IDEAL INDUSTRIES H-180-H, H-CXSi-160, H-CXSi-180-H, H-CXSi-120, CXSi 110 User Manual

...
Installers guide to commercial central heating boilers
BOILERS
Concord
CXSi 110/H-180/H
INSTALLATION
MANUAL
& SERVICING
GENERAL
2
Concord CXSi/H - Installation & Servicing
GENERAL
Table 1 - Performance Data
Boiler CXSi 110/H CXSi 120/H CXSi 140/H CXSi 160/H CXSi 180/H
Boiler Input Gross kW 93.9 102.5 119.5 136.6 153.7
Low Rate Btu/h x 1000 320.5 349.6 407.9 466.1 524.4
Nett kW 84.6 92.3 107.7 123.1 138.5
Btu/h x 1000 288.7 315.0 367.4 419.9 472.4
Boiler Input Gross kW 134.2 146.4 170.8 195.2 219.6
High Rate Btu/h x 1000 457.8 499.4 582.7 665.9 749.1
Nett kW 120.9 131.9 153.8 175.8 197.8
Btu/h x 1000 412.4 449.9 524.9 599.9 674.9
Boiler Output kW 110 120 140 160 180
High Rate Btu/h x 1000 375.3 409.4 477.7 545.9 614.2
3
Gas rate High m
Approx. flue
gas volume At 4.5% CO
At 4.5% CO2 & 100°C m
& 212°F ft
2
Burner High mbar 10.4 10.1 9.7 9.6 9.7
setting in.w.g. 4.2 4.0 3.9 3.8 3.9
pressure Low mbar 5.1 4.9 4.8 4.7 4.8
/h 12.78 13.95 16.27 18.59 20.92
ft3/h 451.5 492.5 574.6 656.7 738.8
3
/h 0.112 0.122 0.142 0.163 0.183
3
/h 237 259 301 345 388
in.w.g. 2.0 2.0 1.9 1.9 1.9
Part load efficiency % 83.0 81.6 82.5 82.9 82.8
Note. To obtain gas consumption in l/s divide gross heat input (kW) by a calorific value of 37.8(MJ/m2)
Table 2 - General Data
Boiler CXSi 110/H CXSi 120/H CXSi 140/H CXSi 160/H CXSi 180/H
Number of sections 7 7 8 9 10
Flow connections Rc 65 mm (2
1/2") nominal bore. Flange to BS.4504 (PN6)
Return tappings Rc 2 x 2
Maximum static head m. (ft) 61.0 (200)
Maximum pressure bar (psi) 6.0 (87)
Gas inlet connection Rc 1
1/2
Minimum dynamic mbar 17.5 17.5 17.5 17.5 17.5 gas pressure in. 7 7 7 7 7
Electricity supply 230 Volts - single phase, 50 Hz, fuse 5 A
Nominal flue size (to BS. 835) mm 250 250 250 250 300
in. 10 10 10 10 12
Diverter outlet socket mm 288 288 288 288 344
internal diameter in. 11.3 11.3 11.3 11.3 13.5
Length of burner bars (overall) mm 535 535 535 535 535
in 21.1 21.1 21.1 21.1 21.1
Approximate dry weight kg 538 538 608 678 748
lb. 1186 1186 1340 1494 1648
Water content litre 53 53 60 68 76
gal. 11.7 11.7 13 15 17
Concord CXSi/H - Installation & Servicing
3
GENERAL
Concord CXSi 110/H-180/H (Natural gas) B.G. Certified - P.I. No. 87/AQ/341 Destination Countries: GB and IE
INTRODUCTION
CONTENTS
Air Supply. ........................................................................ 9
Boiler Assembly - exploded view. ............................... 10
CONSTRUCTION
BOILER BODY
The sectional boiler body is of cast iron and is supplied with a sheet steel combustion chamber and integral draught diverter. The boiler is supplied in sectioned form for site assembly.
Boiler Clearances. ........................................................... 6
Burner Assemblies - exploded views. ............................
CXSi 110/H-160/H. ................................................. 25
CXSi 180/H. ............................................................ 26
Casing Assembly. ......................................................... 14
Chimney System. ............................................................ 9
Commissioning. ............................................................ 20
Electrical Connections. ................................................ 17
Electrical Supply. ............................................................ 9
Fault Finding. ................................................................ 29
Gas Safety Regulations .................................................. 4
Gas Supply. ...................................................................... 9
Hydraulic Resistance. ..................................................... 6
Initial Lighting. .............................................................. 21
Installation. .................................................................... 10
Mandatory Requirements. .............................................. 8
Option Kits. ...................................................................... 5
Pump. ............................................................................... 7
CASING
The casing is manufactured in stove enamelled sheet steel and is easily assembled on site.
BURNERS
The burners are of stainless steel construction.
CURRENT GAS SAFETY (INSTALLATION AND USE) REGULATIONS OR RULES IN FORCE.
It is the law that all gas appliances are installed and serviced by a CORGI registered installer in accordance with the above regulations. Failure to install appliances correctly could lead to prosecution. It is in your own interest, and that of safety, to ensure that the law is complied with.
The Concord CXSi 110/H-180/H range of boilers has been tested and certified by British Gas to prEN656 for use with natural gas
only.
Note. Concord CXSi 110/H - 180/H boilers are intended for use as COMMERCIAL BOILERS and are NOT certified for use in domestic applications. A domestic installation is defined as an installation where the boiler takes its combustion air from a living space or from a room directly or indirectly connected with the living space. It is important, therefore, that no external control devices - e.g. flue dampers, economisers etc., are directly connected to this appliance unless covered by these Installation and Servicing Instructions or otherwise recommended by Caradon Ideal Limited in writing. If in doubt please enquire.
Any direct connection of a control device not approved by Caradon Ideal Limited could invalidate the British Gas Certification, the normal appliance warranty and could also infringe the Gas Safety Regulations. Table 1, Table 2 and the descriptive notes which follow contain all the essential data likely to be required by the installer.
Servicing. ....................................................................... 24
Short List of Parts. ........................................................ 31
Static Head Requirements. ............................................ 7
System Connections. .................................................... 13
Ventilation. ....................................................................... 9
Water Circulation. ........................................................... 5
Water Connections. ........................................................ 5
Water Treatment. ............................................................. 7
Wiring Diagrams. .......................................................... 19
CAUTION.
this appliance, care should be taken when handling edges of sheet steel components.
To avoid the possibility of injury during the installation, servicing or cleaning of
4
GAS CONTROLS
The boiler lights at Low rate (approximately 70% of Full rate) by direct burner ignition. After about 1 minute the boiler goes to High rate and will continue at High rate until the thermostat sensor set point is reached. The boiler will then drop to the Low rate; if the temperature continues to rise the boiler will go Off; if the temperature falls the boiler will revert to High rate.
ELECTRICAL CONTROLS
The boiler is supplied with 2 printed circuit boards; Board S4561B1047 is the ignition board containing the flame-proving logic; Board W4115A1020 contains the electronic thermostat and pump overrun timer. A preset overheat thermostat is also provided. The mains voltage supply is via a terminal plug in connection at the control box. The control box displays neons indicating boiler status as follows:
- Boiler on
- Lockout
- Overheat
An anti-cycle delay is built in to the controls to prevent rapid cycling.
Concord CXSi/H - Installation & Servicing
GENERAL
FROST PROTECTION
Frost protection is incorporated in the boiler as long as there is a permanent Live supply wired to Terminal L1 on the terminal plug-in connection at the control box and the boiler thermostat knob is not switched to Off.
If the temperature sensed by the boiler thermostat falls to about
0
C the boiler will fire until the temperature reaches 180C.
5
Note that this is designed to protect the boiler and may not necessarily protect remote parts of the system.
The mains voltage supply is via a terminal plug-in connection at the control box.
OPTION KITS
Remote Indication Kit
This kit gives the facility of remote indication of boiler status.
Pressure Gauge Kit
A pressure gauge kit is available.
DUTY
The range of boilers is suitable for: Combined indirect pumped domestic hot water and central heating systems; Independent indirect pumped domestic hot water or central heating systems.
Fully pumped systems may be open vented or sealed.
WATER CIRCULATION SYSTEM
Due to the compact nature of the boiler the heat stored within the castings at the point of shutdown of the burner must be dissipated into the water circuit in order to avoid the overheat thermostat tripping. In order to allow pump operation after burner shutdown the boiler control box incorporates a pump overrun facility which operates for approximately 6 minutes after the burner shuts down and, in order to make use of this, the pump must be wired to the appropriate terminal L2 (pump) in the boiler control box.
1. The minimum flow rate as given in Table 4 must be maintained whenever the boiler is firing and during the pump overrun period.
2. During the period of pump overrun there must be an open circuit of adequate water volume and/or load. The minimum size of this circuit is given by the use of Graph 1.
Examples shown on Graph 1
a. For the CXSi 110/H and CXSi 120/H the minimum circuit
during pump overrun could be a load of 7 kW with a volume of 42 litres or any other combination given by the relevant line.
b. For the CXSi 180/H the minimum circuit during pump overrun
could be a load of 9 kW with a volume of 70 litres or any other combination given by the relevant line.
