HUCK Seiltechnik MAXI Assembly Instructions Manual

Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Assembly Instructions
-
Easy – Swing “MIDI“, Art. 4591-50- 2
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Operator: _____________________________________________________
Location: _____________________________________________________
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 3
Table of contents
Assembly Instructions ..........................................................................................................................1
Introduction installation.........................................................................................................................4
Data sheet ...............................................................................................................................................6
Scope of supply, parts list with part numbers ....................................................................................8
Assembly instructions.........................................................................................................................12
Examination after installation .............................................................................................................17
Maintenance Instruction......................................................................................................................17
Introduction maintenance....................................................................................................................18
General maintenance information......................................................................................................19
Regular maintenance...........................................................................................................................21
Regular maintenance (Text) ...............................................................................................................22
Maintenance timetable.........................................................................................................................23
Monthly Maintenance..........................................................................................................................24
Quarterly maintenance.........................................................................................................................24
Half-yearly maintenance......................................................................................................................24
Annual main inspection.......................................................................................................................25
Maintenance printout...........................................................................................................................26
Hand-over document............................................................................................................................28
List of Tables
Table 3-1: Scope of supply, parts list with part numbers............................................ 8
Table 3-2: Scope of supply, in symbols...................................................................... 9
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 4
Introduction installation
General information
This equipment should be installed, inspected, maintained and operated in ac­cordance with EN1176-7 guidelines.
Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
Please consider that the installation has to be carried out only on even terrain (max. slope up to 3%).
Any spare parts that may be required can be obtained directly from your sup­plier.
Please do not hesitate to call your supplier if you have any problems during in­stallation or in case of any other questions.
Following installation, complete assembly instructions, maintenance in­structions and maintenance record must be sent to the operator who must confirm receipt in writing. See the last page of this document
All nuts and bolts are hot-dip galvanised or stainless steel. One of the characteristics of stainless steel is that uncontrolled cold weld-
ing may occur when the nuts are tightened. To prevent this, it is neces­sary to spray the nuts and bolts with Teflon spray or another similar lubri­cant.
We hereby confirm that this play equipment has been tested and certi­fied in accordance with the play equipment standard EN 1176.
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 5
Drawings / Views All optical illustrations simply demonstrate the proportions/dimensions
to be followed, but are not binding, technical equipment images. Technical modifications supporting the advancement of our articles are
subject to change. Measurement tolerances Due to the quality and characteristics of equipment parts, minor dimen-
sional tolerances over drawings data are possible. This regards all visible dimensions, except for foundation dimensions
respectively dimensions below OK ground surface/play surface.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 6
Data sheet: Easy- Swing Maxi & Midi
1. Space required: 3,00 m x 0,60 m (4591-50-1 and 4591-50-2) resp. 2,80 m x 7,40 m includ­ing safety distance (see top view) Height of fall: 1,30 m each
2. Required safety surface:
Ground surface
material
Description
mm
Minimum layer
thickness mm
Maximum
hight of fall mm
Topsoil grass
<= 1000*
Chipped bark Grain size 20 – 80 300/400 <= 2000/3000 Wood chippings Grain size 5 – 30 300/400 <= 2000/3000 Sand Grain size 0,2 – 2 300/400 <= 2000/3000 Gravel Grain size 2 – 8 300/400 <= 2000/3000 Other ground surface
materials
As recommend by manufacturer
*In Germany, lawn is a sufficient ground surface material for heights up to 1,50 m.
3. Name and Size of the largest part of the equipment:
2 steel posts Ø 102 mm - 3,00 m long
4. Intended age group: 2 years and up
5. Attention! Equipment to be embedded in concrete Concrete: C25/30 Concrete requirement: ~ 0,7 m³ (per play equipment = 2 foundations!) Size of excavation: 2 x 0.80 m long x 0,80 m wide, total depth 0,90 m including 10 cm drainage layer. Size of foundation: 2 x 0.80 m long x 0,80 m wide, height 0,60 m
.
Round off foundation edges (min. R = 100 mm)! Sizes of founda­tions are designed for soils classification “4-5” (natural ground).
