3. Training Instructions ......................................................................................... 18
SOU400 HANDBOOK 30012013 Page 3
Page 4
THIS PAGE IS LEFT BLANK
SOU400 HANDBOOK 30012013 Page 4
Page 5
PRODUCT DESCRIPTION
The Hy-Ram SOU400 Squeeze Off Unit has the facility to enable four simultaneous
squeeze points to be executed. The unique design with dual hydraulic cylinders
provides the hydraulic power to squeeze the pipe to the optimum compression,
(squeeze gap set by pipe stop and guide tube sleeve), then the Top and Bottom Beams
are very simply mechanically locked together.
The Hydraulic Cylinders can then be released from the Bottom Beam and the Piston
Rods extended. The hydraulic cylinders can be easily disconnected from the Beams and
Pipe and carried to the desired position for the next squeeze point. The hydraulic
cylinders can now be connected to a second Beam Set and a second squeeze operation
can be carried out. With four Beam Sets being supplied in the standard kit, by
repeating the procedure above, four simultaneous squeeze points can be achieved.
Type and Series of machine:
Year of Manufacture:
Serial Number:
Weight:
This unit is intended for Squeezing off PE pipes within the Gas industry.
No other uses are considered appropriate for this unit.
To use this unit for other purposes without first consulting Hy – Ram
Engineering Co Ltd, could lead to the unit being used for dangerous
applications and may cause injury.
The information contained in this manual is to assist with the safe installation,
operation, maintenance and repair of the equipment.
This information should be made available to all persons who are required to
work with or on the equipment.
Only trained and approved operators familiar with the gas industry should use
this equipment.
If in any doubt as to any aspects of this equipment, the application of this
equipment or the instructions in this handbook, you should contact Hy-Ram
Engineering Co Ltd, for clarification or advice.
SOU400 HANDBOOK 30012013 Page 5
Page 6
EC DECLARATION OF CONFORMITY
We hereby declare that the following machinery complies with the essential health and
safety requirements of the Machinery Directive 2006/42/EC enacted in the United
Kingdom by The Supply of Machinery(Safety) Regulations 2008.
Machine description: Squeeze Off Unit
Make: Hy-Ram Type: SOU400
Serial number: ______________ Year of construction: _____________
Manufactured by: Hy-Ram Engineering Co Ltd.
Pelham Street
Mansfield
Nottinghamshire
NG18 2EY
This machinery has been designed and manufactured in accordance with the following
transposed harmonised European standards.
BS EN ISO 12100:2010 Safety of Machinery - General principles for design. Risk
assessment and risk reduction.
BS EN ISO 13857:2008 Safety of Machinery – Safety distances to prevent hazard
zones being reached by upper and lower limbs.
BS EN 349:1993+A1:2008 Safety of Machinery – Minimum gaps to avoid crushing of
parts of the human body.
BS EN ISO 4413:2010 Hydraulic Fluid Power – General rules and safety requirements
for systems and their components.
BS EN ISO 4414:2010 Pneumatic Fluid Power – General rules and safety requirements
for systems and their components.
A technical construction file for this machinery is retained at the following address:
Pelham Street
Mansfield
Nottinghamshire
NG18 2EY
Signed:__________________________
Date:_____________________________
Name:___________________________
Position:__________________________
Being the responsible person appointed by the manufacturer, and employed by
Hy-Ram Engineering Co Ltd.
SOU400 HANDBOOK 30012013 Page 6
Page 7
A. INTRODUCTION
This manual explains about the machinery and how to use and maintain it. It is
intended for users and should be made available to all persons who are likely to use
the machinery.
There are a number of Warning, Caution and Note Statements and these notify
you of important points:
WARNING: Informs of hazardous conditions which may cause serious bodily harm.
CAUTION: Informs of conditions which may cause damage to equipment.
NOTE: Explains additional or helpful information.
B. DESCRIPTION
The Hy-Ram SOU400 Squeeze Off Unit has the facility to enable four simultaneous
Squeeze points to be executed. The unique design with dual hydraulic cylinders
provides the hydraulic power to squeeze the pipe to the optimum compression,
(squeeze gap set by pipe stop and guide tube sleeve), then the Top and Bottom Beams
are very simply mechanically locked together.
C. HEALTH AND SAFETY NOTES
GENERAL
This Squeeze off unit present dangers from trapping parts of the body between the
slow moving parts and from the hydraulic oil should a hose burst. The danger zone is
the immediate area around the top and bottom beams where the PE pipe is being
squeezed off.
