HygroMatik FlexLine, FLH 09, FLH 15, FLH 03, FLH 30 Series Manual

...
FlexLine
Electric Heater Steam Humidifiers
ÁFLH.ENKÈ
FLH.EN E-8881164
Certain computer programs contained in this product [or device] were developed by HygroMatik GmbH ("the Work(s)").
Copyright © HygroMatik GmbH [03.12.2018]
FlexLine FLH 03/06/09/15/25/30/40/50/80/100 EN
All Rights reserved.
Current version of this manual can be found at: www.hygromatik.co.uk
HygroMatik GmbH grants the legal user of this product [or device] the right to use the Work(s) solely within the scope of the legitimate operation of the product [or device]. No other right is granted under this licence. In particular and without prejudice to the generality of the foregoing, the Work(s) may not be used, sold, licensed, transferred, copied or reproduced in whole or in part or in any manner or form other than as expressly granted here without the prior written con­sent of HygroMatik GmbH.
Information in this manual is subject to change or alteration without prior notice.
:$51,1*
Risk of electrical shock!
Hazardous electrical high voltage! All electrical work to be performed by certified expert staff (electricians or expert personnel with
eqivalent training) only.
Page 2
1. Introduction ....................................................................................................................... 5
1.1 Typographic Distinctions ................................................................................................... 5
1.2 Documentation .................................................................................................................. 5
1.3 Symbols in Use ................................................................................................................. 5
1.3.1 Specific Symbols related to Safety Instructions ............................................................. 5
1.3.2 General Symbols ............................................................................................................ 5
1.4 Intended Use ..................................................................................................................... 6
2. Safety Instructions ............................................................................................................ 7
2.1 Guidelines for Safe Operation ........................................................................................... 7
2.1.1 Scope ............................................................................................................................. 7
2.1.2 Unit control ..................................................................................................................... 7
2.1.3 Unit Operation ................................................................................................................ 7
2.1.4 Mounting, dismantling, maintenance and repair of the unit ............................................ 8
2.1.5 Electrical ......................................................................................................................... 8
2.2 Disposal after dismantling ................................................................................................ 8
3. Transport ............................................................................................................................ 9
3.1 Overview ........................................................................................................................... 9
3.2 Packing .............................................................................................................................. 9
3.3 Interim Storage .................................................................................................................. 9
3.4 Check for Complete and Correct Delivery of Goods ......................................................... 9
4. Functional Description and Device Composition .......................................................... 10
4.1 Mode of Action .................................................................................................................. 10
4.2 Operational sequence ....................................................................................................... 11
4.3 Internal Output Setting ...................................................................................................... 11
4.4 Mechanical Construction ...................................................................................................11
5. Mechanical installation ..................................................................................................... 12
5.1 Environment Parameters to be met and Mounting Recommendations ............................. 12
5.1.1 Dimensions and Mounting Directions ............................................................................. 13
5.2 Unit Installation Check ....................................................................................................... 16
5.3 Absorption Distance BN ....................................................................................................17
5.3.1 Determining the Absorption Distance ............................................................................. 17
5.3.2 Absorption Distance Nomogram .................................................................................... 18
5.4 Steam Manifold ................................................................................................................. 19
5.4.1 General installation guidelines ....................................................................................... 19
5.4.2 Recommendations for dimensioning .............................................................................. 19
5.5 Steam line and condensate hose layout .......................................................................... 22
5.5.1 Guide lines for steam line design ......................
5.5.2 Condensate hose layout ................................................................................................. 22
5.5.3 Steam line and condensate hose installation types ....................................................... 23
6. Water connection .............................................................................................................. 24
6.1 Water supply ..................................................................................................................... 24
6.2 Water discharge ................................................................................................................ 26
6.3 Water connections final check ........................................................................................... 27
............................................................ 22
Page 3
7. Electrical connection ........................................................................................................ 28
7.1 Electrical installation approach ..........................................................................................28
7.2 Cable connections ............................................................................................................. 29
7.3 Safety interlock .................................................................................................................. 30
7.4 Connection diagram .......................................................................................................... 30
7.5 Electrical installation check list .......................................................................................... 30
8. Commissioning ................................................................................................................. 31
9. Maintenance ....................................................................................................................... 32
9.1 General .............................................................................................................................. 32
9.1.1 Service messages .......................................................................................................... 32
9.1.2 Service messages for preventive maintenance .............................................................. 32
9.1.3 Safety instructions for maintenance ............................................................................... 33
9.2 Maintenance frame work when unit is operated with fully demineralised water and condensate
................................................................................................................................................. 34
9.3 Maintenance when unit is operated with tap water or partially softened water ................ 34
9.4 Removing and cleaning the steam cylinder ....................................................................... 35
9.5 Steam cylinder and cylinder base cleaning ....................................................................... 39
9.6 Level control device cleaning ............................................................................................ 40
9.7 Heater element replacement ............................................................................................. 41
9.8 Thermo switch replacement (for heater elements) ............................................................ 41
9.9 Releasing a thermo switch that has triggered ................................................................... 42
9.10 Inspection of wiring connections and heater element wiring ........................................... 42
9.11 Removal and reinstallation of the solenoid valve including fine filter cleaning ............... 43
9.12 Cleaning of blow-down pump .......................................................................................... 44
9.13 Inspection of hoses ......................................................................................................... 44
9.14 Functional check ............................................................................................................. 44
9.15 Completion of maintenance ............................................................................................. 45
10. Dismantling ...................................................................................................................... 46
11. Declaration of Conformity .............................................................................................. 47
12. Spare Parts ...................................................................................................................... 48
13. Technical specifications ................................................................................................. 50
14. Exploded view ................................................................................................................. 52
15. View of housing ............................................................................................................... 53
Page 4
3OHDVHQRWH
'$1*(5
:$51,1*
127,&(127,&(
3OHDVHQRWH