Soil classification 4: Soft to medium plasticity, interleave bound, with minor sediment (sediment < 30% larger than 63 mm grain size in diameter Soil classification 5: Ground with soil classification 3 and 4 with more sediment (sediment > 30% larger than 63 mm grain size in diameter) In case of sandy and soft soils, the surface measure of foundations has to be enlarged for about 50%!
4. Assembly time once both steel masts are embedded in concrete: Approx. 45 minutes (per play equipment!!!). Number of persons re­quired: 2
5. Required accessories: Small excavator, ladder of about 2m length, wa-
ter balance, various wrenches resp. Allen wrenches.
6. Any spare parts which may be required can be obtained directly from
your supplier.
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 7
7. We hereby confirm that this item of play equipment has been tested and certified in accordance with the play equipment standard EN 1176.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 8
Scope of supply, parts list with part numbers
In letters
Table 3-1: Scope of supply, parts list with part numbers
Pos. Quantity
Element / description
Size O.K. Missing
VARIO-element, part no. 4591-30 - (11) 1
2
Steel post
Ø 102 mm - 3,00 m long
2
2 Red plastic caps
for Ø 102 mm
3
2 Tube clamps
for Ø 102 mm M10 x 40 mm lg.
4
1 Traverse
(with pre-assembled swing-bearings)
5
2 Tube clamps with threaded bolt
M10 x 150 mm + 2 nuts
for Ø 102 mm
6
1 Play equipment part (swing-
element)
Mini 500 x 650 x 850
Maxi 750 x 950 x 750
100
1 Paint (1 can) + paint brush
101
6 Self-cutting screws
5,5 x 25 mm
102
2 Loctite 3 ml. (each) 2
Support slab (e.g. sidewalk slab) (to be provided by customer –
not included in scope of sup­ply!)
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 9
In symbols
Table 3-2: Scope of supply, in symbols
Pos.
Quantity
Symbol
1
2
Ø 102 mm - 3,00 m long
2
2
for Ø 102 mm
3
2
für Ø 102 mm
4
1
(VO)
5
2
for Ø 102 mm
6
1
Part no. 4591-50-1
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
(6)
(1)
(Part no. 4591-50-2)
100
1
101
6
5,5 x 25 mm
102
2
Loctite (thread locking) 3 ml. (per bottle)
2
Support slab (e.g. sidewalk slab) (To be provided by customer – not included in scope of supply!)
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Abbreviations and signs: AB
Setting time for concrete C25/30 at least 7-8 days
AM
Dimension between axes (centre-centre) post
LM
Clear post dimension
D
Concrete C25/30 (for foundation)
DR
Top view / outlineß
F
Fall protection
FR
Radius of upper edge of foundation at least 10 cm
Gehw. Pl.
Support slab (e.g. sidewalk slab) is to be provided by cus­tomer and then placed underneath posts! Upper edge – per­colation layer (see drawing)
G
Percolation layer 10 cm
VA
Front view A
O.K
O.K. play level
PS
Space required including safety area
Upper edges of concrete are rounded! Foundation sizes apply for regular soil classification 4-5 (grown surface). Soil classification 4:
Light up to medium plasticity, interlaced, with little sediment (proportion < 30 % larger than 63 mm grain size in diameter). Soil classification 5:
Grounds of soil classification 3 and 4 with more sediment (proportion > 30 % larger than 63 mm grain size in diameter) For safety reasons on soft, sandy surfaces, foundation is to be made larger in diameter.
ML
Height of mast above play level
M.lot!!
It is mandatory to mount posts perpendicular and horizontal!
See drawings
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Assembly Instructions
The images (individual drawings) are not true to scale!!
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Examination after installation
If the equipment is not installed in a secure manner you must ensure that access is closed to the public!
Marking the filling level
Markings on the equipment to indicate filling levels of fall protection material (for example of loose filling material).
The equipment has not been installed safely in the following cases:
Installation of equipment is not complete.
The protective surface has not been installed.
The guarantee of safety in operation cannot be given by the appropriate main-
tenance works.
Removing assembly accessories
Please make sure that all accessories, which were used for the installation of the equipment, are removed from the play area! Only then the equipment can be declared open.
Details concerning inspection of the equipment prior to the first use
no special inspection required.
