Hydro Systems Lucy 7236, Entré 6632, Emma 6042, Sydney 7240, Angel 6642 Installation Manual

...
INSTALLER -
Please pass these
IMPORTANT
instruction along to
the homeowner!
DESIGNER COLLECTION
IMPORTANT SAFETYINSTRUCTIONS
GENERAL INSTRUCTIONS
INSTRUCTIONS PERTAINING TO A RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS.
Follow All Instructions, Installation Instructions, General Requirements ...............................PAGE 2
General Requirements For Installation cont. .........................................................................PAGE 3
Electrical Requirements, Installing The Tub ..........................................................................PAGE 4
Test The Whirlpool System, Setting The Tub ........................................................................PAGE 5
Operating Instructions, Figure 3 ............................................................................................PAGE 6
User Care And Maintenance .................................................................................................PAGE 7
Limited Warranty ...................................................................................................................PAGE 8
Please refer to www.hydrosystem.com for videos on how to install your bathtub and get specific dimensions on your
model bathtub
– 1 –
WARNING: When using your Hydro Systems whirlpool tub, basic precautions should be followed.
READ AND FOLLOW ALL INSTRUCTIONS.
1. DANGER: To reduce the risk of injury, do not permit children to use this unit unless they are closely supervised at all times.
2. Use this unit only for its intended use as described in this manual. Do not use attachments not recommended by the manufacturer.
3. Never drop or insert any object into any opening.
4. Do not operate this unit without suction cover installed.
5. The unit must be connected only to a dedicated electrical supply circuit that is protected by a Ground Fault
Circuit Interrupter (GFCI). The GFCI must be provided by the installer and should be tested on a routine basis by the homeowner. To test the GFCI push the test button. The GFCI should interrupt power. Push the RESET button. Power should be restored. If the GFCI fails to operate in this manner there is a ground current fault, indicating the possibility of an electric shock. Do not use the tub. Disconnect the power and have the problem corrected by a qualified service representative. Re-test the GFCI and only when it is operating properly may the whirlpool tu be used.
6. A terminal is provided on the exterior of most equipment. To reduce the risk of electric shock, connect this terminal
to the grounding terminal of your electric service or supply panel with a conductor equivalent in size to the circuit conductors supplying this equipment.
WARNING: This product can expose you to chemicals including styrene, which is known to the State of California to
cause cancer. For more information, go to www.P65Warnings.ca.gov.
Save These Instructions
INSTALLATION INSTRUCTIONS
1. DANGER: RISK OF ELECTRICAL
interrupter.
2. This unit should be installed by a qualified service representative. All electrical connections should be made by a licensed electrician. Grounding is required.
3. The installation of Hydro Systems bathtubs must meet all applicable codes and regulations.
4. READ ALL THE INSTRUCTIONS before you begin the installation.
5. INSPECT THE TUB before you begin the installation. Inspect the following:
Is it the correct model? The corect size? The correct color?
If options or upgrades were ordered, are they complete and correct?
If the tub was ordered with components in non-standard locations, check to make sure they all are in their correct
locations.
Check all components to make sure no damage occurred during shipping.
For Tubs with Tile Flange inspect for positive draft to bathing well
DO NOT INSTALL THE TUB if any of the above is not correct.
Contact the dealer where the bathtub was purchased or call Hydro Systems directly at 661-775-0686.
SHOCK. Connect only to a circuit protected by a ground fault circuit
You will need to know the bathtub serial number attached to your warranty card and also located on the back side of the bathtub when contacting Hydro Systems.
– 2 –
– 3 –
Please refer to www.hydrosystem.com for videos on how to install your bathtub and get specific dimensions on your
model bathtub
GENERAL REQUIREMENTS FOR INSTALLATION
MECHANICAL REQUIREMENTS:
1. WEIGHT: Tubs must be installed in a location that will support the combined weight of the tub plus the water
plus the bather. As a rule of thumb, this will be a maximum of 1000 lbs. for a 60" tub, 1200 lbs. for a 66" tub, and
1400 lbs. for a 72" tub.
2. TILE FLANGES: Tubs can be installed as a drop-in unit or they can be installed against one, two or three walls. Tubs installed against walls should be ordered with a tile flange on each side that will be against a wall t provide a leak free water barrier.
3. FRAMING: When framing it is best to measure the actual tub to be installed to determine faming dimensions. In the abscence of the actual tub, refer to the Hydro Systems catalog drawings or website at www.hydrosystem.com.
The two most common types of installations are DROP-IN and THREE WALL installations. DROP-IN (Figure 1) For drop-in, or deck-mounted tubs, the finished height of the deck (X) where the tub will sit must equal the dimension from the trimmed edge of the tub to the floor at the drain end of the tub (A) plus 1”. The 1” is for the mortar bed.
A
X
1"
Mortar
Figure 1a
1"
Figure 1b
1"
NOTE: Tub lip resting on ledge, stringer or frame is non-weight bearing.
Tub MUST be supported by mortor only.
IMPORTANT - the deck must be level both front to back and side to side. If it is not level, the tub will not be level and it will not drain properly. The opening into which the tub will be dropped should be cut 1" smaller than the tub all around. For example, for a 60" x 42" rectangular tub, an opening 58" x 40" will extend 1" under the lip of the tub all the way around and will provide clearance for the whirlpool system. In the case of oval and round tubs, Hydro Systems ships a full size paper template with the tub.
THREE WALL: For tubs installed in a three wall enclosure, the tub will need a rough opening the same size as its overall dimensions. For example, a 60" x 42" tub will need a space 60" x 42" for installation. Do not include finish wall coverings (wall board, tile, etc) in your rough framing calculations. Studs and walls should be straight and plumb, and corners must be square. Stringers must be provided to support the deck where it meets the wall.
IMPORTANT - The stringers must be level both front to back and side to side. If they are not level, the tub will not be level and it will not drain properly.
On tubs with integral tile flanges, (Figure 2a) measure the distance from the underside of the tub deck to the bottom
of the tub base at the drain end of the tub (A) plus 1" for the mortar bed. On tubs with integral tile flanges and a s irt panel, (Figure 2b) measure the distance from the top of the stringer to the floor (X) must equal the distance from the bottom of the skirt to the top of the deck (B), minus 1/4" (the thickness of the tub deck).
Loading...
+ 5 hidden pages