Hydra-Flex Aqua-Lab SD Operating Manual

AQUA-LAB SD
Chemical Dispensing System
Operating Manual
REV A
Operating Manual

Specifications

1. Operating water pressure: 200 psi (Factory set)
2. Pneumatics operating pressure: 60-80 psi (for air valve systems)
3. Maximum water source temperature 140° F
4. Operating ambient temperature: 40-120° F
5. Electrical supply(if pump system purchased from HFI) a. 120 single phase or 208/230 (3-phase) b. 1.5 hp pump 18 amps @ 120 volts single phase or 9 amps @ 230 volts single phase c. 1.5 hp pump 9 amps @ 230 volts three phase or 4.5 amps @ three phase
6. Operate solenoid valves with 24VAC, 24VDC, 120VAC a. 1.5 amp per port electric solenoids b. .3 amp per port air solenoids
7. Water supply a. 3/4” ID Line single operating pump feed b. Inlet pressure: 2-80 ps i
i. If pumps are fed from tank, water level must be 54” above pumps.
8. Air supply a. 3/8” feed b. 1 CFM @ 70 psi supply
9. Solution lines a. ½” poly lines (3/4” for high flow applications such as rain bars)
10. Space requirements: a. AQUA-LAB Systems
i. SD model – 2’ wide x 1.5’ high of wall space
b. Pump assemblies – pumps need to be within 6’ of the system to allow connection with the connection
hose included (longer connections can be run with customer supplied hose)
i. Single pump wall mount – 4’ x 1’ wall space
c. Electrical enclosures
i. Motor starter – 1.5’ wide x 1.5’ high of wall space
For Additional Support Call:
952.808.3640
© Hydra-Flex Inc 2011
Operating Manual
Table of Contents
Illustrations ............................................................................................................................................. - 1 -
Initial Injector Setup ............................................................................................................................... - 2 -
Injector Vacuum Check ......................................................................................................................... - 2 -
Nozzle Setup .......................................................................................................................................... - 2 -
Optimizing the System ............................................................................................................................ - 3 -
Injector vs. Metering Tip vs. Nozzle Changes .................................................................................. - 3 –
Application Optimization ................................................................................................................... - 3 -
Chemical Usage Measurement ............................................................................................................... - 4 -
Maintenance Schedule ........................................................................................................................... - 6 -
Valve Replacement ............................................................................................................................... - 6 -
Troubleshooting ...................................................................................................................................... - 6 -
Appendix ................................................................................................................................................. - 8 -
Chem-Flex Injector Dilution Ratio Chart …………………………………………………………...- 8 ­ Setup Starting Point ………………………………………………………………………………..- 9 ­ Chem-Flex Injector Listing ………………………………………………………………………...- 10 ­ Warranty ……………………………………………………………………………………………- 11 -
© Hydra-Flex Inc 2011
Operating Manual
- 1 -
Illustration
Aqua-Lab SD Air Operated Valve with Pilots
Air Pilot Valve
Valve
Hydra-Cannon Manif old
1 2 3 4 5 6 Water Ports
Aqua-Lab SD Electric Solenoi d Val ve
© Hydra-Flex Inc 2011
Operating Manual
- 2 -

Initial Injector Setup

(Based on field experience this is HFI’s recommended staring point)
1. Using the recommended starting point (appendix page 10) or the target flow rate and the chemical dilutions chart (appendix) install the appropriate injector into each port
2. Connect pre-run solution lines to each Injector
a. Be sure to use teflon tape when connecting the
injector to the coupler to ensure there are no leaks
3. Connect ¼” poly lines from each chemical container to the appropriate injector
a. Ensure a foot valve or similar check valve/filter is
installed on each line
i. These must be present or metering tips may clog
4. Metering tips will need to be installed to set dilution ratio (see appendix for ratio charts to determine tip)
If the spray nozzles on the arch are too small for the injector chosen, the back pressure put on the injector may cause the vacuum not to function and chemical will not be pulled. The back pressure should not exceed 66 psi. Back pressure gauges are available for purchase from HFI. (P/N 1001105) Water will continue to flow as normal.

Injector Vacuum Check (for troubleshooting injectors)

1. At the ChemFlex injector, remove the chemical feed line from the injector hose barb.
2. Attach the tubing of the vacuum gauge to the ChemFlex hose barb
3. With the pump(s) on, manually activate the chemical that is to be tested at the main car wash control cabinet. An injector that is working properly will have a reading greater than or equal to (≥) 20 in Hg
4. If injector is not functioning:
a) Check metering tip for clogs (can be tested with no metering tip to ensure injector is performing) b) Try smaller injector (this will produce less flow and thus less backpressure) c) Remove a nozzle(s) at the arch, allowing water to free flow (this will reduce backpressure)
5. Repeat steps 2-4 for each chemical lane that a vacuum reading is needed for.
6. Once testing is complete, turn off the pump from the main car wash control cabinet.
There is a variation of performance in the injectors that comes from slight variations in the dimensions of the parts and in assembly that are unavoidable. It is common to see the resultant vacuum range from 20 in Hg all the way up to 28. There is also variation in the through hole size on the meter tips from Dema (within their manufacturing tolerances). Using the same tip color from site to site is a good starting point. However with the potential for variation from part to part it is reasonable to still need to do some adjustments from there.

Nozzle Setup (optional f or maxim ized optimization)

Using the recommended starting point (appendix) install the recommended nozzles
o This may involve removing and plugging some ports o Due to the lower water usage determined by the injector of the AQUA-LAB you will need to match the
flow of the application device to the injector
o Setup the nozzle spray patterns to “paint” the car - slightly overlapping each other
© Hydra-Flex Inc 2011
Loading...
+ 9 hidden pages