Retighten bolts
After one week of operation, please retighten all bolts again. Later upon re­spective maintenance.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Maintenance Instructions
Easy - Swing “MAXI”, part no. 4591-50- 1 - Easy – Swing “MIDI“, part no. 4591-50-2
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
Introduction Maintenance
General information
This equipment should be installed, inspected, maintained and operated in ac­cordance with EN 1176-7 guidelines.
Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
Any spare parts which may be required can be obtained directly from your supplier.
This equipment should only be assembled, maintained and repaired by
persons with the necessary expertise. A copy of the inspection record is to be handed out to the operator,
who must confirm receipt.
This maintenance instruction is based on the standard “EN 1176-1:2008”
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 1
General maintenance information
Maintenance intervals
Maintenance intervals are based on average use. Please note that more fre­quent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Inspection frequency
The frequency of inspections must be based on actual use. Factors that affect frequency include vandalism, location (e.g. coastal proximity), air pollution and the age of the equipment.
Maintenance products and procedures
All nuts and bolts are hot-dip galvanised or stainless steel. One of the charac­teristics of stainless steel is that uncontrolled cold welding may occur when the nuts are tightened. To prevent this, it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant.
Spare parts
All spare parts must conform to the manufacturer’s specifications.
Identifying spare parts
All replacement parts are listed in the parts list. The parts list can be found in chapter 3.
Special instructions for the disposal of individual equipment components
No special instructions are necessary.
Special measures in the starting time
No later than 2 weeks after assembly, all screwed connections should be checked and tightened if necessary.
Maintenance of protective surfaces
Surfaces providing fall protection must also be maintained regularly. It is par­ticularly important to maintain the correct level of loose surface material and add more if necessary.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Faults
Damages must be repaired as soon as they are detected. If serious de­fects that affect the safety cannot be repaired straight away, the play­ground item must be closed to the public with immediate effect.
Loose screws
Loose screws always cause quality problems and put safety at risk. Therefore, loose screws should always be tightened and checks carried out to ensure that there are no missing screws.
Preventing equipment use
The use of the equipment should be prevented in case of incomplete installa­tion, disassembly, maintenance, repairs and faults.
Claims/liability for faults (steel posts)
Steel posts and footings are covered by our guarantee if regular maintenance is carried out and recorded in writing.
Our general terms and conditions apply. Maintenance of steel poles first takes place after 3 years. The steel posts must be excavated down to the concrete foundations and checked for corrosion.
Zinc paint should be applied to any corroded areas and scratches.
Check ropes for abrasion, replace ropes where coating is damaged down to the steel inlet.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Regular Maintenance
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Regular maintenance (Text)
m = monthly ¼ j = quarterly ½ y = half-yearly
m
¼ y ½
y
1.
Check the ground surface of fall protection for hard objects and loose foundations.
X
2. Check stability (posts, springs, braces, foundations, etc.).
X
3.
Ceck all connecting elements and fittings for wear and tear and tighten if necessary. Replace damaged parts.
X
4.
Check that moving metal parts (joints, springs, etc.) move smoothly and are not worn. Replace if necessary. It is not necessary to lubricate joints as we only use maintenance-free roller bearings.
X
5.
Check all attachments such as chains, ropes, nets, etc. for damage and replace if necessary.
X
6.
Check rubber parts, sleeves, bearing ring, etc. for wear and tear or dam­age and replace if necessary.
X
7.
Check the surface of wooden parts for damage caused by the weather or external influences. Repair (apply varnish) or replace if necessary.
X
8.
Check the surface of plastic and metal parts, e.g. slides, for damages and replace if necessary.
X
We strongly advise to carry out inspection and maintenance work within the speci­fied periods as use of the equipment, the weather and malicious vandalism cause wear and tear that compromise safety and function of the equipment.
In the event of fault that compromises safety, quick action must be taken: Either the equipment must be repaired immediately, or it has to be dismantled or closed to the public!
Faults that compromise function should also be repaired immediately. Such faults lower the value of the equipment to the user and encourage malicious vandalism, which may render the equipment less safe. Any damages should be repaired imme­diately.
Maintenance and repair must be made by someone with the necessary exper­tise.