WARNING
BEFORE any work is carried out on this unit, the equipment should be isolated
from the compressor (not supplied)
Other hazards are those involving the lifting of the unit and its component parts. There
are handles on the unit that can be used as lifting points for the component parts.
These are designed to lift the component only and not the unit complete. It is not
envisaged that the assembled unit can be manually handled without the aid of specific
mechanical assistance.
COMPONENT WEIGHTS
Hydraulic Cylinders x 2 38 Kg
Top Beam 14.5 Kg
Bottom Beam 12 Kg
Air operated power unit 32 Kg
This machine is designed to be adjusted and maintained without placing persons at
risk.
SOU400 HANDBOOK 30012013 Page 7
Page 8
WARNING
Users are responsible for ensuring compliance with the Noise at Work
Regulations.
D. ASSEMBLY AND USAGE
Equipment: 1 x Power Unit; Pneumatic Input/Hydraulic Output
c/w Hydraulic Hoses.
2 x Hydraulic Cylinders.
1 x Top Beam.
1 x Bottom Beam.
1 x Pair of stops diameter/SDR to suit pipe to be squeezed.
SAFETY WARNING
See Stop information table for pipe diameter and correct stop to be used.
When squeezing 250mm SDR17.6 pipe use Red Guide Tube Sleeves only, no
stops are required.
Silver coloured Stops to be used with Red Guide Tube Sleeves FITTED, see
Stop information table.
Gold coloured Stops to be used with Red Guide Tube Sleeves REMOVED or all
other pipe sizes, see Stop information table.
Failure to comply with the above will result in unsafe operation.
Dependant on specified requirements, the equipment kit may contain up to 6 x top
beams, 6 x bottom beams and 6 x pairs of stops.
WARNING
These instructions should be followed in sequential order.
Ensure compressor to be used has an outlet pressure of a minimum of 80 psi (5.5 bar)
and a maximum of 100 psi (6.9 bar).
If pressure is outside this range: DO NOT USE!
Compressor unit to be around 70 cfm (2000L/minute), a smaller unit will operate the
SOU slower and a larger unit will operate quicker.
NOTE
Use hydraulic oil ISO VG 32, The reservoir to be filled to ¾ full with new clean
oil, approx 3.5 litre.
Grade ISO VG 46 oil to be used in temperatures of 40°C and above.
SOU400 HANDBOOK 30012013 Page 8
Page 9
These stops are coloured gold and are to be used with the RED GUIDE TUBE SLEEVE REMOVED
pipe o/dsdrmin w/t mm % squeeze squeeze gap mmdrg no.coloureffective length
requiredof stop mm
1801116.48026.24111-716-000132gold26.24
18017.610.38016.48111-716-000133gold16.48
213268.28013.12111-716-000154gold13.12
2251120.58032.80111-716-000130gold32.8
22517.612.88020.48111-716-000131gold20.48
2502111.98019.04111-716-000121gold19.04
250269.68015.36111-716-000120gold15.36
2682610.39018.54111-716-000165gold18.54
2802113.49024.12111-716-000123gold24.12
2802610.79019.26111-716-000122gold19.26
315935.29063.36111-716-000178gold63.36
3151718.79033.66111-716-000170gold33.66
31521159027.00111-716-000125gold27.00
3152612.19021.78111-716-000124gold21.78
3552116.99030.42111-716-000127gold30.42
3552613.69024.48111-716-000126gold24.48
40021199034.20111-716-000129gold34.20
4002615.39027.54111-716-000128gold27.54
The following RED GUIDE TUBE SLEEVE is to be used alone as the stop for 250 x 17.6
pipe o/dsdrmin w/t mm % squeeze squeeze gap mmdrg no.coloureffective length
requiredof stop mm
25017.614.28022.72111-643-000140red22.72
The stops are coloured silver and are to be used with the RED COLOURED GUIDE TUBE SLEEVE (111-643-000140) ADDED
pipe o/dsdrmin w/t mm % squeeze squeeze gap mmdrg no.colouractual stop
requiredlength mm
2501122.78036.32111-716-000006silver13.60
2801125.49045.72111-716-000081silver23.00
28017.615.99028.62111-716-000082silver5.90
3151128.69051.48111-716-000002silver28.76
31517.617.99032.22111-716-000007silver9.50
3551132.39058.14111-716-000003silver35.42
35517.620.29036.36111-716-000005silver13.64
4001136.49065.52111-716-000001silver42.80
40017.622.89041.04111-716-000004silver18.32
32.22
58.14
36.36
65.52
41.04
SOU400 - STOP INFORMATION TABLE
for effectivestop
length add 22.72 mm
36.32
45.72
28.62
51.48
SOU400 HANDBOOK 30012013 Page 9
Page 10
E. OPERATING INSTRUCTIONS
1.0 PREPARATION
1.1 The Hydraulic Rams should always be transported with the Rams closed. This is
to protect the Piston Rods from being damaged.