The above circuit capacity during pump overrun may be achieved either by provision of an adequate bypass circuit or by ensuring that a zone of suitable size is open for circulation during this period by relevant control of zone valves or pumps.
The range of boilers is NOT suitable for:
1. Gravity DHW systems.
2. Gravity heating systems.
3. Direct domestic hot water supply.
1
WATER CONNECTIONS
Flow connection is 65mm (2 1/2") nominal bore flange to BS.4504 (PN6)
Return tappings are 2" BSP.
The distributor tube must be fitted into the return connection. The flow header must be fitted in the flow pipe.
The open vent must be brought to either the 1 on the flow header or to the unused 2" BSP tapping at the top rear of the boiler.
The cold feed may be brought to the LH front bottom tapping in order to avoid excessive surging or pumping over. The unused bottom rear tapping must not be used for the cold feed pipe as it is practically blocked by the distributor tube.
Safety Valve
A safety valve must be sized and fitted in accordance with BS. 6644 for every type of system. The valve should be set at 0.7 bar (10 lb/in.2) above the operating pressure in the boiler. The maximum safety valve setting is 0.7 bar (10 lb/in.2) above the maximum design operating pressure of 6.0 bar (87 lb/in.2).
1/2" BSP tapping
The wiring diagrams in Frames 16,17 &18 illustrate the control methods for achieving the above.
3. Pump selection should take account of the hydraulic resistance given in Graph 2.
Cold Feed/Open Vent
The independent cold feed and the open vent must comply with BS. 6644 and be of the following minimum size.
Boiler Size Cold Feed Open Vent
CXSi 110/H 1" 1
CXSi 120/H 1" 1
CXSi 140/H 1" 1
CXSi 160/H 1
CXSi 180/H 1
1/4"1 1/2"
1/4"1 1/2"
1/4"
1/4"
1/4"
Concord CXSi/H - Installation & Servicing
5
GENERAL
CXSi 180
/H
CXSi 160
/H
CXSi 110/H
CXSi 120
/H
CXSi 140/H
Con 1900
CXSi 180/H
CXSi 160/H
CXSi 110/H
CXSi 120/H
CXSi 140/H
Con 1898
Con 1899
+:5E
CONCORD




Return Rc
(2" BSP)
Graph 1 - Heat Load / Water Volume
2
CLEARANCES & DIMENSIONS
Graph 2 - Hydraulic Resistance
Table 3
Boiler Size CXSi 110/H CXSi 120/H CXSi 140/H CXSi 160/H CXSi 180/H
Front clearance mm (in) 700 (27
1/2)
Rear clearance mm (in) 200 (8)
Side clearance mm (in) 100 (4) - not including clearance for side fitted flow header
Dimension A mm (in) 1036 (40
Dimension B mm (in) 175 (7) 175 (7) 175 (7) 197 (7
Dimension C mm (in) 1107 (43
Dimension D mm (in) 816 (32
Dimension E mm (in) 553 (21
Dimension F mm (in) 220 (8
3/4) 1036 (40 3/4) 1036 (40 3/4) 1086 (42 3/4) 1140 (45)
3/4) 250 (10)
3/4) 1107 (43 3/4) 1230 (48 1/2) 1353 (53 1/4) 1476 (58 1/8)
1/8) 816 (32 1/8) 939 (37) 1062 (42 3/4) 1185 (46 5/8)
3/4) 553 (21 3/4) 615 (24 1/4) 676 (26 5/8) 738 (29)
5/8) 220 (8 5/8) 220 (8 5/8) 220 (8 5/8) 320 (12 1/2)
1
POSITION OF BOILER
Minimum clearances required from walls or other fixed objects to allow for the free access of combustion air are shown in Table 3 above.
Any combustible material adjacent to the boiler and its flue system must be so placed or shielded as to ensure that its temperature does not exceed 65
0
C (150 0F).
6
Concord CXSi/H - Installation & Servicing
GENERAL
PUMP POSITIONS
Whenever practically possible the circulating pump(s) should be positioned so that it pressurises the system being served. The vertical distance between the pump(s) and any cold feed and expansion cistern MUST comply with the pump manufacturers requirements, in order to avoid cavitation. These requirements override the information given in Frame 3 if the static head required for the pump(s) exceeds that required for the boiler.
MINIMUM FLOW OF WATER - Refer to Table 4
The system design must provide for an adequate flow rate through the boiler at all times when the boiler is firing. The minimum flow rate should correspond to a temperature difference across the boiler flow and return of 35°C (63°F), assessed at catalogue rating.
Table 4 - Flow rates for fully pumped systems
Boiler Minimum flow rates for a
temperature difference of 35°C (63°F)
l/s g.p.m.
CXSi 110/H 0.75 9.9
CXSi 120/H 0.82 10.8
CXSi 140/H 0.96 12.7
CXSi 160/H 1.10 14.6
CXSi 180/H 1.24 16.4
WATER TREATMENT FOR HOT WATER AND HEATING BOILERS
There is a basic need to treat the water contained in all heating and indirect water systems, particularly open vented systems. It is assumed, incorrectly, that because boilers are operating in conjunction with what is apparently a closed circuit an open vented system will not, under normal circumstances, allow damage or loss of efficiency due to hardness salts and corrosion once the initial charge of water has been heated up a few times.
1mm of lime reduces the heat transfer from metal to water by 10%.
In practice the deposition of these salts is liable to cause noises from the boiler body or even premature boiler failure. Corrosion and the formation of black iron oxide sludge will ultimately result in premature radiator failure.
Open vented systems are not completely sealed from the atmosphere if proper venting and expansion of system water is to be achieved. The same tank is used to fill the system with water and it is through the cold feed pipe that system water expands into the tank when the boiler passes heat into the system. Conversely, when the system cools, water previously expanded is drawn back from the tank into the system, together with a quantity of dissolved oxygen.
Even if leakage from the heating and hot water system is eliminated there will be evaporation losses from the surface of the tank which, depending upon ambient temperature, may be high enough to
3
OPEN VENTED SYSTEMS - minimum static head requirements
The information provided is based on the following assumptions:
1. The open vent MUST be brought to either
2. An independent cold feed/expansion pipe
3. The maximum flow rate through the boiler
4. The boiler is at the highest point of
Note. This diagram does not show safety valves, water flow
switches, etc., necessary for the safe operation of the system.
Particular reference should be made to BS. 6644: Section 2; Subsection 10 and Guidance note PM5 "Automatically controlled steam and hot water boilers" published by the Health and Safety Executive. The information and guidance given below is not intended to override any requirements of either of the above publications or the requirements of the local authority, gas or water undertakings.
Other British Standards applicable are BS.5422 and BS.6700.
5. The position of the open vent/safety pipe
1/2" BSP tapping on the flow header
the 1 provided or to the unused 2" BSP flow tapping at the top rear of the boiler.
connection is made to the LH lower front connection. Cold feed/expansion pipe connections made to the pumped system return will result in an increase in the static head requirement, caused by the additional resistance of the distributor tube. Surging may also increase.
is based on a temperature difference of 11°C at full boiler output and the circulating pump is positioned in the flow to the system.
circulation in the system. Systems designed to rise above the boiler flow tappings will automatically require a minimum static head higher than that shown.
above the expansion cistern water level is given as a guide only. The final position will depend upon the particular characteristics of the system. Pumping over of water into the expansion cistern must be avoided.
Concord CXSi/H - Installation & Servicing
7
GENERAL
evaporate a large portion of the system water capacity over a full heating season.
There will always be corrosion within a heating or hot water system to a greater or lesser degree, irrespective of water characteristics, unless the initial fill water from the mains is treated. Even the water in closed systems will promote corrosion unless treated.
For the reason stated Caradon Ideal Limited strongly recommend that when necessary the system is thoroughly cleaned, prior to the use of stable inhibitor, which does not require continual topping up to combat the effects of hardness salts and corrosion on the heat exchangers of the boiler and associated systems.
Caradon Ideal Limited advise contact directly with specialists on water treatment such as:
Fernox Manufacturing Co. Ltd., or Sentinel Division, Tandem House, Marlowe Way Betz Dearborn Ltd., Croydon. Widnes, Surrey CRO 4XS Cheshire, WA8 8UD Tel 0870 601 5000 Tel. 0151 424 5351.
SAFE HANDLING OF SUBSTANCES
Care should be taken when handling the boiler insulation panels, which can cause irritation to the skin. No asbestos, mercury or CFCs are included in any part of the boiler.
INSTALLATION REQUIREMENTS
The appliance must be installed by a CORGI registered installer,
The installation of the boiler must be in accordance with the relevant requirements of the Gas Safety Regulations, current I.E.E. (BS.7671) Regulations, Model Water Bye-laws, local water authority bye-laws and it should also comply with any relevant requirements of the local gas supplier, local authority and the relevant British Standard Codes of practice and building regulations.
Limitations of Intended Operating Environment
These appliances are NOT suitable for installation where they will be exposed to the elements.
A boiler room shall be constructed or adapted to meet the requirements of BS 6644.
The maximum ambient temperature is 32 °C at 1.5 metres from the floor with a maximum humidity of 90% RH.