1. Introduction

Dear Customer,
Thank you for choosing a HygroMatik steam humidifier.
HygroMatik steam humidifiers represent the latest in humidification technology.
In order to operate your HygroMatik steam humidifier safely, properly and efficiently, please read these operating instructions.
Employ your steam humidifier only in sound condition and as directed. Consider potential hazards and safety issues and follow all the recommendations in these instructions.
If you have additional questions, please con­tact your expert dealer.
For all technical questions or spare parts orders, please be prepared to provide unit type and serial number (see name plate on the unit).
Versions in Other Languages
These operating instructions are available in several languages. If interested, please con­tact HygroMatik or your HygroMatik dealer.

1.3 Symbols in Use

1.3.1 Specific Symbols related to Safety Instructions

According to EN 82079-1 (and ANSI Z535.6), the following signal words are used within this document:
DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury.

1.1 Typographic Distinctions

preceded by a bullet: general speci­fications
» preceded by an arrow: Procedures
for servicing or maintenance which should or must be performed in the indicated order
Installation step which must be
checked off.
italics Terms used with graphics or draw-
ings

1.2 Documentation

In addition to this manual, the appropriate FlexLine Control documentation is mandatory for the operation of the unit.
WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury.
&$87,21
CAUTION indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
NOTICE is used to address practices not related to physical injury.

1.3.2 General Symbols

This symbol is used whenever a situation requires special attention beyond the scope of safety instructions.
Retention
Please retain these operating instructions in a secure, always accessible location. If the product is resold, turn the documentation over to the new operator. If the documenta­tion is lost, please contact HygroMatik.
Page 5

1.4 Intended Use

HygroMatik electric heater steam humidifiers serve for steam production based on tap water, partially softened water or fully desali­nated water/cleaned condensate.
Proper usage also comprises the adherence to the conditions specified by HygroMatik for:
installation
dismantling
reassembly
commissioning
operation
maintenance
disposal.
Only qualified personnel may operate the unit. Persons transporting or working on the unit must have read and understood the cor­responding parts of the Operation and Main­tenance Instructions and especially the chapter 2. „Safety Notes“.
Additionally, operating personnel must be informed of any possible dangers by the pro­vider. A copy of this manual is to be placed at the unit‘s operational location.
By construction, HygroMatik steam humi­difiers are not qualified for exterior appli­cation.
:$51,1*
Risk of scalding!
Steam with a temperature of up to 100 °C (212 °F) is produced. Do not inhalate steam directly!
Page 6
127,&(127,&(

2. Safety Instructions

These safety instructions are required by law. They promote workplace safety and accident prevention.
2.1 Guidelines for Safe Opera­tion

2.1.1 Scope

Comply with the accident prevention regula­tion „DGUV Regulation 3“ to prevent injury to yourself and others. Beyond that, national regulations apply without restrictions.