General information: Providing any necessary inspections and repairs are
carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Maintenance Timetable
Special advices Maintenance interval
We strongly advise to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious vandal­ism cause wear and tear that compromises the safety and function of the equipment.
Maintenance intervals in the event of intensive use
Please note that more frequent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Faults that compromise safety
In the event of a fault that compromises safety, quick action must be taken: the item has to be blocked immediately and repaired or disman­tled.
Faults that compromise function
Faults that compromise function should also be repaired immediately. Such faults lower the value of the equipment to the user and encourage malicious vandalism, which may render the equipment less safe. Any damages should be repaired immediately.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Monthly Maintenance
Check the spaces between the equipment and the ground (clearance and height of fall).
Check the ground surface of fall protection for hard objects and loose foundations.
Check all connecting elements and fittings for wear and tear and tighten if necessary. Replace damaged or missing parts.
Check that moving metal parts (joints, springs, etc.) move smoothly and are not worn. Replace if necessary. It is not necessary to lubricate joints as we only use maintenance-free metal roller bearings.
Check all attachments such as chains, ropes, nets, etc. for damage and replace if necessary.
Check all rubber parts, seals etc. for wear and tear or damage and re- place if necessary.
Check the surface of wooden parts for damage caused by the weather or external influences and mould. Repair or replace if necessary.
Check the surface of plastic and metal parts, e.g. slides, for damage and replace if necessary.
Quarterly maintenance
Detailed inspection of the operation and stability of the equipment pay- ing particular attention to any wear and tear.
Tighten all forms of attachment.
Repaint and retreat surfaces.
Maintenance of fall protection surfaces.
Check height of fall protection material and fill up with loose filling mate-
rial if necessary. If the posts are marked, fill up correspondingly.
Retighten all bolts.
Half-yearly maintenance
The stability of supporting posts, supports, foundations etc. has to be checked. The safety of the entire system has to be checked after repairs are carried out or additional system components have been installed or replaced.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Annual main inspection
Check if the equipment, foundations and surfaces are safe for operation.
The equipment is to be verified according to rotting and corrosion. For
that some parts might have to be excavated. Zinc paint should be applied to any corroded areas and scratches.
Check complete stability (check posts, bracing, foundations, etc.).
Ascertaining whether there are any changes in equipment safety as a re-
sult of repairs that have been carried out or components that have been added or replaced.
The equipment must be inspected by someone with the necessary ex­pertise in strict compliance with the instructions issued by Huck Seiltech-
nik GmbH.
A copy of the inspection record should be given to the operator, who must confirm receipt.
Revision 0 – 2008-09-25
First released version Assembly instruction Revision – 2008-09-25 All rights reserved © Copyright 2008 Huck Seiltechnik GmbH
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Maintenance Printout
Name of equipment: Maxi & Midi Easy Swing _____ Art No. 4591-50-1 & 2 Location: ________________________________________________________________________________________ Customer or operator: ______________________________________________________________________________
(Town, Council, School, etc)
Date of
inspection
Inspector O.K. Accessible Closed
Defects Repaired by Date
Please copy and return to the manufacturer by fax +49 (0)6443 / 83 11 79 once a year after main inspection has been carried out! Place the confirmation form in your existing play equipment files.
HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
seiltechnik@huck.net - www.huck.net
\\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4591-50S-1+2-01-en-004.doc 2
Hand Over Document
After the installation of the equipment, the installation and maintenance documents are to be handed over to the operator. The operator has to have the documents signed. The complete filled and signed hand over documents are to be sent back to the supplier!
Part no.: 4591-50 – 1 / 4591-50-2 Type of equipment: ____ Easy – Swing „MAXI“ / EASY- Swing „MIDI“ Serial number: _____________________________________________
Customer or operator (Town, Council, School, etc.):
___________________________________________________________ ___________________________________________________________
Person in charge:
___________________________________________________________ ___________________________________________________________
Installation Company (address):
___________________________________________________________ ___________________________________________________________
Assistant in charge (assembler):
___________________________________________________________ ___________________________________________________________
Complete assembly instruction, maintenance instruction and maintenance printout received,
___________________________________________________________
(Signature of operator) (Signature of Installation Company) (Stamp)
Date: ________________________
Loading...