FOR SMALL PIPE INSTALLATIONS;
BS. 6891: Installation of low pressure pipework
FOR LARGE PIPE INSTALLATIONS
Gas Installations
IGE-UP-1: Purging Procedures of Non-domestic Gas
Installations. Soundness Testing Procedures for Industrial and Commercial.
IGE-UP-2: Guidance notes on the Installation of Gas
Pipework, Boosters and Compressors in Customer’s Premises Equal to or Greater than 25mm (Non-domestic).
IGE-UP-10: Installation of Gas Appliances in Industrial and
Commercial Premises.
BS.6644: Installation of Gas Fired Hot Water Boilers
70kW to 1.8MW (net).
BS 6880 Pt 1-3: Water Supply.
CP342:2: Centralised Hot Water Supply.
Model Water Bye-laws
Manufacturers notes must not be taken, in any way, as overriding statutory obligations.
The appliance must be installed in a room separated from living rooms and provided with appropriate ventilation direct to the outside
- see Table 5.
4
SEALED (PRESSURISED) SYSTEMS
Working pressure 6.0 bar maximum.
Particular reference should be made to BS. 6644: Section 6 and Guidance note PM5 "Automatically controlled steam and hot water boilers" published by the Health and Safety Executive.
The information and guidance given below is not intended to override any requirements of either of the above publications or the requirements of the local authority, gas or water undertakings.
In general commercial closed pressurised systems are provided with either manual or automatic water make up.
On both instances it will be necessary to fit automatic controls intended to protect the boiler, circulating system and ancillary equipment by shutting down the boiler plant if a potentially hazardous situation should arise.
Examples of such situations are low water level and operating pressure or excessive pressure within the system. Depending on circumstances, controls will need to be either manual or
automatic reset. In the event of shutdown both visual and audible alarms may be necessary.
Pressure vessels used must comply with BS. 4814 and must be sized on the basis of the total system volume and initial charge pressure.
Initial minimum charge pressure should not be less than 0.5 bar (7.2 psi) and must take account of the static head and specification of the pressurising equipment. The maximum water temperatures permissible at the point of minimum pressure in the system are specified in Guidance Note PM5.
When make up water is not provided automatically it will be necessary to fit controls which shut down the plant in the event of the maximum system pressure approaching to within 0.35 bar (5 psi) of the safety valve setting.
Other British Standards applicable to commercial sealed systems are:-
BS. 6880: Part 2
BS. 1212
BS. 6281: Part 1
BS. 6282: Part 1
BS. 6283: Part 4
8
Concord CXSi/H - Installation & Servicing
GENERAL
FOUNDATION
The boiler must stand on a non-combustible floor (i.e. concrete or brick) which must be flat, level and of a suitable load bearing capacity to support the weight of the boiler (when filled with water) and any ancillary equipment.
If the boiler is mounted on a plinth then the dimensions must exceed the plan area of the boiler by at least 75mm on each side.
VENTILATION
Safe, efficient and trouble-free operation of conventionally flued gas boilers is vitally dependent on the provision of an adequate supply of fresh air to the room in which the appliance is installed. Ventilation by grilles communicating directly with the outside air is required at both high and low levels. The minimum free areas of these grilles must be according to the following scale:
Table 5 - Ventilation Requirements
Required area (cm2) per kW of total rated input (net)
Boiler room Enclosure
Low level (inlet) 4 10
High level (outlet) 2 5
Note: Where a boiler installation is to operate in summer months (e.g. DHW) additional ventilation requirements are stated, if operating for more than 50% of time (refer to BS6644).
Position ventilation grilles to avoid the risk of accidental obstruction by blockage or flooding. If further guidance on ventilation is required then consult BS.6644.
CHIMNEY SYSTEM
To ensure the safe and satisfactory operation of the boiler then the chimney system (which may be common or individual, in the case of twin or multiple boiler installations) must be capable of the complete evacuation of combustion products at all times. The effective height of the chimney terminal(s) above the boiler outlet(s) must ensure sufficient buoyancy to overcome the resistance of the bends, tees and runs of the flue pipe involved and shall terminate in a down draught free zone. The number of bends and lengths of horizontal flue pipe used should be kept to a minimum in order to reduce gas flow resistance.
Compliance with the recommendations made in BS.6644, IGE UP/10 Installation of Gas Appliances in Industrial and Commercial Premises and the 'Third Edition of the 1956 Clean Air Act Memorandum' should be strictly observed where applicable.
The chimney design should avoid the formation of excessive quantities of condensate. For this reason it is recommended that all chimneys are insulated and lined. In the case of brick or similar structures a stainless steel rigid or flexible flue liner (grade 304/
316) may be used in conjunction with a 50 mm (minimum) thick layer of vermiculite or perlite granules between the liner and the inner skin of the chimney body. Liners should be sealed at both top and bottom.
As the Concord CXSi/H range of boilers is supplied complete with an integral draught diverter, a diverter MUST NOT be fitted within the chimney system.
Drainage points positioned at the bottom of all vertical chimney sections should be provided. Drain pipes should be no less than 25 mm I.D., manufactured from acid condensate resistant material such as stainless steel and be positioned so that pipe runs and discharge points are not subject to the effects of frost and that flue gases cannot leak into the boiler room.
AIR SUPPLY BY MECHANICAL VENTILATION
The supply of air by mechanical means to a space housing the boiler should be by mechanical inlet with natural or mechanical extraction. Mechanical extract ventilation with natural inlet must not be used.
Where a mechanical inlet and a mechanical extract system is applied, the design ventilation flow rates should be as in Table 4 of BS.6644.
The requirements for air supply by mechanical ventilation are given in BS.6644.
Note. For mechanical ventilation systems an automatic control should be provided to cause safety shutdown or lockout of the boiler(s) in the event of failure of air flow in either inlet or extract fans.
IMPORTANT.
The use of an extractor fan in the same room as the boiler (or in an adjacent communicating room) can, in certain conditions, adversely affect the safe operation of the boiler. Where such a fan is already fitted (or if it is intended to fit an extractor fan after installation of the appliance) the advice of the gas supplier should be obtained.
Tests for spillage of products from the draught diverter when the extractor fan is running and all doors and windows are shut should be carried out after installation. If spillage is detected, the area of permanent ventilation must be increased.
Care should be taken to ensure the specification of the chimney is suitable for the application by reference to the manufacturers literature. Caradon Ideal Limited can offer advice on the design of suitable chimney systems.
GAS SUPPLY
If there is any doubt regarding the capacity of the gas meter, the available gas pressure, the adequacy of existing service pipes or the size required for new service pipes then the advice of the gas supplier should be requested.
Installation pipework should be fitted and tested for gas soundness in accordance in accordance with BS. 6891;
IGE-UP-1 for small installations IGE-UP-2 for large installations.
The local gas supplier must be consulted if it is necessary to employ a gas pressure booster.
ELECTRICAL SUPPLY
WARNING. This appliance must be efficiently earthed.
A 230 V - 50 Hz mains supply is required, fused at 5 amps.
Wiring external to the appliance MUST be in accordance with the I.E.E. (BS. 7671) Wiring Regulations and any local regulations which apply.
Concord CXSi/H - Installation & Servicing
For details of connections see Frame 14.
9
5
INSTALLATION
INSTALLATION
CONCORD CXSi BOILER ASSEMBLY - Exploded view
Insulation not shown
Legend
1. Cleanout cover
2. Collector hood
3. Middle section
4. Flow header
5. Section alignment rings & 'O' rings.
6. Thermostat pocket.
7. End section.
10
8. Distribution tube.
9. Downdraught deflector.
10. Section bolt.
11. Drain cock.
12. Base plate.
13. Combustion chamber.
14. Tie rods.
15. Lightback shield.
16. Burner manifold assy.
17. NOx duct.
18. Insulation bracket
Concord CXSi/H - Installation & Servicing
INSTALLATION
6
BOILER SECTION ASSEMBLY
The site assembled boiler is supplied in the following packages:
! Combustion chamber / manifold / burner assembly.
! Platework package.
! Casing package.
! Controls box package.
! End and centre sections.
GENERAL
The installation of the boiler must be in accordance with current Gas Safety (Installation and Use) Regulations or rules in force, building regulations, I.E.E. (BS.7671) Regulations and the bye­laws of the local water undertaking. It should also be in accordance with the relevant British Standard Codes of Practice together with any relevant requirements of the local gas supplier and local authority.
ASSEMBLY
The combustion chamber should be positioned as near as possible to the installation site.
IMPORTANT.
It must be remembered that the boiler distribution tube has to be fitted into the rear return tapping of the assembled boiler before final siting.
Prior to assembling the sections it will be necessary to remove the manifold assembly and burners from the combustion chamber. To do this:
1. Undo the two M5 screws and washers securing the spark generator bracket to the combustion chamber. Undo the union securing the gas valve assembly and remove the gas valve and spark generator assembly from the boiler.
2. Undo the 4 nuts securing the burner manifold to the combustion chamber legs.
3. Undo the nuts securing the burner light back shield to the combustion chamber and lift it off.
4. Pull the whole burner assembly forward on its runners, ensuring that no wires are trapped, and remove it completely from the combustion chamber.
