HPJ SERIES UNLOADED PANEL ASSEMBLY INSTRUCTIONS
Control No. Page of
HWS77534801
1
Rev. Date:
7/12/161
1
1
2
Mounting Panel To Rack
Using the supplied mounting screws and washers, mount the
patch panel to the desired position on a 19" relay rack.
Adapter Mounting
Place the 6 port adapter housing onto the panel opening edge
with the label eld on top. Rotate the adapter into the panel until
the snaps engage the metal.
Jack Termination & Assembly to Panel
3
1. Terminate individual jack, snapfits and
modules utilizing instruction sheets supplied
with those parts.
2. Insert all terminated jack, snapfits or
modules into unloaded panel adapter
housing as shown.
Labeling
4
Paper label insert
Clear label cover
1. Use the provided paper label insert to identify the
ports on the panel.
2. Starting from one end of the label eld, slide the paper label
insert into label eld under the retaining tabs.
3. Slide the clear label cover over paper label.
Optional laser printable label bulk pack available.
P/N: HPJLBL4800
SPRING LATCH
FIXED LATCH
Label eld up Rotate until snaps on adapter
fully engage panel
Note: Adapter housings can be installed with or without terminated
connectors installed in them.
Optional Cable Management Bar, P/N HPRCMB
5
1. Install one end of the bar into the slot in the
bracket.
2. Slightly bend the other end inward while
engaging it into the slot in the opposing
bracket.
Cable Manager Bracket
Hubbell Premise Wiring, HUBBELL INCORPORATED (Delaware)
23 Clara Dr Suite 103 Mystic, CT 06355 (800) 626-0005, Fax (860) 535-8328
14 Lord's Hill Rd, Stonington CT 06378 (800) 626-0005, Fax (860) 535-8328
Hubbell Premise Wiring, HUBBELL INCORPORATED (Delaware)
www.hubbell-premise.com
www.hubbell-premise.com