2.1.2 Unit control

Do not perform any work which compromises the safety of the unit. Obey all safety instruc­tions and warnings present on the unit.
Risk of material damage!
The unit may be damaged if switched on repeatedly following a malfunction without prior repair.
Rectify defects immediately!
The unit must not be operated on a DC power supply.
The unit may only be used connected to a steam pipe that safely transports the steam.
Regularly check that all safety and monito­ring devices are functioning normally. Do not remove or disable safety devices.
In case of a malfunction or electrical power disruption, switch off the unit immediately and prevent a restart. Repair malfunctions promptly.
:$51,1*
Restricted use.
IEC 60335-1 stipulates as follows: This device may be used by children of eight years of age and above as well as by persons with reduced physical, sensory or mental ca­pabilities or lack of experience and knowledge so long as they are supervised or have been instructed regarding the safe use of the de­vice and understand the hazards that may re­sult from it. Cleaning and user maintenance of the unit must not be undertaken by children without supervision.

2.1.3 Unit Operation

:$51,1*
Risk of scalding!
Uncontrolled hot steam escape in case of leaking or defective components possible. Switch off unit immediately.
Page 7
127,&(127,&(
127,&(127,&(
127,&(127,&(
2.1.4 Mounting, dismantling, mainte­nance and repair of the unit
Use only original fuses with the appropriate amperage rating.
The HygroMatik steam humidifier is IP20 pro­tected. Make sure that the unit is not object to dripping water in the mounting location.
Installing a humidifier in a room without water discharge requires safety devices to protect against water leakages.
Use genuine spare parts only
After any repair work, have qualified
personnel check the safe operation of the unit
Attaching or installing of additional
components is permitted only with the written consent of the manufacturer
Regularly check the unit‘s electrical equip­ment. Promptly repair any damage such as loose connections or burned wiring.
Responsibility for intrinsically safe installation of the HygroMatik steam humidifiers is incumbent on the installing specialist com­pany.

2.2 Disposal after dismantling

The operator is responsible for the disposal of unit components as required by law.

2.1.5 Electrical

:$51,1*
Risk of electrical shock!
Hazardous electrical voltage!
Any work on the electrical system to be per­formed by certified expert staff (electricians or expert personnel with comparable training) only.
Disconnect unit components from electrical power supply prior to work.
After electrical installation or repair work, test all safety mechanisms (such as grounding resistance).
Page 8
3OHDVHQRWH
3OHDVHQRWH
3OHDVHQRWH

3. Transport

3.1 Overview

Proceed carefully when transporting the steam humidifier in order to prevent damage due to stress or careless loading and unload­ing.

3.2 Packing

Pay attention to the icons affixed to the pack­ing box.
Time limits for filing freight claims with ship­ping companies are*:
Shipping company
Carriers no later than 4 days
Parcel service immediately
* Time limits for some services subject to change.
After receipt of
goods

3.3 Interim Storage

Store the unit in a dry place and protect from frost and strong sunlight.
3.4 Check for Complete and Cor­rect Delivery of Goods
Upon receipt of the unit, confirm that:
model and serial number on the
name plate match those specified in the order and delivery documents
the equipment is complete and all
parts are in perfect condition
In case of damage from shipment and/or missing parts, immediately notify the carrier or supplier in writing.
Page 9
Control switch
Display
Main contactor
Blow-down pump
Cable bushings
Waste water outlet
Main board (control)
Connector for heater element wiring
Solid state relay on heat sink
Water inlet
Solenoid valve
Cylinder base
Heater element
Steam cylinder
Steam hose adapter
Steam exit
Thermo switch
Level control

4. Functional Description and Device Composition

4.1 Mode of Action

The immersion heater principle
Depending on the output rating, one, three or six heater elements are arranged within a closed cylinder. The FlexLine humidifiers FLH80 and FLH100 combine two steam cylin­ders in one housing.
Examplary given, the figure below shows the heater element and other main components of a FlexLine steam generator model with one steam cylinder.
The cylinder(s) are filled with either tap water of varying quality, fully desalinated water or partially softened water.
The heat introduced by the heater elements heats up the cylinderwater to approx. 100 °C (212 °F), transforming the water into steam
with a temperature of approx. 100 °C (212 °F) This steam is virtually mineral-free and germ­free.
When fully desalinated water is used, the cy­linder water is almost totally clear of minerals. This situation guarantees a long lifetime of the cylinder(s) and the heater element(s), since virtually no hardeners will fall-out and no min­eral deposits will occur. Such, the number of inspections and/or maintenance operations required will be reduced to a minimum.
When tap water is used for operation, some of the minerals dissolved in the water are likely to settle in the cylinder in form of solids of various compositions. However, most of the solids are flushed out by cyclic blow-down with the help of a heavy-duty blow-down pump.
Page 10