PREPARATION OF SECTIONS
Each section should be brushed clean on all external surfaces and any debris which may have accumulated within the sections should be removed via the bottom ports.
TOOLS REQUIRED
! Spanners
! Torque wrench
! Pozi screwdriver
! Mallet
Section Assembly - refer to the exploded view
5. Take an end section and lift it onto the combustion chamber
so that the combustion chamber side panel return is inside the section rear lip.
6. Locate a slotted steel ring and an ‘O' ring seal into each of the 4 ports. It will be necessary to squeeze the steel ring slightly to enable it to be pushed fully into the recess.
7. Lift a middle section onto the combustion chamber and carefully offer it up to the end section until it engages the projecting steel rings. It may be necessary to use a mallet and hardwood block to ensure that the steel rings are pushed fully into the recessing and that the sections are butted up to each other.
Note. Until the final section is fitted and the tie rods fastened, the sections in the assembly are not fixed together therefore CARE MUST BE TAKEN TO PREVENT the installed sections coming apart.
8. Repeat the assembly procedure for all of the sections until complete.
9. Fit the 4 tie rods through the holes in the sides of the end sections and fit a flat steel washer, a shakeproof washer and a nut to both ends of each tie rod. Screw up all the nuts equally, in turn and, finally, tighten them to a torque of 38-41 Nm (28-30 lb. ft).
10. For open vented systems a site test must be carried out at a hydraulic pressure equal to 1 pressure given in Table 2, for a period of 30 minutes.
Note. If it is a sealed system the hydraulic pressure must be equal to twice the given design pressure for 30 minutes.
11. Fit the 4 coach bolts into the lugs at the bottom of the end sections and through the hole in the retaining angle of the combustion chamber. Fit a flat washer and nut and secure the section assembly to the combustion chamber.
1/2 times the design
INSTALLATION
Concord CXSi/H - Installation & Servicing
11
7
Side elev. of d/deflector-insulation assy.
Con 1902
Sealing rope
Downdraught
deflector
Fixing screw
Collector hood flange
INSTALLATION
INSTALLATION
BOILER SECTION ASSEMBLY - continued
12. Offer the downdraught deflector to the projecting studs at the
back of the combustion chamber and fix, using the nuts and washers provided.
13. Fit the insulation brackets with the screws provided to the downdraught deflector.
14. Refit the burner assembly to the combustion chamber and tighten the 4 nuts securing the burner manifold to the combustion chamber legs. Offer up the burner light back shield to the combustion chamber - with the cutout for the flame detector electrode at the LH end - and fasten, using the M5 nuts and washers.
15. Fit the gas valve and spark generator assembly to the boiler by doing up the union in the gas line and by fastening the
spark generator bracket to the combustion chamber using the two M5 screws and washers.
16. Fit the gas inlet pipe and retain by the semi-circular clamp, screws and washers provided. Tighten both unions and the inlet pipe retaining clamp, ensuring that the gas valve assembly is vertical.
17. To fit the collector hood align the back edge of the horizontal side returns with the rear of the section assembly and fasten down the collector hood (using the M6 screws and nuts provided) through the side fixing points.
18. Wrap the insulation around the heat exchanger with the foil outside, tuck behind the insulation brackets on the downdraught deflector and fasten at the edge, using the foil tabs and tape provided.
19. Fit the NOx ducts into the burner aeration intakes and fasten to the collector hood, using the M5 elongated nuts.
Note.
The insulation MUST be behind the NOx ducts (it will be compressed behind the ducts.)
12
Concord CXSi/H - Installation & Servicing
8
BOILER ASSEMBLY
INSTALLATION
1. Fit the distributor tube into the selected return connection.
Ensure that the tube flange aligns horizontally and that the 2 sealing gaskets are correctly assembled on the tube ­refer to alignment notches.
Fit the 2" tapped flange, using the M10 x 35mm screws and washers provided.
2. Fit the blank flange to the other lower rear connection, using the gasket and M10 x 25mm screws and washers provided.
3. Fit the blank flange to the RH front connection, using the gasket and M10 x 25mm screws provided.
4. The 1
1/4" tapped flange and gasket should be fitted to the
LH front connection with the reducing bush and 1/2" drain cock. If the cold feed/expansion pipe is to be brought directly to the boiler, the close taper nipple and 1 1/4" tee must be fitted so that the drain cock is horizontal. This will reduce the possibility of the drain becoming blocked by debris.
5. Complete the system connections (using suitable jointing compound) as follows:
The cast iron flow header must be fitted in the chosen flow connection which will be either of the 2 top rear tappings. A length of 2" BSP pipe is contained in the Plateware Package for this purpose.
Fit the flow header so that the 1 1/2" vent tapping in the header is vertical. Screw the thermostat pocket into one of the 1/2" tappings. The other 1/2" tapping is used for the pressure gauge provided. The flow header terminates in a 2 1/2" flange connection. The 1 1/2" BSP tapping on the top of the flow header is for a vent pipe ONLY and MUST NOT be used for any other purpose.
A safety valve may be fitted in the remaining top rear tapping, in accordance with CP332:3.
The unused top rear tapping may be used as an alternative and independent open vent / safety pipe connection. The LH front bottom tappings may be used for an independent cold feed / expansion pipe connection.
In order to avoid air locks, reduction in pipe sizes should be made in the vertical plane or eccentric bushes used.
Finally , plug the unused tappings, using the 2" BSP plugs supplied.
INSTALLATION
9
FLUE CONNECTION
1. Complete the secondary flue connection.
The boiler is designed to accept flues to BS.835. If a suitable adaptor is used then flues to BS715 may be fitted.
2. Seal with an approved boiler putty.
3. A split socket should be fitted immediately above the
boiler to facilitate disconnection of the flue.
Concord CXSi/H - Installation & Servicing
10
GAS CONNECTION
Connect the gas supply to the gas inlet pipe - Table 2 gives details of the inlet pipe size.
The use of an approved gas cock and union is recommended here.
13
11
INSTALLATION
CASING ASSEMBLY
4
3
2
1
Con 1466
INSTALLATION
5
6
7
8
9
Legend
1. Side panel.
2. Supporting angle.
3. Top panel.
4. Upper front panel.
5. Control box.
6. Bracket.
7. Support frame.
8. Door panel.
9. Lower panel.
1. Fit the support angle to
the collector hood and fasten, using the M5 screws and washers.
2. Fit the front fixing bracket(s) to the collector hood and fasten, using the M5 screws and washers through the slotted holes.
3. Fit one side panel over its brackets on the combustion chamber base tray and fasten to the support angle, using the M5 screw and washer.
Repeat for the other side panel.
4. Fit the upper front support framework with the overheat thermostat at the bottom and with its green button facing to the RH side and secure to the front fixing bracket(s), using the M5 screws and washers, and to each side panel, using the No.8 screws.
Insulation not shown
5. Fit the 4 shoulder screws into the fixings at the
bottom of the front return of the casing side panels.
6. Finally, ensure correct alignment by slackening and retightening the screws into the slotted holes in the front fixing bracket(s).
14
Con 1906
Overheat 'stat reset button
Concord CXSi/H - Installation & Servicing
INSTALLATION
3
Con 1468
12
CONTROL BOX
1. Make the 3 electrical connections from the overheat
thermostat (fixed to the upper front framework) to the terminals marked 'Limit Stat' on the electrical plug-in connector from the gas valve plug lead assembly, as follows:
C Pink N/O Red N/C White
Ensure that the lead is securely fastened under the strain relief clamp - but bring the earth wire outside the clamp before tightening
2. Unpack the control box. Fit the plug-in connector from the gas valve plug lead assembly to the bottom box at the back of the control box and fasten, using the M4 screws and washer.
N/C
N/O
C
Con 1309
3. Fit the control box to the support frame and fix to the bottom, using the 2 self-tapping screws provided.
INSTALLATION
4. Fit the earth connections from the terminal
plug-in connections to the appropriate earth posts on the back of the control box. Connect the earth lead prefitted to the control box back panel to the threaded hole in the casing support frame.
IMPORTANT
5. Offer up the spark generator assembly to the
combustion chamber base tray and secure the bracket, using the M5 screws and washers. Plug the spark generator leads onto the spark electrode connections on the RH end burner ­access via the side of the combustion chamber.
6. Ensure the electrical cover is correctly fastened to the spark generator.
Flame detector lead
5
Spark
generator
leads
Electrical cover
Con 1912
Concord CXSi/H - Installation & Servicing
Con 1913
6
2 push-in
connections
15
INSTALLATION
8
Con 1914
Spring clip
Overheat thermostat capillary
Control thermostat lead
Thermostat pocket
9
Con 1916
13
CONTROL BOX - continued
7. Run the flame detector lead through the clips on the
front of the combustion chamber base tray and plug it into the flame detector electrode on the LH end burner. Ensure that any slack is tucked neatly into the clips then fasten the clips.
8. Unstrap the thermostat sensor lead and run both the sensor and the overheat thermostat phial through the clips on the appropriate casing side panel to the flow header, ensuring that both leads run under the support angle.
