3-17 – CONNECTING THE D-D CABLES...................................................................17
FIG. 3-18 – LAN CABLE.....................................................................................................18
FIG. 3-19 – POWER CABLE ...............................................................................................18
FIG. 3-20 – MET RIC WHEEL CABLE.................................................................................18
FIG. 3-21 – OPT ICAL DET ECT OR, CABLE AND ANTENNA CONNECTION....................19
FIG. 3-22 – SURVEY WHEEL CABLE................................................................................19
FIG. 4-1 – OPENING WINDOW K2 SW ..............................................................................21
FIG. 4-2 – EXTERNAL DEVICE SETTINGS COMMAND...................................................22
FIG. 4-3 –EXTERNAL DEVICE SETTINGS WINDOW.......................................................22
FIG. 4-4 – COM SETT INGS WINDOW ...............................................................................23
FIG. 4-5 – ALADDIN FIELD...............................................................................................23
FIG. 4-6 – INIT IAL K2 SW WINDOW WHEN USING THE ALADDIN ST RUCTURES KIT25
FIG. 4-7 – ALADDIN S YSTEM .........................................................................................26
FIG. 4-8 – P AD FOR THE ST RUCT URES KIT ....................................................................27
FIG. 4-9 – ST ARTING POSITION.......................................................................................27
FIG. 4-10 – ST ART BUTT ONS............................................................................................28
FIG. 4-11 – SEQUENCE OF 2 SCANS USING A 2X2 PAD..................................................29
FIG. 4-12 – PSG CARPET....................................................................................................30
FIG. 4-13 – FEAT URES OF PSG AND SLIDE .....................................................................31
FIG. 4-14 – GRED3D BUTTON...........................................................................................32
5 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
1. INTRODUCTION
This manual contains a complete description of the "Aladdin" structures kit, including details on how to assemble the kit hardware, use it and operate the software interface
1.1 Purpose
This document is intended to be used as a guide for the installation and use of the "Aladdin" structures kit.
1.2 Field of application
This product must only be used for applications in the civil engineering field.
1.3 Reference
1.3.1 Referenced Documents
[RD1] MN/2004/005 (K2 Data Acquisition Software User's guide)
[RD2] MN/2005/002 (GRED 3D Data Elaboration Software).
1.4 Acronyms and Definitions
1.4.1 Acronyms
K2: IDS georadar data acquisition software.
DAD: radar control unit
1.4.2 Definitions
Field survey: a group of field acquisitions relating to a single survey
Raw data: unprocessed data obtained during a field survey.
Maps: graphics showing the change in received radar signal (signal
intensity in gray scale) with respect to the scanning direction. These signals must be processed to be comprehensible
6 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
Survey: the name given to a collection of acquisitions, which together cover all the areas of a large investigation: typically an entire town or a large urban area.
Scan: a single movement of the antenna trolley from the beginning to the end of a pre-established path.
Data processing: this is applied to the raw data to permit the acquired sections to be viewed in a comprehensible way.
Setup: initialisation of a piece of equipment or a software process
1.5 How to use this manual
This manual is divided into the following sections:
Chap. 1: Introduction.
Chap. 2: System composition.
Chap. 3: How to set up the system.
Chap. 4: How to use the system.
7 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
2. SYSTEM COMPONENTS
The "Aladdin SK2 " structures kit consists of the following parts:
1. bipolar antenna
2. connection box
3. trolley handle.
4. antenna trolley
5. notebook PC.
6. 2CH MCH DAD.
7. 2 cables to connect the D-D 65cm antenna to the DAD.
8. 1 battery.
9. 1 battery charger.
10. USB stick + K2 acquisition software.
11. CD-ROM + GRED 3D processing software.
12. transportation case.
13. PSG (Pad Survey Guide) carpet.
14. Optional: Kit with special trolley + optical carpet + optical reader.
Fig. 2-1 – “Aladdin S K2” structures Kit
8 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
3. HOW TO SET UP THE SYSTEM
3.1 Opening the case
When you receive the case containing the "Aladdin" structures kit, follow the procedure below:
Open the protective case, remove the bottom divider and take
out the antenna trolley steering handle (see Fig. 3-1).
Fig. 3-1 – Opening the case
If you want to remove the battery, unscrew the black screw
shown in the picture (Fig. 3-2).
Fig. 3-2 – Removing the battery
9 / 32
IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2005/038 - Rev. 1.2
“ALADDIN SK2 ” STRUCTURE KIT User Manual
Undo the Velcro that keeps the DAD unit blocked, now remove
the DAD and the trolley (Fig. 3-3).
Fig. 3-3 – Removing the DAD and the antenna trolley
Remove the bipolar antenna, pushing the lever towards the foam
support then lift the antenna out rotating it slightly (see the direction of the red arrow in Fig. 3-4); when you have to replace the antenna in the case, be careful that the white pegs on the side of the antenna are blocked into the two holes inside the case (indicated with the red circle).
.
Fig. 3-4 – Removing the bi polar antenna
Open the bottom section (Fig. 3-4 and Fig. 3-5); this is the PC
storage area; if a PC has not been supplied with your order, you can store your own PC here using the pre-cut foam to model a suitably shaped space (Fig. 3-5). The maxim space available for storing a PC is 34cm x 27cm x 5cm
10 / 32
Loading...
+ 22 hidden pages