4.2 Operational sequence

The steam humidifier is switched on by pressing the control switch on the front panel to the „I“ position. If the safety chain is
*
closed, the inlet solenoid valve (25) and water is fed into the steam cylinder.
Filling level in the cylinder is controlled by a level control device (27)
*)
. In a plastic cylin­der, connected to the steam cylinder via hoses in the way communicating tubes are connected, a sensor for continous propor­tional water level survey is located.
The cylinder water is periodically blown down. For usage of the unit with fully deselin­ated water, the blow-down function may be blocked.
Water blow-down is achieved by means of
*)
the blow-down pump (32)
that is continously monitored during unit operation. In case of pump disruption, the HygroMatik steam humidifier is shut off.
opens

4.3 Internal Output Setting

Continuous control is achieved by propor­tional driving (pulse width modulation) of one of the heater elements and phased addition of further elements. In this way the humidifier can be proportionally operated across the entire output range of 5% - 100% of the nomi­nal capacity. A power setting of 0% to 5% of the nominal output is possible, but not technically feasible due to condensate losses in the steam line.

4.4 Mechanical Construction

The HygroMatik FLP series units feature a stainless steel steam cylinder and - as an ordering option - a fourfold solenoid valve for the exceedingly precise steam control.
The type of housing is designed for wall mounting.
With normal water quality, blow-down loss is in the range of 7 to 15% of the steam amount produced. Depending on water quality, a full steam cylinder blow-down is run every 3 to 8 days.
Mineral deposits settle in the open area below the heater element(s) and are removed through periodic maintenance. The blow-down pump itself has wide openings and can flush out smaller pieces of mineral deposit. This extends the service life of the unit and reduces the required maintenance interval.
On blow-down, water flows from the pump into the drain hose system.
For maintainence purposes, the cylinder water may be pumped out by pressing and holding the control switch in the „II“ position.
*)
numbers indicated correspond with those in the exploded view in the „Exploded view“ chapter.
Page 11
:$51,1*
:$51,1*

5. Mechanical installation

Risk of foot injuries!
Prevent unit from dropping during installation! Helping hand of a second person is advis­able.
Risk of electrical shock!
Hazardous electrical voltage. During installation, the unit must be discon­nected from power supply.
5.1 Environment Parameters to be met and Mounting Recom­mendations
When selecting the installation site for the steam humidifier, take the following into account:
The minimum clearances indicated in
the fitting measures section must be observed in order to ensure adequate unit ventilation and allow for unobstruc­ted access in case of maintenance
Protection class IP20
Installation in a closed room requires aeration and, eventually, temperature conditioning in order to meet the a.m. environmental conditions
The steam humidifier should be installed as close as possible to the steam manifold. Optimum perfor­mance is only guaranteed when steam and condensate hoses are kept short
Make use of existing water connections for supply and draining
Hoses must be laid at a consistent 5 to 10 % incline/decline; sagging and kin­king prevention is a must
Mount the unit on a stable, preferably solid wall offering the bearing capacity required (s. unit technical specificati­ons). If such a wall is not at hand, the unit may be attached to a stand bracket firmly bolted to the floor
For proper functioning of the level con­trol, plumb and level installation of the unit is required
The steam humidifier rear panel heats up during operation to a maximum of 70 °C (158 °F). Take care that the con­struction on which the unit is to be mounted is not made of temperature­sensitive material
By design, HygroMatik steam humidi­fiers are not qualified for outdoor instal­lation (electronical components and water-bearing parts may be damaged)
Ambient temperature must lie between +5 and +40 °C (+41 and +104 °F) in order to protect the unit electronics against damage; frost may damage the steam cylinder, the solenoid valve and pump, as well as make hoses burst
Relative humidity must not exceed 80 % r.h., since values beyond may lead to electronic malfunction or dam­age
Page 12
Z
X
Y
<
=; $
%
Detailed measurements under
https://www.hygromatik.com/files/pdf/hygromatik-flexline-dimensionsv13.pdf .
3D models under https://www.hygromatik.com/en/downloads