NOx duct
Con 1915
9. Secure both phials into the thermostat pocket in the flow header, using the spring clip.
INSTALLATION
LH Burner
Flame
detector
7
10. Fit the earth connections from the terminal plug-in connections to the appropriate earth posts on the back of the control box. Connect the earth lead prefitted to the control box back panel to the threaded hole in the casing support frame.
11. Fit the casing upper front panel with its location buttons in the slots and push down to locate. Fasten at the bottom, using the No.8 screws.
12. Fit the casing lower front panel by locating its slots over the shoulder screws in the side panels and pushing down to locate.
Earth connections
10
GV1 & GV2 & o/heat thermostat earths
Con 1917
16
Concord CXSi/H - Installation & Servicing
14
Con 1907
  
 
ELECTRICAL CONNECTIONS
INSTALLATION
To gain access to the inside of the control box remove
the 2 M4 screws, lift up the plastic front panel and
lower.
Connection must be made in a way that allows
complete isolation of the electrical supply - such as
a double pole switch, having a 3mm (1/8") contact
separation in both poles, or a plug and socket serving
only the boiler and system controls. The means of
isolation must be accessible to the user after
installation.
This should serve only the boiler, together with its
controls and pumps. The unswitched live supply,
which the boiler requires to allow the pump overrun
facility to operate, should be controlled by the above
switched/fused supply, but should connect from there
directly to the boiler and not via any automatic time
or temperature controls.
The switched live supply should be subject to control
by time and temperature controls in the usual way.
The controls incorporate a pump overrun facility, which
is necessary to dissipate residual heat on plant
shutdown. It is essential therefore that the main pump
(and shunt pump if fitted) is wired to the pump
terminals marked L2, N and Earth on the plug-in
terminal strip on the top box at the rear of the control
box.
The boiler can be controlled either by volt-free external contacts
connected between terminals X1 and X2 or by a switched
live supply brought to X2 (after removal of the factory-fitted
link between X1 and X2), accompanied in each case by a
permanent live supply to terminal L1.
If a separate frost thermostat is fitted it must be wired
across the time switch contacts and if frost is likely the
system should be turned off using the time switch settings
- all other controls including the boiler thermostat knob
should be in the normal running position.
The earth connections MUST NEVER be omitted.
Wire the earths as shown in Frame 13.
All wiring between entry at the rear of the boiler and the
connection box must be secured neatly under the cable
clips provided.
Wiring must never be allowed to come into contact with
the hot boiler body.
If a flow switch is fitted, it should be wired between F
on the terminal plug-in connection on the bottom box
F
2
1
and
at the rear of the control box.
Do not wire these connections in conduit up to the boiler
as this will make it impossible to remove the control box
for servicing or maintenance.
Finally, fit the casing top panel and push down to locate.
INSTALLATION
The main supply to the boiler must be wired to the
boiler terminals L1, N and Earth on the plug-in
terminal strip. This live connection must be
UNSWITCHED, that is a supply not interrupted by
any automatic temperature or time control, to enable
the pump overrun (and the frost protection facility) to
operate.
Failure to operate this procedure will result in nuisance
overheat thermostat operation.
The internal wiring of the boiler control box is shown
in Frame 15.
Wiring should be in four core PVC insulated cable,
not less than 0.75mm
be ASTA approved to BS. 1362.
The length of the conductor between the cord
anchorage and the terminals must be such that the
current carrying conductors become taut before the
earthing conductor, if the cable or cord slips out of the
cord anchorage.
2
(24/0.2mm). All fuses must
Concord CXSi/H - Installation & Servicing
17
INSTALLATION
TEMPERATURE CONTROL
ON/OFF SWITCH
T7335B1051
THERMISTOR
Note: Diagrammatic only - physical positions not shown
VOLT-FREE BOARD
(OPTION)
missing pin on board
blanking pin in female half
N
ON ON
O/H
O/HL/O L/O
S4561B1047
W4115AIC1020
GV2
HIGH
BOILER ON
VOLT FREE CONTACTS
L4
N
L3N
N/O DET
OVERHEAT THERMOSTAT
2
3
PINK
PUMP
FACTORY FITTED
LINKS
EXTERNAL
CONTROLS
TTB
NL2T1 T1L1 X2 N
SUPPLY
F1CF2
X1
LOCKOUT
OVERHEAT
L5
1
N
BR
BR
BR
B
Y/G Y/G
N/C
GV1
LOW
WHITE
RED
BR
DETECTION
ELECTRODE
SPARK
GEN
CONTACT REMOVED AND
FITTED TO MATING HALF
2 X VIOLET
2 X RED
2 X YELLOW
DETECTION LEAD
YELLOW
YELLOW
RED
RED
RED
RED
BLACK
WHITE
ORANGE
BK
GREY
BLUE
ORANGE
ORANGE
VIOLET
VIOLET
YELLOW
RED
BLUE
WHITE
BLUE
WHITE
BROWN
BLUE
ORANGE
YELLOW
BLUE
PINK
RESET
B
BK
B
BR
B
BR
B
BR
L/O
O/H
ON
NF
HI HD
PL PL
N
P
U
M
P
SL
HD
PL
L/O
HL1
HL2
GV
R
BLUE
N/C
N
N/O
N NC
YELLOW/GREEN
Con 6019
B
250
250
15
INSTALLATION
INTERNAL WIRING
LEGEND b blue bk black
br brown r red
y yellow w white
y/g yellow/green or orange
v violet pk pink
18
Concord CXSi/H - Installation & Servicing
INSTALLATION
16
ZONES WITH BI-DIRECTIONAL MOTORISED VALVES
IMPORTANT
Terminal L2 may control the appropriate pump(s) directly, provided that the total running or starting current does not exceed 6A (resistive or inductive): if this rating would be exceeded, then appropriate switchgear must be used to control the pumps indirectly.
Three zones are illustrated but the principles may be extended as required, provided the above conditions are met. Each relay will then require as many contacts as there are zones.
Overrun
Since any zone may be the load during overrun, all zones MUST individually be able to satisfy the conditions in the foregoing paragraph. If not all zones can do this then consider other means of control, detailed on other sheets.
INSTALLATION
Normal operation
When any thermostat is satisfied while others are calling for heat, power is
available via relay contacts to close the valve for that zone. When all thermostats are satisfied (also when the clock period ends) all relays will be off, so the zone valves which were open will remain open for the pump overrun period.
17
ZONES WITH INDIVIDUALLY PUMPED ZONES (3 zones shown)
At the start of the next call for heat (or the next clock period) valves on zones not calling for heat will motor shut.
Water circulation system - refer to page 5
IMPORTANT
Terminal L2 may control the appropriate pump(s) directly, provided that the total running or starting current does not exceed 6A (resistive or inductive): if this rating would be exceeded then appropriate switchgear must be used to control the pumps indirectly.
Three zones are illustrated but the principles may be extended as required, provided the above conditions are met. For each zone (except Zone
1) a relay with 2 C/O contacts is required.
Overrun
During overrun periods, Zone 1 pump performs the overrun facility; this zone, therefore, must satisfy the conditions in the foregoing paragraphs and Graph 1.
Concord CXSi/H - Installation & Servicing
Normal operation
During a call for heat on Zone 1 only, Zone 1 thermostat energises the boiler, which in turn energises Zone 1 pump from terminal L2.
During a call for heat on other zones the appropriate relay directs power to L1 to energise the boiler, at the same time ensuring that Zone 1 pump is controlled by Zone 1 thermostat.
Water circulation system - refer to page 5
19
18
ZONES WITH SPRING-RETURN MOTORISED VALVES
IMPORTANT
Terminal L2 may control the appropriate pump(s) directly, provided that the total running or starting current does not exceed 6A (resistive or inductive): if this rating would be exceeded then appropriate switchgear must be used to control the pumps indirectly.
Three zones are illustrated but the principles may be extended as required, provided the above conditions are met. Only one relay is required, irrespective of the number of zones.
Overrun
INSTALLATION
During overrun and dormant periods, Zone Valve 1 is held open. This zone, therefore, MUST satisfy the conditions in the foregoing paragraphs and Graph 1.
Normal operation
During a call for heat on Zone 1 only, the boiler energises via Zone 1 thermostat and the normally closed contacts of the relay.
INSTALLATION
X2
During a call for heat on other zone(s), the relay will be energised by the auxiliary switch on the zone valves. This provides power to energise the boiler. If, in addition, Zone 1 now calls for heat, its thermostat will open Zone 1 valve via the normally open contacts of the relay.
19
COMMISSIONING AND TESTING
GENERAL
Check that all drain cocks are closed, that any stop valves fitted to the flow and return pipes are open and that the system has been filled and properly vented.
PURGING
Check that the electricity supply is switched OFF.
Remove the casing lower front panel.
Extinguish all naked lights and open all doors and windows. DO NOT SMOKE. Check that the gas supply is turned ON at the meter and open the main gas inlet cock. Loosen the union and allow air to be purged from the gas line until gas is smelled. Refer to BS 6891 or IGE-UP-1 for further details. Retighten the union .
When the clock period ends, Zone valve 1 will (stay) open via normally closed relay contacts to achieve pump overrun.
Water circulation system - refer to page 5
TESTING FOR GAS SOUNDNESS
Close the gas supply cock at the meter.
