Hubbell Electric Heater F60 Installation Manual

OPERATING AND MAINTENANCE MANUAL FOR
INSTANTANEOUS STEAM FIRED WATER
HEATER
ELECTRIC HEATER COMPANY
BASE MODEL “ F ”
Edition 2013
HUBBELL
ELECTRIC HEATER COMPANY
P.O. BOX 288
STRATFORD, CT 06615
PHONE: (203) 378-2659 FAX: (203) 378-3593
INTERNET: http://www.hubbellheaters.com/
-- IMPORTANT --
Always reference the full model number and serial number when calling the factory.
WARNING / CAUTION
1. FLUIDS UNDER PRESSURE MAY CAUSE INJURY WHEN RELEASED.
Always shut off all incoming and outgoing valves and carefully decrease all trapped pressures to zero before opening any covers, piping or gauge connections, etc.
HOT WATER OR HOT SURFACES CAN CAUSE SEVERE BURNS. Wear
safety goggles and protective gloves when carrying out maintenance procedures involving the heater and/or when removing and accessories from the heater. Shield your eyes and body to protect from spray when opening a relief valve. Due to the rigors of transportation, all connections should be checked for tightness before heater is placed in operation.
2. Safety relief valve must be installed according to local plumbing codes.
KEEP AWAY FROM LIVE ELECTRICAL CIRCUITS. Do not perform any maintenance, make any adjustments, or replace any components inside the control panel with the high voltage power supply turned on. Under certain circumstances, dangerous potentials may exist even when the power supply is off. To avoid casualties, always turn the power supply safety switch to off, turn the charge or ground the circuit before performing any maintenance or adjustment procedure. Generalized instructions and procedures cannot anticipate all situations. For this reason, only qualified installers should perform the installations. A qualified installer is a person who has licensed training and a working knowledge of the applicable codes regulation, tools, equipment, and methods necessary for safe installation of a steam fired water heater. If questions regarding installation arise, check with your local plumbing and electrical inspectors for proper procedures and codes.
SECTION TITLE PAGE No.
I GENERAL DESCRIPTION AND CONSTRUCTION 6
II INSTALLATION 8
III START-UP AND PROCEDURE 11
IV MAINTENANCE 13
V TROUBLESHOOTING 20
VI MISCELANEOUS CHARTS AND FORMULAS 23
2
Loading...