5.1.1 Dimensions and Mounting Directions

Table of dimensions
Model X Y Z A B
[mm] [inch] mm] [inch] mm] [inch] mm] [inch] mm] [inch] FLH03 - FLH09 540 223 535 211 320 126 390 153.5 400 157.5 FLH15-FLH30 540 213 695 274 320 126 390 153.5 560 220.5 FLH40-FLH50 640 252 785 309 420 165 490 193.9 650 255.9 FLH80-FLH100 1170 461 785 309 420 165 1000 393.7 660 259.8
Page 13
>500/19.7
>200/7.8
>300/11.8
>50/2.0
device rear
suspension brackets
Wall clearances
When mounting the steam humidifier, the wall clearances shown in the fig. below must be obeyed:
all measures in mm/inch
Mounting principle
For wall mounting drill measures, please consult the table above (measure A). In case of no suitable wall available for mounting the unit, it is recommended that installation is made on brackets firmly anchored in the floor.
» mark the holes for the upper sus-
pension brackets
screws
» drill holes and dowel » screw in the supplied mounting
screws; let the screws protrude approx. 12 mm
/.5 inch from wall
» ensure firm fixation and load-carry-
ing capacity of the mounted screws!
» hook in the unit and ensure safe
suspension
» mark the holes for the lower suspen-
sion brackets screws » remove the unit » drill holes and dowel » hook in the unit and mount the lower
screws firmly
To function properly, the steam humidifier must hang level and plumb.
Page 14
cable entries
waste water connection
water inlet
steam outlet
device front
Device connections:
Page 15

5.2 Unit Installation Check

Before start-up, pls. check proper unit instal­lation following the list below:
Unit perpendicularly aligned in both
the vertical and horizontal axis ?
All clearances obeyed?
Steam hose installed with a 5 - 10 %
minimum incline/decline (see chap­ter "Steam line“) ?
Condensate hose features a loop
functioning as a steam barrier (see chapter „Condensate hose“) ?
Steam manifold(s) properly positio-
ned?
All bolts and clamps properly tighte-
ned?
Steam manifold(s) horizontally mon-
ted and suspended on the free end, if required ?
All seals (o-rings) in place?
All ventilation slots on housing top
unobscured?
Page 16
o
D
m
o
D
m

5.3 Absorption Distance BN

The "absorption distance" (BN) is defined as the distance from the steam feed to where
the steam is completely absorbed in the treated air. Within the absorption distance, steam is visible as mist in the air stream.
Condensation may occur on anything installed within the absorption distance.
Although steam outside the absorption dis­tance (B
) is completely absorbed, it is not
N
yet evenly diffused in the duct. If you plan to install any parts or devices inside the absorp­tion distance, such as sensors or elbows, we recommend increasing the absorption dis­tance using the formulae below. The absorp­tion distances required for certain installed fittings are distinguished by separate sym­bols and calculated as a multiplier of the absorption distance B
.
N
Absorption Distance
B
N
for normal obstructions such as sensors, ventila­tors, outlets
= (1.5...2) x BNfor fine fiters, heat regis-
B
c
ters
B
= (2.5...3) x BNfor particle filters
s
B
= (3...5) x B
d
for humidity sensors,
N
duct humidistats
quantity of steam introduced in kg/h.
air speed w
Tot al l eng th l
installed in the air duct
Length I
of the usable steam manifold
D
depends on the dimensions of the air duct. The length of the absorption distance can be reduced by using multiple steam manifolds (also see section on the steam manifold).
Method:
Graphically determine absorption distance B
using the absorption distance nomogram
N
(also see Section „Absorption Distance Nomogramm“). Enter the value of the param­eters enumerated above into the respective quadrants. The resulting point of intersection indicates the value of the desired absorption distance B
.
N
Notes:
Air humidity before humidification x
Air temperature after humidification t
Specific increase in humidity x:...........[g/kg]
in m/s in air duct
L
of the steam manifold
D
:....[g/kg]
1
:.....[°C]
2
The absorption distance has no fixed value, but depends on many factors. These are depicted in the absorption distance nomo­gram below.

5.3.1 Determining the Absorption Distance

To determine the absorption distance, the fol­lowing parameters are required:
Air humidity before humidification x
in g/kg
Air temperature after humidification
in °C (with steam humidifiers the
t
2
change in air temperature due to humidification may be disregarded t
or t2)
1
Specific increase in humidity x in
g/kg (can be determined in the h,x diagram)
1
Quantity of steam introduced :.........[kg/h]
Air speed W
Total length of steam manifold l
:..........................................[m/s]
L
:...........[mm]
D
Page 17
Loading...
+ 37 hidden pages