Remove the screw in the inlet pressure test point, Frames 20/21, and connect a gas pressure gauge to the test point. Take particular care to ensure a gas-tight connection. Open the gas supply cock at the meter and the appliance gas cock; record the static pressure. Next, close the gas supply cock at the meter. Wait for 1 minute for temperature stabilisation then observe the pressure gauge over a period of 2 minutes.
Any leaks must be cured.
Replace all pressure test point screws.
20
Concord CXSi/H - Installation & Servicing
OFF
BOILER ON
OVERHEAT
LOCKOUT
20
Con 1909
8
3
9
11
2
4
+:5E
CONCORD




INITIAL LIGHTING
INSTALLATION
1. Check that the boiler thermostat knob (1) on the control
box (2) is OFF.
2. Ensure that the mains gas inlet cock (3) is open (groove in the square head in line with the gas pipe).
3. Press in and release the overheat thermostat button (4).
4. Switch on the electrical supply to the boiler.
5. Ensure that all system controls (time switch, system
controls etc.) are calling for heat.
6. Turn the boiler thermostat knob (1) to position 6.
6
7
BOILER ON
OVERHEAT
LOCKOUT
1
6
L
O
C
K
O
U
T
R
E
S
5
E
T
4
CONCORD
5
CXSi
10
7. The boiler will light at Low rate and the Boiler-on light (5) will be illuminated. If it does not light the Lockout light (6) will be illuminated. Press in and release the Lockout button (7). The controls will reset and attempt to relight.
8. The burner will remain at Low rate for about 1 minute before going to High rate.
9. Check all connections for gas soundness, using leak detection fluid.
10. Set the boiler thermostat knob and the system controls to the required settings.
11. Turn off the electrical supply to the boiler.
INSTALLATION
LEGEND
1. Boiler thermostat knob.
OFF
2. Control box.
3. Mains inlet gas cock.
4. Overheat thermostat .
1
3
2
Con 1495
5. Boiler on light.
6. Lockout light.
7. Lockout reset button.
8. Burner pressure test point.
9. Inlet pressure test point.
10. Overheat light.
11. High/low gas valve
Concord CXSi/H - Installation & Servicing
21
21
   
 
  

  

  
MANIFOLD GAS PRESSURE - CXSi 110/H-160/H ONLY
The manifold setting pressure must now be checked and adjusted as necessary. It is
essential to set the High Pressure first
Start the adjustment procedure with the system cold, on full load and with all temperature controls set to maximum to avoid thermostatic shutdown. Remove the screw in the burner setting pressure test point and connect a suitable gas pressure gauge.
Turn on the electrical supply to light the boiler and let it operate for about 10 minutes
INSTALLATION
to stabilise the burners. Check the pressure and if it differs noticeably from that given in Table 1 for the appropriate boiler size adjust it as follows:
INSTALLATION
SETTING THE HIGH BURNER PRESSURE
1. Remove the dust cover from the adjustment screw in
the bottom valve and gently screw the adjustment in fully.
2. Remove the plastic dust cover from the adjustment screw on the top (high/low) valve and, using a spanner, screw the adjuster gently fully in then screw the adjuster out until the burner pressure is approximately 10.9 mbar.
3. Finally, screw out the adjustment on the bottom valve until the burner pressure is correctly set to the value given in Table 1.
4. After setting, allow the boiler to operate for 3 minutes to stabilise then recheck the setting.
22
SETTING THE LOW BURNER PRESSURE
5. Turn the boiler thermostat knob to OFF.
6. Disconnect the 'high' solenoid plug from the top valve.
7. Disconnect the LH electrical plug from the bottom valve.
8. Turn the boiler on and set the low pressure to the value
given in Table 1, using the low rate adjustment screw inside the spindle of the top valve.
9. Turn the appliance off and reconnect all the electrical plugs.
Do not overtighten the electrical plug fixing screws.
10. Refit both dust covers over the adjustment screws and refit the pressure test point screw.
11. Check for gas soundness.
Concord CXSi/H - Installation & Servicing
INSTALLATION
Remove plastic dust cover
Con 6024
3
Low rate adjustment screw
Gas rate adjuster maximum
High solenoid plug
22
MANIFOLD GAS PRESSURE - CXSi 180/H ONLY
The manifold setting pressure must now be checked and adjusted as necessary. It is
essential to set the High Pressure first
Start the adjustment procedure with the system cold, on full load and with all temperature controls set to maximum to avoid thermostatic shutdown. Remove the screw in the burner setting pressure test point and connect a suitable gas pressure gauge.
Turn on the electrical supply to light the boiler and let it operate for about 10 minutes to stabilise the burners. Check the pressure and if it differs noticeably from that given in Table 1 for the appropriate boiler size adjust it as follows:
Inlet PTP
INSTALLATION
Con 6023
5
Dust cover
IMPORTANT. Do not adjust the middle valve, which is factory set.
SETTING THE HIGH BURNER PRESSURE
1. Turn the boiler thermostat knob to OFF.
2. Undo the screws holding the electrical plug on the bottom gas
valve and pull it off.
3. Turn the boiler on and remove the plastic dust cover from the adjustment screw on the top gas valve and, using a suitable spanner, screw the adjuster gently fully in. Then screw the adjuster out until the burner pressure is approximately 9.0 mbar.
4. Turn the boiler off and refit the electrical plug on the bottom valve.
5. Turn the boiler on and remove the dust cover from the adjustment screw in the bottom valve. Set the burner pressure to the value in Table 1.
6. After setting, allow the boiler to operate for 3 minutes to stabilise then recheck the setting.
Concord CXSi/H - Installation & Servicing
SETTING THE LOW BURNER PRESSURE
7. Turn the boiler thermostat knob to OFF.
8. Disconnect the 'high' solenoid plug from the top valve.
9. Disconnect the electrical plug from the bottom and middle
valves.
10. Turn the boiler on and set the low pressure to the value given in Table 1, using the low rate adjustment screw inside the spindle of the top valve.
11. Turn the appliance off and reconnect all the electrical plugs.
12. Refit both dust covers over the adjustment screws and refit the pressure test point screw.
13. Check for gas soundness
23
23
SPILLAGE CHECK
24
SERVICING
TESTING
Check that there is no spillage
of combustion products from
the boiler draught diverter by
carrying out a spillage test, as
detailed in BS. 5440:1.
INSTALLATION
25
ADJUSTMENT OF WATER FLOW RATE THROUGH THE BOILER
When commissioning the heating/domestic hot water system the shunt pump must be adjusted to give the minimum flow rate given in Table 4, when that part of the system intended to be used for dissipation of residual heat only is in operation.
26
HANDING OVER
Check the main burner responds correctly to manual on/off operations of any controls fitted in the gas control circuit.
Check the operation of the flame failure safety system by lighting the boiler and then turning the gas inlet cock off.
The Burner On light will go out and the controls will try to relight the boiler. After a period of about 5 seconds, the Lockout light will be illuminated.
Turn on the gas cock again and press in and release the Lockout button. The boiler will relight.
Complete the Commissioning section of the boiler log book.
Important Commissioning / Operating Instructions:
Do not operate this appliance for long periods or take any combustion readings with the casing or any part of the casing removed.
ROUTINE OPERATION
Full instructions covering routine lighting and operation of the boiler are given on the Lighting and Operation Instruction Label located on the inside of the casing door.
Draw the attention of the boiler owner or their representative to the Lighting and Operating Instruction Label on the inside of the front panel. Give a practical demonstration of the lighting and shutting down of the boiler.
Describe the function of the boiler and system controls and show how they are adjusted and used.
Hand over these, the User’s Instructions and the Commissioning & Servicing Log Book to the customer and request him to keep them in a safe place for ready reference.
IMPORTANT. Point out to the owner that the boiler must have regular maintenance and cleaning, at least annually, in order to ensure reliable and efficient operation. Regular attention will also prolong the life of the boiler and should preferably be performed at the end of the heating season.
After servicing, complete the service section of the log book and return it to the owner or their representative.
Recommend that a contract for this work should be made with a CORGI registered installer.
24
Concord CXSi/H - Installation & Servicing
SERVICING
27
SERVICING
Caradon Ideal Limited does not accept any liability resulting
from the use of unauthorised parts or the repair and servicing of appliances not carried out in accordance with the Company’s recommendations and specifications.
A comprehensive service should be carried out at least once a year. The User is advised to make a contract with a CORGI registered installer.
WARNING. ALWAYS turn OFF the gas supply at the gas cock and disconnect the electricity supply to the appliance BEFORE servicing or replacing any components.
If access is required to the electrical plug-in terminals at the back of the control box then remove the casing top panel; it is
not advisable to try and remove the control box back panel from the boiler with the plugs in place.
CLEANING THE BOILER
Remove the casing door panel. Lift and remove the casing lower front panel. Undo and pull off all the plugs from the gas valve solenoids. Turn off the gas at the gas inlet cock. Undo the 2 unions at either side of the gas valve assembly and remove the assembly complete.
Pull off the leads to the spark electrode on the RH end burner
- access via the side of the combustion chamber. Pull off the lead to the flame detector electrode at the LH end burner.