1.2 The Rams have to be opened before you can start the operation. Make sure
both the Cylinders are fully open.
1.3 Centrally position Bottom Beam underneath the pipe to be squeezed off at the
desired squeeze off point.
1.4 Identify the pipe diameter and SDR and position pipe stops (C1, C2) on the
bottom beam. (Refer to figure 1.0)
1.5 Load one of the Hydraulic Cylinders onto the bottom beam and insert pin on
Chain into the hole in the rod ends. Lock in position with latch A1 (Refer to
Figure 1.0). You will have to open Latch A1 or A2 to do this then close when
Ram is vertical.
1.6 Load second hydraulic cylinder and lock in position with pin and latch A2.
1.7 Ensure latches (B1, B2) on Top Beam are open. Employing 2 operatives, offer
Top Beam up to the hydraulic cylinders whilst slightly tilting one cylinder through
approximately 15° from vertical position. (Refer to figure 2.0)
1.8 With an operative straddling the pipe, pull the Top Beam upwards, (parallel to
the Bottom Beam). Ensure the bottom of the Hydraulic Cylinder tube is hard up
against top of Top Beam and then secure Top Beam in position using latches
(B1, B2).
1.9 Connect the Hydraulic Hoses from the Power Unit to the Hydraulic Cylinders.
(Refer to figure 3.0)
ALWAYS ENSURE COUPLINGS ARE CLEAN BEFORE CONNECTION.
M1, M2 :Male couplings on hydraulic cylinder
F1, F2 :Female couplings on hydraulic cylinder
M3, M4 :Male couplings on power unit hose
F3, F4 :Female couplings on power unit hose
1.10 Connect either Male Coupling on Power Unit hose (M3, M4) to either
Female Coupling on Hydraulic Cylinder (F1, F2)
1.11 Connect either Female Coupling on Power Unit hose (F3, F4) to either
Male Coupling on Hydraulic Cylinder (M1, M2).
NOTE
The connections are Male/Female screw type quick release couplings. When making
coupling connections, ensure that they are fully ‘made’ (i.e. fully tightened together).
The unit is now ready for connection to the compressor.
SOU400 HANDBOOK 30012013 Page 10
Page 11
2.0 CONNECTION TO THE COMPRESSOR
POWER UNIT
2.1 Ensure Vent Valve on Power Unit is in ‘Vent’ position.
2.2 Ensure Directional Valve on Power Unit is in ‘neutral’ (centre) position.
2.3 Ensure Compressor has outlet pressure within the range 80-100psi (5.5-6.9 Bar)
If pressure is outside this range: DO NOT USE!
2.4 Ensure Compressor outlet valve(s) are in closed position and start compressor.
2.5 Check outlet pressure is within range 80-100psi (5.5-6.9 Bar).
2.6 Using suitable hose, connect compressor outlet to inlet port on the pressure
regulator on the Power Unit.
WARNING
The pressure regulator is factory preset. DO NOT ATTEMPT TO ADJUST IT!
2.7 Open compressor outlet valve to supply pneumatic pressure to the Power Unit.
The Power Unit will automatically power up and hydraulic fluid will be pumped
around the vent circuit within the power unit recycling fluid internally.
3.0 OPERATION : SQUEEZE OFF
3.1 Turn the vent valve to the closed position, hydraulic power is now available at
the directional valve.
3.2 Turn the directional valve to the ‘Release Position’. This will effectively open the
cylinders and ensure that they are fully extended and synchronised prior to
squeezing off. (Notice that when the Hydraulic Cylinders reach the ends of their
stroke, i.e. fully open or fully closed, the power unit automatically stops).
3.3 Turn the directional control valve to the ‘Squeeze Off Position’. The Top Beam
will begin to travel downwards and start to squeeze the pipe.
WARNING
Ensure the pipe is loaded centrally across the width of the beams.
3.4 If for any reason the squeeze off is required to be stopped return the directional
valve to the central ‘Neutral’ Position.
3.5 Continue to squeeze until the pipe has fully squeezed off and the pipe stops are
sandwiched tight between the Top and Bottom Beams. As stated in 3.2 above,
the Power Unit will automatically stop in the squeezed position (Refer to figure
4.0).
SOU400 HANDBOOK 30012013 Page 11
Page 12
3.6 Mechanically lock the Top Beam to the Bottom Beam by sliding the latches (B3,
B4) across and tightening the allen screws. The beams are now mechanically
locked together. (Figure 4.0).
