Hyline Offroad XJ LOUVERED HOOD PANEL User Manual

Proudly Made In
A
t
,
y
t
d
Qty:
1 Left Side Louver Panel 1 Right Side Louver Panel 1 Steel Template 50 Nylon Locknuts 2 10-32 Pan Head Screws
Congratulations on your purchase of the Hyline Offroad Hood Louver Panel. All of our products are completel manufactured in our facility located in Perkasie, PA. They are designed and engineered by Offroad enthusiasts jus like you to be rock solid at an affordable price. Hyline Offroad would like to thank you for your recent purchase an look forward to serving you in the future.
Optional Winch Installation
Hyline Offroad Staff
Installation Instructions:
XJ Hood Louver Panel Part Number: XJ-50HLP
Ratchet
13mm & 3/8”
Socke
File OR Sandpaper
Clear Spray Paint
1/16”, 13/64” & 1/4”
Electric Drill
Bit
1” Hole Saw
Safety Glasses
1987-2001 Jeep Cherokee
US
Jig Saw OR
Cut Off Wheel
Flat Screw Driver
T:\Hyline Offroad, LLC\Installation Instructions\XJ-50HLP\XJ-50HLP Installation Instructions.doc Page 1 of 1
REV 0 05/20/10
PLEASE READ INSTRUCTIONS BEFORE BEGINNING INSTALLATION
***BEFORE INSTALLING*** If you ordered the Hood Louver Panels raw you should paint, anodize, powder coat, etc. now before installation onto vehicle. PEEL OFF THE VINYL PROTECTANT COVERING BEFORE PAINTING OR FINISHING. If Hood Louver Panel was was ordered black powder coated your now ready to continue to step 1.
Hood Louver Panel Installation
Figure 1
Step 1 – As a safety precaution - Remove the hood from your vehicle before drilling or cutting. First, open the hood and prop open. Then disconnect the Hood Release cable from the latch mechanism bracket.
You may need to bend the bracket forward slightly to gain access to unhook the cable. Now using the 13mm socket you can unbolt the four bolts from the hood hinges. The hood should now be free to remove.
Step 2 – Once the hood is removed, place the hood on a flat, solid work area. To prevent potential scratching you may want to use
painters tape and mask off the areas on the hood that the template comes in contact with that will not be covered by the hood louver
panels. The center area is generally where you want to tape.
Step 3 –Position the steel template so that the top edge of the template is in line
with the top edge of the hood and the notches in the top and bottom of
the template align with the center rib that runs down the center of the
hood. (See Figure 1)
Align Top Cutout with Top Hood Line and
Top of Center Rib
Align Bottom Cutout with Bottom of Center
Rib
T:\Hyline Offroad, LLC\Installation Instructions\XJ-50HLP\XJ-50HLP Installation Instructions.doc Page 2 of 2
REV 0 05/20/10
Loading...
+ 2 hidden pages