Lift off the casing top panel. Undo the 3 elongated nuts from each of the NOx ducts and remove all the ducts. Undo the M5 nuts and washers retaining the burner light back shield and remove it. Undo the four M6 nuts and washers securing the burner tray and carefully pull it from the boiler, ensuring that no wires are trapped. Undo the screws securing the cleanout cover(s) and remove.
If available, an industrial vacuum cleaner may be useful to assist in this work. When cleaning the burner bars, take care to avoid damage from rough handling to the ignition or detection electrodes.
Inspect the ignition and detection electrodes.
Ensure that they are clean and in good condition. In particular, check that:
1. The ignition electrode shield and base fixing screws are tight.
2. The electrodes are correctly positioned .
3. Check that the gap between the electrode tips is 4mm.
Remove all loose deposits from the heat exchanger (especially from between the fins), using the brush provided, and remove all debris from the combustion chamber floor - take care not to damage the insulation.
Examine the burner assembly. Clean the burner bars by brushing them down with a stiff bristle (not wire) brush. Check each bar carefully to ensure that all flame ports are clear, that there are no cracks and that all surfaces are free from accumulated deposits.
LH burner
4. Reassemble in reverse order. Ensure that no wires are trapped when replacing the burner tray. Refit the flue baffles, cleanout cover, light back shield, NOx ducts, electrode connections and casing panels.
When refitting the plugs to the gas valve solenoids do NOT overtighten the fixing screws.
SERVICING
Concord CXSi/H - Installation & Servicing
25
SERVICING
28
REPLACEMENT OF COMPONENTS - Refer to Frames 5, 31 and 32
GENERAL
WARNING. ALWAYS turn OFF the gas supply at the gas inlet cock and switch OFF
and DISCONNECT the electricity supply BEFORE working on the appliance.
29
GAS CONTROL VALVE
30
MAIN BURNER
1. Undo and pull off all the plugs from the gas valve solenoids.
2. Turn off the gas at the gas inlet cock. Undo the 2 unions at either side of the gas valve
assembly and remove the assembly (complete) to a suitable working area.
3. In order to be able to remove the faulty gas valve it will be necessary to slacken or remove all the screws on either the inlet or the outlet manifold and only those 4 screws securing the faulty gas valve on the other manifold. The faulty gas valve can then be removed and replaced. Ensure that the arrow on the gas valve points in the direction of flow.
4. Ensure that new ‘O’ ring seals are fitted and that the 'O' ring seals on the remaining gas valves are correctly in place. Ensure that all screws are retightened.
5. Test for gas soundness.
6. Recommission the appliance and set the manifold pressure, as described in Frame 21.
31
BURNER AND CONTROLS ASSEMBLY - Exploded View - CXSi 110/H - 160/H
LEGEND
1. Main gas inlet cock.
2. Gas inlet union.
3. 'O' ring seal.
4. High/Low gas control valve
5. Gas control valve.
6. Spark generator.
7. Burner manifold.
8. Main injector.
9. Main burner - LH.
1. Remove the burner tray from
the boiler, as described in Frames 27-28.
2. Each burner can be removed by lifting it at the back and pushing it backward to clear the injector. Disconnect the spark electrode assembly and heat shield from the RH burner (or the flame detector electrode from the LH burner), as necessary.
3. Reassemble in reverse order.
10. Main burner RH.
11. Ignition electrodes.
12. Detection electrode assembly.
PTP Pressure test point.
SERVICING
26
Concord CXSi/H - Installation & Servicing
SERVICING
32
BURNER AND CONTROLS ASSEMBLY - Exploded view - CXSi 180/H
LEGEND
1. Main gas inlet cock.
2. Gas inlet union.
3. 'O' ring seal.
4. High/low gas control valve.
5. Gas control valve.
6. Spark generator.
7. Burner manifold.
8. Main injector.
9. Main burner - LH.
10. Main burner (RH).
11. Ignition electrodes.
12. Detection electrode assembly.
PTP Pressure test point.
33
OVERHEAT THERMOSTAT
1. Pull out the spring clip in the thermostat pocket in the flow
header and pull out the overheat thermostat phial and capillary.
2. Ensure that the electrical supply is switched OFF.
3. Lift off the casing front panel and top panel.
4. Unclip the capillary from its clips on the casing side panel.
5. Undo the 2 screws securing the overheat thermostat
assembly and withdraw the assembly.
6. Undo the screw and remove the cover.
7. Remove the wires
8. Undo the backnut and remove the thermostat.
9. Fit the new thermostat and secure with the backnut.
10. Reconnect the wires as follows:
1. Pink 2. White 3. Red
Reconnect the earth terminal.
SERVICING
11. Reassemble in reverse order.
12. Ensure that the thermostat capillary is rerouted through the
casing side panel clips and that the phial is secure in the pocket fitted to the flow header, using the spring clip.
Concord CXSi/H - Installation & Servicing
27
SERVICING
Printed circuit board support detail
11
1
2
3
12
5
8
9
Con 1911
1
2
10
4
6
7
34
CONTROL BOX - Basic Boiler, Exploded View
SERVICING
LEGEND
1. Wiring clamp.
2. Connection box plug.
3. Connection box.
4. PCB S456B1047
5. Terminal strip
6. Back panel
7. Lockout reset button
8. Thermostat knob
35
CONTROL SENSOR
1. Lift off the casing top panel and front panel.
2. Trace the sensor lead to the pocket in the flow header,
remove the spring clip and remove the sensor phial.
3. Undo and remove the 2 screws securing the control box front panel. Carefully lift up and lower it.
4. Pull out the sensor plug from the PCB and remove the strain relief bush. Remove the sensor and lead.
9. Potentiometer
10. Warning light lens
11. Controls box
12. PCB W 4115A1020
5. Fit the new sensor, ensuring that the lead is routed along
the casing in the clips provided.
6. Reassemble in reverse order.
28
Concord CXSi/H - Installation & Servicing
SERVICING
PCB
Retaining barbs
Con 1910
Plugs
Plugs
Earth connection
Flame detector connection
PCB
Retaining barbs
Con 1910
Plugs
36
CONTROL SENSOR POTENTIOMETER ASSEMBLY
1. Prise the front cap from the thermostat knob.
2. Carefully loosen the brass retaining nut one full turn
anticlockwise
3. Gently pull the thermostat knob from the potentiometer. When reassembling ensure the arrow on the body is lined up in the OFF position.
4. Remove the back nut and brass washer securing the thermostat knob to the panel.
5. Undo and remove the 2 screws securing the control box front panel. Carefully lift it up and lower it.
6. Remove the terminal plugs from the back of the potentiometer.
7. Undo the purse clips holding the wires from the potentiometer
to the PCB then pull the wires out.
8. Remove the connections from the PCB.
9. Fit the new potentiometer and reassemble in reverse order.
Ensure that the connections to the back of the potentiometer
37
PC BOARD S4561B1047
PCB
Plug
Backnut
Potentiometer
Thermostat knob
Con 1500
are made either to the top 2 tags or the bottom 2 tags and that the lug on the body of the potentiometer locates through the hole in the front panel of the control box.
Also ensure that the potentiometer is rotated fully anticlockwise and clicks before commencing the reassembling.
38
PC BOARD W4115A1020
1. Remove the lower front panel.
2. Undo and remove the 2 screws securing the control box front
3. Pull off the 2 plugs and the 2 push-on connections from the
4. Fit the new board and reassemble in reverse order, ensuring
39
The insulation boards used in the combustion chambers of these products contain man-made fibres, refractory fillers, organic and inorganic binders and as such are deemed to be harmless to humans.
Caradon Ideal Limited, however, recommend that for your own comfort and to comply with good working practise the procedure described below is followed.
IMPORTANT. Turn OFF the gas and DISCONNECT the electricity supply.
To replace the insulation boards the major boiler components (including the heat exchanger and burners) have to be removed to gain access to the combustion chamber.
panel. Carefully lift it up and lower it.
board. The board can now be removed by squeezing in the retaining barbs.
that the push-on connections are correctly fitted, as follows (from left to right): Earth - flame detector lead.
COMBUSTION CHAMBER INSULATION REPLACEMENT
Prior to removal of the boards the following protective equipment should be worn:
1 Damp down the combustion chamber area containing the insulation
2. Remove the insulation boards. The replacement boards are supplied
3. Sweep any dampened particles and place in the plastic bag.
4. Fit new insulation boards.
5. Remove the gloves and face mask and place them in the plastic bag.
6. Wash your hands and any areas of skin which may have come into
7. Seal the plastic bag and dispose of it and its contents into a
1. Remove the lower front panel.
2. Undo and remove the 2 screws securing the control
box front panel. Carefully lift it up and lower it .
3. Remove the 4 plugs from the board. The board can now be removed by squeezing in the retaining barbs.
4. Reassemble in reverse order.
Face mask supplied with the spare part.
Gloves supplied with the spare part.
boards.
in a plastic bag. This bag should be retained and the discarded boards should now be placed into it.
contact with any of the particles from the insulation board.
commercial tip.
SERVICING
Concord CXSi/H - Installation & Servicing
29
40
BOILER CONTROL
FAULT FINDING
Before attempting any electrical fault finding ALWAYS carry out the preliminary electrical system checks as detailed in the Instructions for the British Gas Multimeter or other similar commercially available meter.
