6
7
!
1a
!
4
5
Setting the switch password
1. Click on the EZManager screen. The screen is
displayed.
2. Create a new administrator account password in the screen.
3. Enter a new name for the switch (optional step).
4. Adjust the date and time for your time zone (optional step).
5. Click .
Next Welcome to Switch Configuration Set Parameters
Set Parameters
Next
Configuring the zones and selecting devices
1. Select on the screen and then click .
Typical Zoning is the default zone configuration.
2. Enter the number and types of devices that you are connecting to the switch in the
screen.
EZSwitchSetup uses these values to automatically configure the ports on your switch.
Typical Zoning Select Zoning Next
Device Selection
Connecting devices
The screen displays a graphical representation of the switch with the
device connections based on the information that you entered when you configured zones and performed
device selection. The screen shows the connections as missing until you connect the devices that you
specified.
Configure Ports and Connect Devices
1. Install the SFP transceivers in the Fibre Channel ports on the switch to match the ports shown on the
screen.
a. Remove any protector plugs from the SFP transceivers
you are going to use.
b. Position and insert each SFP transceiver until it is
firmly seated.
c. Close the latching bale (if any). Repeat for the other
ports.
2. Make the physical connections to your host and storage devices. Match the physical connections to the
connections shown on the screen.Configure Ports and Connect Devices
a. Remove plastic protector caps from the cable ends (if any),
and position the cable connector so that it is oriented correctly.
b. Insert the cable connector into the SFP until it is firmly seated
and the latching mechanism clicks.
c. The screen shows
missing, valid, and invalid connections as you cable the switch.
Note that it can take up to 15 seconds for the connection to
display as a valid connection. Verify that the connections all
display green and then click .
Configure Ports and Connect Devices
Next
3. The screen will display this message: “Congratulations—you’ve successfully completed the setup!”
4. Click to exit setup. If you used the serial connection for setup, you can remove the serial cable.
Additional configuration options, such as custom zoning, are available from EZManager. See the
for more information on custom zoning, and other switch configuration and management
options.
Finish
Finish
EZSwitchSetup
Administrator’s Guide
© Copyright International Business Machines Corporation 2009. All rights reserved. US Government Users Restricted Rights – Use,
duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
© 2009 Brocade Communications Systems, Inc. All Rights Reserved. Printed in USA
GC27-2271-00
45W6292
IBM, the IBM logo, and ibm.com are trademarks or registered trademarks of International Business Machines Corporation in the
United States, other countries, or both. A complete and current list of other IBM trademarks is available on the Web at
www.ibm.com/legal/
Setting the switch IP address
1. Enter the required information in the screen.
2. If prompted to install Active X or a version of the Java runtime environment, do so. Reboot the setup
computer, if required.
3. Click . The screen is displayed.
4 Click to confirm the addresses. The screen is displayed.
5. Click .
SetSwitch IP Address
Next Confirm IP Address
Next Continue Configuration
Continue with EZManager
1a
2b