Husky Liners 5704 User Manual

PART NO. 5704
98-02 DODGE DURANGO REAR MUD GUARD
INSTALLATION INSTRUCTIONS
Please read instructions thoroughly before installation.
Tools Required
1/8” drill bit / Drill
Center punch
NOTE: It may be necessary to remove the rear wheels for mud guard installation.
1. Clean and degrease the mud guard location area on the fender before installation.
Package Contents
Driver & passenger side rear mud guard
#10 screw (qty. 8)
U-Clip (qty. 4)
Instruction sheet
2. Remove factory fasteners from locations A and B (Figure 1).
3. Attach mud guard to rear fender with #10 screws at locations A and B, thru mud guard, fender, fender liner, and into a U-clip on the backside of the liner (Figure 2). Check fit and alignment before tightening.
NOTE: The U-Clip is used as a nut for the #10 screw and does not clip over the fender or liner panel.
4. Using the mud guard as a template, center punch and drill an 1/8” hole at location C and D (Figure 1).
5. Install a #10 screw at locations C and D.
PAINTING INSTRUCTIONS
1. Clean mud guard with a soap and water solution to remove dirt and other contaminates.
2. Sand painting surface with 320 grit sand paper.
3. Apply a coating of flexible primer-adhesion promoter.
4. Apply a flexible paint as directed by the paint manufacturer.
5704 Rear Instructions.doc
Rev: 0
Loading...