3.7 Release cylinder latches (B1, B2) and turn directional valve to release position.
The cylinder will extend leaving the Top and Bottom Beam mechanically locked
together. (Refer to figure 5.0). Allow cylinders to fully extend and Power Unit to
stop.
3.8 Position directional valve in ‘Neutral’ position and vent valve in ‘vent’ position.
The hydraulic hoses can now be disconnected from the cylinders and then the
cylinders can be disassembled from the bottom beam.
3.9 One squeeze off point is now completed. Other squeeze off points can be carried
out by repeating instructions from 1.1 - 3.8, using additional beam sets together
with the original Cylinders/Power Unit.
4.0OPERATION RELEASE
4.1 To release a squeeze off point, the Hydraulic Cylinders should be re-assembled
onto the Bottom Beam.
4.2 Operate machine in the ‘squeeze off’ position and allow cylinders to close until
they contact the Top Beam and the unit is returned to the position as shown in
figure 4.0. Again the power unit will automatically stop.
4.3 Close latches (B1, B2), locking the Top Beam onto the cylinders. The squeeze off
load is now taken hydraulically and the sliding latches (B3, B4) should be
released.
WARNING
Never attempt to release a squeeze off until the load is taken up on the
hydraulic cylinders.
4.4 The machine should now be operated in the ‘release’ position. The Top Beam will
travel upwards and the squeeze off released.
4.5 Allow the cylinders to fully open and the power unit to automatically stop. The
Top Beam can then be disassembled by releasing latches (B1,B2) and tilting the
cylinder. (Similar to figure 2.0, assembly of Top Beam).
4.6 The squeeze off release is now completed and other squeeze points can be
released in the same manner repeating steps 4.1 - 4.5.
NOTE
Before attempting to disconnect couplings from the cylinder, ensure that the power
unit is run for a short time, in the ‘vent’ position to discharge the pressure in the
hoses. (A Coupling cannot be disconnected whilst pressure is locked in the hoses).
SOU400 HANDBOOK 30012013 Page 12
Page 13
HY-RAM ENGINEERING CO LTD
SOU 400 SQUEEZE OFF UNIT
Position squeeze off stops onto bottom bar
for the diameter! SDR combination of the
pipe to be squeezed.
The squeeze off stops set the final squeeze
gap between the beams and ensure the
optimum compression of the pipe walls.
See Stop Information Table.
SOU400 HANDBOOK 30012013 Page 13
Page 14
HY-RAM ENGINEERING CO LTD
SOU 400 SQUEEZE OFF UNIT
Prior to squeezing off ensure that the pipe
is positioned centrally across the width of
the squeeze bar.
SOU400 HANDBOOK 30012013 Page 14
Page 15
HY-RAM ENGINEERING CO LTD
SOU 400 SQUEEZE OFF UNIT
Once the pipe is fully squeezed, operate
latch and mechanically lock top and
bottom beam together.
SOU400 HANDBOOK 30012013 Page 15
Page 16
HY-RAM ENGINEERING CO LTD
SOU 400 SQUEEZE OFF UNIT
Once the top and bottom beams are
mechanically locked, undo cylinder latches
and extend cylinders to the fully open
position.
The cylinders can now be removed.
HY-RAM ENGINEERING CO LTD
SOU400 HANDBOOK 30012013 Page 16
Page 17
SOU 400 SQUEEZE OFF UNIT
SOU400 HANDBOOK 30012013 Page 17
Page 18
HY-RAM ENGINEERING CO LTD
SOU 400 SQUEEZE OFF UNIT
Hydraulic Power Unit: Pneumatic Input / Hydraulic Output.
NOTE
Use hydraulic oil ISO VG 32, The reservoir to be filled to ¾ full with new clean
oil approx 3.5 litre.
Grade ISO VG 46 oil to be used in temperatures of 40°C and above.
MAINTENANCE
There are no internal wearing parts for the user to change.
1.0 DAILY CHECKS
1.1 The Oil level.
1.2 Condition of the hoses.
1.3 Filter Regulator Water trap drained.
1.4 General Condition.
2.0 ANNUALLY
2.1 Oil Change.
2.2 Filter in Regulator be cleaned.
2.3 Suction Strainer in oil tank cleaned.
2.4 Clean out silencer on exhaust.
3.0 TRAINING INSTRUCTIONS
3.1 Only trained operators, familiar with the gas industry should use this equipment.
3.2 Users also need to be made aware of the significant noise that may be generated
by the power unit and of the need to take appropriate precautions.
SOU400 HANDBOOK 30012013 Page 18
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.