The preliminary electrical system checks are the FIRST electrical checks to be carried out during a fault finding procedure.
On completion of any service/fault finding task which has required the breaking and remaking of electrical connections the following checks MUST be repeated:
a. Earth continuity
b. Polarity
c. Resistance to earth
Detailed instructions on the replacement of faulty components are contained in the 'Servicing' section of these Installation & Servicing Instructions.
GENERAL INFORMATION
Anti-cycle will be in operation each time the boiler thermostat is satisfied and a rapid demand for heat is required. The same situation will occur if the external controls operate rapidly. This
feature reduces component wear and ensures continuous trouble free operation. The anti-cycle duration is 4 minutes.
If the system pump, with a maximum current of 3A, is connected to the boiler pump terminals, pump overrun will be in operation when the demand for heat is satisfied, and will continue to run for 6 minutes.
Frost protection is inbuilt with the boiler. If the flow temperature falls to approximately 5 operate until the flow temperature exceeds 18 oC. Note that it is designed to protect the boiler and may not protect remote parts of the system. Neither the pump overrun nor the inbuilt frost protection will operate if the boiler thermostat is switched OFF.
The gas valves operate on High/Low and Off principle. The boiler will start at low rate and after 1 minute the high rate gas valve will open. On reaching the set point, determined by the user, the boiler will go to low rate and when the temperature reaches the set point plus 3 close. Should the temperature fall below the set point the boiler will go back to the high rate.
The full sequence control enables a single ignition attempt lasting about 5 seconds and will go to lockout if detection does not take place.
o
C the low rate gas valve will
o
C then the boiler will
41
SIMPLE FLOW CHART OF OPERATION
set point
Demand
= off
Temp
> than
SHUTDOWN
Demand = ON
IGNITION
Flame = ON
LOW RATE
HIGH RATE
Overrun
completed
Temp at
set point
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
30
PUMP OVERRUN
(6 minutes)
4 minutes anti-cycle
Concord CXSi/H - Installation & Servicing
FAULT FINDING
Before carrying out any Fault Finding, ensure that all internal controls are calling for heat and that the overheat thermostat has not operated. There should be 230V ± 10% available at the control box connection.
42
BOILER DOES NOT LIGHT
Is there a spark at the electrode?
YES
Are the gas valve electrical plugs clean and secure?
YES
Is there 230V ± 10% at the gas valve plugs?
YES
Is the gas valve inlet pressure sufficient?
YES
Replace the gas valve
43
BOILER LIGHTS BUT GOES TO LOCKOUT
Is the flame detector and its lead and connections sound
and secure and correctly positioned on the LH end
Measure the flame current - expect approximately 3.5µA
burner?
YES
YES
NO
NO
NO
Is the spark gap approximately 4mm and are the
electrodes, leads and connections clean and secure?
YES
Is there 230V ± 10% at the spark generator
NO
Are connections sound at
the plug-on terminal strip
at the control box?
YES
Replace
PCB S4561B1047
Clean and secure
Check LH end burner, inlet and burner pressure; check
the LH end burner injector
spark generator
YES
Replace
Replace PCB S4561B1047
44
BOILER GOES OUT ON OVERHEAT THERMOSTAT
Is there an unswitched Live supply to terminal L1 on
the plug-on terminal connection at the control box?
YES
Is there sufficient open circuit water volume or load
available on boiler shutdown for the pump overrun?
YES
Is the pump (or shunt pump) wired to terminal L2
Has the boiler thermostat knob been switched to OFF?
in the control box?
YES
YES
NO
Refer to Installation Instructions for details
NO
Replace PCB W4115A1020
Advise USER
Concord CXSi/H - Installation & Servicing
FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING FAULT FINDING
31
SHORT LIST OF PARTS
The following are parts commonly required as replacements, due to damage or expendability.
Their failure or absence is likely to affect the safety and/or performance of this appliance.
When replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers.
Key No. Description Qty. Product No.
Gas valve
28 HONEYWELL VR4605PB2003 CXSi 110/H, 120/H, 140/H, 160/H & 180/H 1 111 867
28.1 HONEYWELL VR4605A 1104 CXSi 110/H & 120/H 1 138 896
HONEYWELL VR4605A 1104 CXSi 180/H 2 138 896
28.2 HONEYWELL VR4605AB 1019 CXSi 140/H & 160/H 1 111 869
When ordering spare parts please quote:
1. Boiler model
2. Boiler serial no. (refer to the data plate on the combustion chamber)
3. Boiler P.I. No. (refer to the data plate on the combustion chamber)
4. Description
5. Quantity
6. Product no.
28.3 Plug and lead CXSi 110/H, 120/H, 140/H, 160/H & 180/H 1 154 734
28.4 Plug and lead CXSi 110/H, 120/H, 140/H & 160/H 1 139 269
28.5 Plug and lead CXSi 110/H, 120/H, 140/H & 160/H 1 112 431
28.6 Plug and lead CXSi 110/H, 120/H, 140/H, 160/H & 180/H 1 155 657
28.7 Plug and lead CXSi 180/H 2 111 870
29 Spark generator 1 139 300
31 Injector 4.02 mm diameter CXSi 110/H 6 013 175
Injector 4.20mm diameter CXSi 120/H 6 013 180
Injector 4.20mm diameter CXSi 140/H 7 013 180
Injector 4.20mm diameter CXSi 160/H 8 013 180
Injector 4.20mm diameter CXSi 180/H 9 013 180
32 Flame detection electrode 1 138 895
32.1 Flame detection lead 1 139 271
33 Main burners ............... Worgas CXSi 110/H & 120/H 5 139 824
Main burners ............... Worgas CXSi 140/H 6 139 824
Main burners ............... Worgas CXSi 160/H 7 139 824
Main burners ............... Worgas CXSi 180/H 8 139 824
34 Main burner (RH end) . Worgas CXSi 110/H - 180/H 1 139 825
36 Ignition electrode 1 112 365
32
Concord CXSi/H - Installation & Servicing
SHORT LIST OF PARTS
Key No. Description Qty. Product No.
45 Control box complete 1 155 641
46 Thermistor 1 154 816
47.1 PCB S4561B1047 (ignition) 1 154 814
48.1 PCB W4115A1020 (Aquastat) 1 154 815
56 Casing assembly complete .................................................. CXSi 110/H & 120/H 1 157 449
56 Casing assembly complete ................................................................ CXSi 140/H 1 157 450
56 Casing assembly complete ................................................................ CXSi 160/H 1 157 451
56 Casing assembly complete ................................................................... XSi 180/H 1 157 452
57 Casing front panel ................................................................ CXSi 110/H & 120/H 1 155 647
57 Casing front panel .............................................................................. CXSi 140/H 1 155 648
57 Casing front panel .............................................................................. CXSi 160/H 1 155 649
57 Casing front panel .............................................................................. CXSi 180/H 1 155 650
58 Casing LH side panel ............................................................... CXSi 110/H-180/H 1 076 978
59 Casing RH side panel .............................................................. CXSi 110/H-180/H 1 076 979
60 Casing lower front panel ...................................................... CXSi 110/H & 120/H 1 138 475
60 Casing lower front panel .................................................................... CXSi 140/H 1 138 474
60 Casing lower front panel .................................................................... CXSi 160/H 1 138 473
60 Casing lower front panel .................................................................... CXSi 180/H 1 138 472
61 Casing upper front panel ...................................................... CXSi 110/H & 120/H 1 155 643
61 Casing upper front panel .................................................................... CXSi 140/H 1 155 644
61 Casing upper front panel .................................................................... CXSi 160/H 1 155 645
61 Casing upper front panel .................................................................... CXSi 180/H 1 155 646
62 Casing top panel .................................................................. CXSi 110/H & 120/H 1 138 465
62 Casing top panel ................................................................................ CXSi 140/H 1 138 464
62 Casing top panel ................................................................................ CXSi 160/H 1 138 463
62 Casing top panel ................................................................................ CXSi 180/H 1 138 462
63A Overheat thermostat ..................... RAK77.4/3835 1 155 791
78 Boiler status neons ............................... Boiler ON 1 154 854
79 Boiler status neons .............. Overheat & Lockout 1 154 855
80 Lockout reset button assembly 1 155 269
Concord CXSi/H - Installation & Servicing
33
NOTES
34
Concord CXSi/H - Installation & Servicing
Concord CXSi/H - Installation & Servicing
NOTES
Concord CXSi/H - Installation & Servicing
Concord CXSi/H - Installation & Servicing
35
Technical Training
The Ideal Boilers Technical Training Centre offers a series of first class training courses for domestic, commercial and industrial heating installers, engineers and
system specifiers. For details of courses please ring: .......... 01482 498 432
Ideal Boilers,
HU5 4JN. Telephone: 01482 492 251 Fax: 01482 448 858. Registration No. London 322 137.
Caradon Ideal Limited pursues a policy of continuing improvement in the design and performance of its products. The right is therefore reserved to vary specification without notice.
P.O. Box 103, National Ave, Kingston upon Hull,
I
deal Installer/Technical Helpline: 01482 498 376
www.idealboilers.com
November 2005 UIN 157 294 A03